Mentions: September 2026
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 2 |
Skokie 345/138 kV Transformer 82 ComEd-2024-021 · s3824 |
Skokie | Status Engineering |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 4 |
Customer Expansion in Chicago ComEd-2025-004 · s3823 |
station Y764-2 | Status Engineering Cost $0M In service 12/31/27 Load 52 MW |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 6 |
MISO Tranche 2.1 Request ComEd 2024-023 · s3843 |
Babcock Collins Des Plaines Green Acres Katydid Lakeview Nevada Olive Paris Pleasant Prairie Powerton University Park Woodford County New Zion |
Status Conceptual Cost $908.7M In service 6/1/2034 |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 8 |
138 kV L1206 Circuit Switcher ComEd-2025-006 · s4006 |
Channahon | Status Conceptual Cost $0.4 M In service 3/31/2030 |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 10 |
138 kV L1205 Circuit Switcher ComEd-2025-007 · s4007 |
Mazon | Status Conceptual Cost $0.4 M In service 3/31/2030 |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 12 |
Lockport 345 kV BT 1-2 CB ComEd-2025-018 · s4008 |
Lockport Lombard |
Status Engineering Cost $2.2M In service 12/31/2025 |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 14 |
Plano 345 kV BT 5-6 CB ComEd-2025-022 · s4010 |
Electric Junction Plano |
Status Conceptual Cost $3.9M In service 12/31/2026 |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 16 |
Cherry Valley 138 kV 1-2 CB ComEd-2025-023 · s4011 |
Cherry Valley | Status Conceptual Cost $2.6 M In service 12/31/2026 |
| 2026-09-30* | SRRTEP Western Datyon local plan submission of the supplemental projects for 2026 RTEP p. 2 |
Dayton Transmission Zone M-3 Process Dayton-2021-003 · s3846.1 – .4 |
Camden Crystal Germantown Gratis Hutching Hutchings |
Status Conceptual Cost $6.2M In service 12/1/2028 Load 33MW |
| 2026-09-30* | SRRTEP Western Datyon local plan submission of the supplemental projects for 2026 RTEP p. 4 |
Dayton Transmission Zone M-3 Process Miami County Lost Creek Township Dayton-2025-011 · S3847.1 |
East Casstown St. Paris Staunton |
Cost $8M In service 12/31/2027 |
| 2026-09-30* | SRRTEP Western Datyon local plan submission of the supplemental projects for 2026 RTEP p. 6 |
Dayton DBA AES Ohio Transmission Zone M-3 Process Dayton-2023-003 · S3752.1 - .3 |
Amsterdam Botkins Jackson Center New Knoxville Delivery Point New St. Marys |
Status Conceptual Cost $ 43.2 M In service 10/2029 Load ~16MW |
| 2026-09-30* | SRRTEP Western Datyon local plan submission of the supplemental projects for 2026 RTEP p. 8 |
Dayton Transmission Zone M-3 Process Auglaize County, OH Dayton-2021-004 · S3751.1 - .6 |
Chippewa New Indian Lake Waynesfield Wrestle Creek New |
Status Conceptual Cost $61.3M In service 4/01/2030 |
| 2026-09-30* | SRRTEP Western Datyon local plan submission of the supplemental projects for 2026 RTEP p. 10 |
Dayton Transmission Zone M-3 Process Jeffersonville, Wilmington, OH Dayton-2025-001, Dayton-2025-002 · s3898.1 – .9 |
Atlanta Clay Clinton Fayette Greene |
Status Engineering Cost $589.8 M In service 01/2031 Load 1.5 GW |
| 2026-09-30* | SRRTEP Western Datyon local plan submission of the supplemental projects for 2026 RTEP p. 14 |
AMPT Projects in DAY Transmission Zone M3 Process Versailles, OH AMPT-2024-001 · s3734.1 (AMPT), s3734.2 (AMPT), s3734.3 (AMPT), s3734.4 (AMPT), s3734.5 (AMPT), s3734.6 (AMPT), s3734.7 (AES), s3734.8 (AES) |
Baker Road New Greenlawn McGreevey Road Station New Rossburg Russia Water Street |
Status Engineering Cost $66.6 M In service 6/30/2028 Load 16 MW |
| 2026-09-30* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2026 RTEP p. 2 |
Front Street DEOK-2024-007 · s3703.1 |
Front Street New West End |
Status In Construction (Under construction) Cost $41,915,473 In service 01/22/2030 |
| 2026-09-30* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2026 RTEP p. 4 |
Sutton Ridge-Miami Fort DEOK-2024-008 · s3806.1 |
Greendale Miami Fort Sutton Ridge |
Status Scoping (Conceptual) Cost $5.3M* In service 6/1/2032 |
| 2026-09-30* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2026 RTEP p. 6 |
Wilder-Decoursey DEOK-2025-001 · s3863.1 |
Beaver Claryville Decoursey White Tower Wilder |
Status Engineering Cost $7,210,650 In service 10/19/2027 |
| 2026-09-30* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2026 RTEP p. 8 |
Mt. Healthy Substation Rebuild DEOK-2026-002 · s3910.1 - .3 |
Finneytown Mapleknoll Mt. Healthy Willey |
Status Engineering Cost $8.6M In service 05/07/2029 |
| 2026-09-30* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2026 RTEP p. 10 |
Customer Load Request DEOK-2026-004 · s3909.1 - .6 |
Beckjord Pierce Woodsdale |
Status Scoping (Conceptual) Cost $32.8M In service 06/01/2029 Load 300 MW |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 2 |
New Customer Connection APS-2024-110 · s3755.1 |
Dutch Fork Windsor |
Status Conceptual Cost $5.8 M In service 08/14/2026 Load 20 MW |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 6 |
Leadsville – Loughs Lane 138 kV Misoperation Relays APS-2024-112 · s3770.1 |
Leadsville Substation Loughs Lane Substation |
Cost $2.30M In service 9/28/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 9 |
Weirton - Wylie Ridge 138 kV Misoperation Relays APS-2024-025 · s3771.1 |
Weirton Substation Wylie Ridge Substation |
Cost $4.50M In service 07/20/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 12 |
Rider – Weston 138 kV Line: Customer Connection APS-2025-011 · s3772.1 |
Rider Weston Substation |
Cost $0.92 M In service 4/29/2028 Load 22.4 MVA |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 14 |
Gore - Hampshire 138 kV Line APS-2024-029 · 3773.1 |
Gore Substation Hampshire Substation |
Cost $23.12M In service 12/29/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 16 |
Kammer Substation APS-2025-020 · s3776.1 |
502 Junction Substation Kammer Substation |
Cost $9.25 M In service 8/15/2030 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 18 |
Oak Mound Control Building and Breakers APS-2024-095 · s3777.1 |
Glen Falls Substation Oak Mound Substation Quiet Dell Substation |
Cost $13.35M In service 6/16/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 21 |
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line APS-2024-089 · s3778.1 |
Oak Mound Substation Quiet Dell Substation |
Cost $2.63M In service 6/16/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 24 |
Misoperation Relays: Armstrong - Kittanning 138 kV Line APS-2024-010 · s3865.1 |
Armstrong Substation Kittanning Substation |
Cost $3.44M In service 09/10/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 27 |
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line APS-2024-102 · s3866.1 |
Belmon Charleroi Mitchell Smithton Substation Yukon |
Cost $3.71M In service 10/31/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 31 |
Misoperation Relays: Cecil – Enlow 138 kV Line APS-2024-105 · s3867.1 |
Cecil Enlow |
Cost $4.0M In service 06/11/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 34 |
Price Hill Substation APS-2025-028 · s3868.1 |
Price Hill Substation | Cost $0.10M In service 04/03/2026 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 36 |
Eaglehead - Monocacy 230 kV Line APS-2025-003 · s3869.1 |
Eaglehead Substation Monocacy Substation |
Cost $3.88M In service 08/24/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 38 |
Wylie Ridge No. 3 345/138 kV Transformer APS-2024-079 · s3870.1 |
Wylie Ridge Substation | Cost $13.45M In service 12/13/2030 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 40 |
Carroll - Mount Airy 230 kV line APS-2023-058 · s3871.1 |
Carroll Mt. Airy |
Cost $50M In service 06/30/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 42 |
Elko No. 1 230/138 kV Transformer APS-2025-012 · s3874.1 |
Elko Substation | Cost $6.69M In service 06/01/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 44 |
Grand Point – Roxbury 138 kV APS-2024-028 · s3880.1 |
Grand Point Greene Substation Letterkenny Substation Roxbury Substation |
Cost $28.34M In service 06/15/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 47 |
Junction – Parr Run 138 kV APS-2024-096 · s3875.1 |
None named | Cost $35M In service 06/16/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 49 |
Page-Riverton 138 kV New Customer APS-2023-014 · s3127.1 (Cancellation) |
Catlett Mountain New | Status Cancellation (Cancelled) Cost $16M In service 05/30/2025 Load 35 MVA |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 51 |
Yukon No. 7 500/138 kV Transformer APS-2025-030 · s3885.1 |
Yukon | Cost $0.41M In service 12/31/2026 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 53 |
Loughs Lane - Pickens 138 kV Line APS-2025-016 · s3886.1 |
None named | Cost $1.05M In service 12/31/2026 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 55 |
Glenville - Weston 138 kV Line APS-2024-074 · s3887.1 |
Glenville Weston Substation |
Cost $89.52M In service 12/15/2030 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 58 |
Bethel Park, PA APS-2025-026 |
Bethel Park Substation | Status cancellation (Cancelled) |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 60 |
North Shenandoah – Page 138 kV Line APS-2024-085 · s3937.1 |
North Shenandoah Substation Page |
Cost $4.06M In service 06/01/2029 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 62 |
Loughs Lane – Pickens 138 kV Line APS-2023-032 · s3938.1 |
Beverly Substation Durbin Substation Loughs Lane Substation Pickens |
Cost $182.84M In service 11/04/2032 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 65 |
Gordon – Nyswaner 138kV Line APS-2024-055 · s3939.1 |
Gordon Nyswaner |
Cost $30.12M In service 12/29/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 68 |
Dutch Fork – Enon 138 kV Line APS-2023-033 · s3930.1 |
Dutch Fork Enon Substation |
Cost $41.70M In service 12/08/2029 Load 93 MW |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 70 |
Misoperation Relay Projects APS-2024-101 |
None named | Status Cancellation (Cancelled) |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 72 |
Rhodes Lane - Yukon 500 kV Line APS-2025-029 · s3931.1 |
Rhodes Lane Substation Yukon |
Cost $5.45M In service 05/12/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 74 |
Shingletown Substation APS-2023-059, PN-2023-022 · s3932.1 |
Lewistown Substation Shawville Substation Shingletown Substation |
Cost $19.11M In service 06/25/2029 Load 82.7 MW |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 76 |
Mitchell Substation APS-2024-073 · s3933.1 |
Mitchell | Cost $11.01 M In service 06/02/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 78 |
Misoperations Relays APS-2024-086 · s3934.1 |
Junction Substation Parr Run |
Cost $4.67 M In service 12/31/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 80 |
Misoperations Relays APS-2025-005 · s3935.1 |
Shepherdstown Substation Sleepy Hollow |
Cost $2.60 M In service 08/04/2028 |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 82 |
Smithton Substation APS-2026-001 · s3936.1 |
Smithton Substation | Cost $11.52 M In service 12/17/2027 Load 10 MW |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 85 |
Monroeville, PA DLC-2024-003 · s3928.1, s3928.2 and s3928.3 |
Cheswick Substation Huntingdon Substation McGinley Substation New |
Cost $46.3 M In service January 2029 Load 250 MW |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 87 |
New Customer Request APS-2026-004 · s3980.1 |
None named | Cost $22.75M In service 12/18/2026 Load 80 MW |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 3 |
Crossland – Sharon 138 kV Z-112 Line Customer Connection ATSI-2025-013 · s3768.1 |
Crossland Sharon |
Cost $0.9M In service 6/11/2027 Load 80 MVA |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 5 |
Homer – Wellington 69 kV Line Customer Connection ATSI-2025-014 · s3769.1 |
Homer Wellington |
Cost $0.9M In service 3/15/2026 Load 6.5 MVA |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 7 |
Carlisle-Lorain 138 kV Line Relay Misoperation ATSI-2024-078 · s3774.1 |
Carlisle Lorain Substation |
Cost $3.58M In service 12/31/2027 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 10 |
Ivanhoe – Packard 138 kV Customer ATSI-2024-047 · s3775.1 |
Ivanhoe Packard |
Cost $1.92M In service 7/28/2028 Load 10 MVA |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 12 |
Tusc Substation ATSI-2023-011 · s3779.1 |
Tusc Substation | Cost $16.72M In service 12/31/2027 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 15 |
Firestone Substation ATSI-2025-021 · s3780.1 |
Firestone Urban Substation |
Cost $0.3M In service 2/16/2026 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 18 |
Lemoyne Substation Upgrades for MISO Tranche 2.1 ATSI-2025-004 · s3844.1 |
Greenfield Lemoyne Ottawa |
Cost $100.86M In service 6/1/2032 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 20 |
Lallendorf Substation Upgrades for MISO Tranche 2.1 ATSI-2025-005 · s3845.1 |
Allen Junction Substation Lallendorf Substation |
Cost $7.21 In service 6/1/2032 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 22 |
Ashtabula – Ashtabula East 138 kV ATSI-2024-054 · s3872.1 |
Ashtabula East Substation | Cost $4.79M In service 12/18/2026 Load 16 MW |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 24 |
Maple - Pine 69 kV ATSI-2022-009 · s3873.1 |
None named | Cost $36.68M In service 05/19/2028 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 26 |
Cloverdale – Harmon 138 kV Line Customer Connection ATSI-2024-041 · s3499.1 9 |
Cloverdale Harmon |
Status Cancellation (Cancelled) Cost $0.8M In service 12/31/2027 Load 11 MVA |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 28 |
Newton Falls 138/69 kV Substation ATSI-2022-031 · s3877.1 |
Bridge Evergreen Substation Franklin Ivanhoe Newton Falls Newton Falls 138/69 kV Substation Ohio Star Forge Whitman Station New |
Cost $51.52M In service 12/21/2028 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 30 |
Multiple Line Rehab/Rebuild ATSI-2019-059 · s3878.1 |
McDowell Sharon |
Cost $63.7M In service 12/31/2030 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 32 |
Black River - Willow Creek 69 kV ATSI-2025-035 · s3879.1 |
None named | Cost $1.53M In service 12/31/2026 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 34 |
Cascade (Cedar Street) 69 kV Line ATSI-2022-001 · s3495.1 |
None named | Cost $34.7 M In service 3/31/2028 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 37 |
Cedar Street - Lowellville South 69 kV Line ATSI-2024-017 · s3890.1 |
Cedar St Lowellville |
Cost $30.79 M In service 10/05/2029 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 39 |
Akron/Summit County Area ATSI-2023-024 · s3891.1 |
Clayben Substation Lakemore McKnights Substation North Clayben New |
Cost $36.49M In service 06/01/2029 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 42 |
Nursery Substation 138 kV ATSI-2025-003 · s3940.1 |
Nursery Substation | Cost $25.58M In service 04/28/2028 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 45 |
Rockaway Substation 69 kV ATSI-2025-038 · s3941.1 |
Rockaway Substation | Cost $3.43M In service 06/22/2028 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 47 |
Chrysler Substation ATSI-2025-039 · s3942.1 |
Chrysler Substation | Cost $2.76M In service 12/31/2028 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 49 |
Crestline 69 kV Capacitor ATSI-2026-003 · s3943.1 |
Crestline Station | Cost $0.44M In service 04/16/2027 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 51 |
Pemberville Station ATSI-2026-013 · s3944.1 |
Pemberville Station | Cost $3.46M In service 12/31/2027 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 53 |
Bulk Mail Facility 138 kV ATSI-2026-002 · s3945.1 |
Bulk Mail Facility | Cost $1.69M In service 12/31/2027 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 55 |
Dixie 69 kV Substation ATSI-2026-005 · s3946.1 |
Dixie Substation | Cost $3.43M In service 12/31/2027 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 57 |
Medina/Seville Area ATSI-2021-021 · s3947.1 |
Medina Ryan Substation Seville Substation West Medina Substation |
No figures printed |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 64 |
Black River-Shinrock 69 kV Rebuild ATSI-2024-072 · s3948.1 |
Shinrock | Cost $67.65M In service 12/31/2029 |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 68 |
Orrville, OH AMPT-2023-004 |
Apple Ave sub East Wooster substation Mineral Springs sub New Power Plant sub |
Status Engineering Cost $68.741M In service 8/30/2030 Load 60 MW |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 71 |
Niles Central 138 kV substation AMPT-2025-005 |
Niles Central | Status Pre-Engineering (Engineering) Cost $14.1M In service 08/01/2028 Load 63 MW |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 73 |
Poe Road - Tontogany 69 kV line AMPT-2025-004 |
Poe Road substation Sand Ridge substation |
Status Pre-Engineering (Engineering) Cost $6.136 M In service 11/30/2028 |
| 2026-09-21* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2026 RTEP p. 2 |
Brunot Island Substation DLC-2026-001 · s3929.1 |
Brunot Island | Cost $0.825 M In service 12/31/2026 |
| 2026-09-21* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2026 RTEP p. 4 |
Monroeville, PA DLC-2024-003 · s3928.1, s3928.2 and s3928.3 |
Brunot Island Carson Substation Cheswick Huntingdon McGinley Substation New Springdale Yukon |
Cost $46.3 M In service January 2029 Load 250 MW |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 3 |
Misoperation Relays APS-2026-055 |
Double Toll Gate Meadow Brook |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 4 |
Misoperation Relays APS-2026-056 |
Meadow Brook West Winchester |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 6 |
Misoperation Relays APS-2024-103 |
Murrycrest Springdale Sunoco Delmont White Valley |
Status Conceptual Cost $4.63 M In service 12/31/2029 |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 8 |
Misoperation Relays APS-2024-111 |
Eldora McAlpin Pruntytown Substation Whitehall Junction |
Status Conceptual Cost $4.73 M In service 11/03/2028 |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 10 |
Misoperation Relays APS-2024-113 |
Back Fork Pickens |
Status Conceptual Cost $2.35 M In service 12/31/2028 |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 12 |
Misoperation Relays APS-2024-118 |
Pruntytown Substation Rivesville Stony Road |
Status Conceptual Cost $6.51 M In service 09/30/2026 |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 14 |
Misoperation Relays APS-2025-014 |
Finzel Frostburg No. 1 Substation Ridgeley |
Status Conceptual Cost $3.72 M In service 12/31/2030 |
| 2026-09-18 | SRRTEP Western Item 01 - APS Supplemental Projects p. 16 |
Misoperation Relays APS-2026-002 |
Glenville Goff Run Substation Grantsville |
Status Conceptual Cost $3.67 M In service 10/25/2028 |
| 2026-09-18 | SRRTEP Western Item 02 - ATSI Supplemental Projects p. 3 |
New Customer Request ATSI-2026-059 |
Longview Ontario |
In service 11/19/2027 Load approximately 10 MW |
| 2026-09-18 | SRRTEP Western Item 02 - ATSI Supplemental Projects p. 4 |
New Customer Request ATSI-2026-060 |
Chittenden Substation | In service 11/19/2027 Load approximately 22 MW |
| 2026-09-18 | SRRTEP Western Item 02 - ATSI Supplemental Projects p. 5 |
New Customer Request ATSI-2026-061 |
Ford Brookpark Substation Fowles Fox |
In service 1/2/2029 Load approximately 60 MW |
| 2026-09-18 | SRRTEP Western Item 02 - ATSI Supplemental Projects p. 7 |
Highland Station Control Building ATSI-2024-067 |
Highland Mahoningside |
Status Conceptual Cost $34.05 M In service 04/23/2029 |
| 2026-09-18 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 3 |
East Liverpool – North Wellsville AEP-2026-OH035 |
East Liverpool North Wellsville Saint Clair Avenue Second Street |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 5 |
South Cadiz - Robyville 69 kV AEP-2026-OH039 |
Robyville South Cadiz |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 6 |
Moundsville - Natrium 69 kV AEP-2026-OH037 |
McElroy Moundsville Natrium |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 9 |
Coleman - Stone 69 kV Line Rebuild AEP-2026-AP003 |
Barrenshe Coleman Peter Creek New Pinson Switch Station New Stone Tom Watkins |
Status Scoping (Conceptual) Cost $55.44 M In service 08/01/2030 |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 2 |
NIPSCO Customer Near State Line ComEd-2025-027 |
None named | Status Withdraw Need (Cancelled) Load 260 MW |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 4 |
138KV L10301 Circuit Switcher ComEd-2026-014 |
Butterfield Glen Ellyn Tap |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 5 |
138KV L14103 Transmission Switch ComEd-2026-015 |
Algonquin Tap North Huntley Tap |
No figures printed |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 6 |
Mendota ComEd-2026-016 |
None named | No figures printed |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 7 |
Burnham ComEd-2026-017 |
Burnham | No figures printed |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 9 |
Wolfs Crossing to Montgomery ComEd-2026-012 |
ESSW507 Main Line Tap Montgomery Montgomery tap Oswego Tap Wolfs Crossing |
Status Conceptual Cost $ 31.5M In service 12/31/28 |
| 2026-09-18 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 11 |
Bellwood ComEd-2026-013 |
Bellwood LaGrange Park LaGrange Park Tap McCook |
Status Engineering Cost $ 300K In service 11/30/2026 |
| 2026-09-18 | SRRTEP Western Item 05 - DEOK Supplemental Projects p. 3 |
New Customer Load Request DEOK-2025-006 |
City of Hamilton Substation Fairfield Substation Port Union Seward Substation |
Status Scoping (Conceptual) Cost $65.0M In service 12/31/2029 Load 240 MW |
| 2026-09-18 | SRRTEP Western Item 06 - EKPC Supplemental Projects p. 3 |
Casey County 161 kV Three-Terminal Concerns EKPC-2026-001 |
Casey Co | Status Engineering Cost $0.998 M In service 12/31/2026 |
| 2026-09-18 | SRRTEP Western Item 07 - SRRTEP West - Reliability Analysis Update Presentation p. 3 |
AEP Transmission Zone: Baseline
b4000.201 Scope Change b4000.201 |
Smith Mountain | Cost 1.4 M In service 6/1/2029 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 3 |
JCPL Transmission Zone – Scope Change
S3621.1 - Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection JCPL-2024-034 · S3621.1 |
Coke McGraw Hill Windsor Wyckoff Street |
Status Conceptual Cost $8.49 M In service 02/10/2031 Load 96 MVA |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 7 |
Jerseyville - Smithburg 34.5 kV X752 Line JCPL-2026-024 |
Englishtown Freneau Jerseyville Nestle Smithburg |
No figures printed |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 8 |
Phillipsburg Substation JCPL-2026-044 |
Morris Park Phillipsburg Warren Foundry |
No figures printed |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 10 |
Valley View Substation JCPL-2026-047 |
Murray Hill Traynor Valley View |
Load 16 MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 12 |
Bernardsville - Merck X726 34.5 kV Line Rebuild JCPL-2019-022 |
Bernardsville Greater Cross Road Long Lines Merck Peapack |
Status Conceptual Cost $63.95 M In service 12/29/2028 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 16 |
Gilbert - Pequest River 115 kV Line Rebuild JCPL-2024-039 |
Gilbert Morris Park Pequest River |
Status Conceptual Cost $81.55 M In service 06/29/2029 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 20 |
Jerseyville Auto Reclosing Upgrades JCPL-2024-041 |
Bradevelt Jerseyville Nestle Union Carbide |
Status Conceptual Cost $3.68 M In service 03/15/2028 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 23 |
Jerseyville Substation 34.5 kV Breaker Replacements JCPL-2026-003 |
Bradevelt Jerseyville Nestle Smithburg Union Carbide |
Status Conceptual Cost $2.69 M In service 09/07/2028 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 25 |
Lakehurst Substation 34.5 kV Breaker Replacements JCPL-2026-006 |
Lakehurst Navy Ship Test South Lakewood |
Status Conceptual Cost $4.23 M In service 03/15/2029 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 27 |
Manitou - Ocean Beach - Seaside Park D212 34.5 kV Line Rebuild JCPL-2026-009 |
Lavallette Manitou Ocean Beach Ortley Beach Seaside Heights Seaside Park Toms River |
Status Conceptual Cost $36.86 M In service 02/11/2029 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 31 |
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection JCPL-2026-011 |
Larrabee Point Pleasant |
Status Conceptual Cost $8.49 M In service 02/10/2031 Load 11 MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 33 |
Ocean Medical 34.5 kV Substation - Customer Connection JCPL-2026-023 |
Larrabee Ocean Medical Point Pleasant |
Status Conceptual Cost $540,000 In service 08/12/2027 Load 0.66 MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 35 |
Morris Park Substation 34.5 kV Breaker Replacements JCPL-2026-038 |
Marble Hill Morris Park Philipsburg Warren Glen SWPT |
Status Conceptual Cost $7.13 M In service 12/21/2028 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 02 - MetEd Supplemental Projects p. 3 |
Middletown Junction Substation ME-2026-010 |
Middletown Junction Middletown Substation |
No figures printed |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 02 - MetEd Supplemental Projects p. 5 |
Germantown Substation Customer Connection ME-2026-007 |
Germantown Substation Taneytown No.1 Substation |
Status Conceptual Cost $130,000 In service 01/31/2029 Load 25 MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 03 - Penelec Supplemental Projects p. 3 |
East Towanda - North Meshoppen ETL 115 kV Line - Customer Connection PN-2025-008 |
East Towanda North Meshoppen |
Status Conceptual Cost $16.00 M In service 07/20/2029 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 03 - Penelec Supplemental Projects p. 5 |
Glory - Nanty Glo - Spangler 46 kV Line - Replace Line Switches PN-2026-007 |
Nicktown | Status Conceptual Cost $760,000 In service 10/05/2027 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 03 - Penelec Supplemental Projects p. 8 |
Valley REC Miller - Warrior Ridge 46 kV H Line Rebuild PN-2026-010 |
Warrior Ridge | Status Conceptual Cost $14.82 M In service 12/19/2028 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 3 |
Natalie Temporary 69kV PPL-2026-0048 |
None named | In service 6/2028 Load 120MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 4 |
Frackville Temporary 69kV PPL-2026-0049 |
None named | In service 12/1/2027 Load 50MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 6 |
AVP3 Tap PPL-2026-0014 |
Jackson Pocono |
Status Conceptual Cost $4.6 M In service 03/31/2031 Load 15 MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 8 |
Downy Flake Taps PPL-2026-0035 |
None named | Status Conceptual Cost $3.1 M In service 03/01/2028 Load 75MW |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 10 |
Arrowhead Tap PPL-2026-0039 |
Acahela Arrowhead Jackson |
Status Conceptual Cost $7.6 M In service 11/30/2030 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 12 |
Lansford Tap PPL-2026-0042 |
Frackville Lansford Siegfried |
Status Conceptual Cost $1.9 M In service 12/01/2029 |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 04 - PPL Supplemental Projects p. 14 |
Jack Frost Tap PPL-2026-0043 |
Acahela East Palmerton Jack Frost |
Status Conceptual Cost $2.8 M In service 11/30/2029 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 2 |
Rutherford, PA PPL-2025-0001 |
Copperstone Harrisburg Rutherford |
Status Conceptual Cost $0.5 M In service 05/30/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 4 |
Frackville, PA PPL-2019-0004 |
Frackville Greenwood Hauto Orwigsburg |
Status Conceptual Cost $45 M In service 06/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 6 |
Mount Carmel, PA PPL-2025-0011 |
Blaschak New Cleveland Eldred |
Status Conceptual Cost $0.9 M In service 12/10/2026 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 8 |
Girardville, PA PPL-2025-0016 |
Frackville Siegfried |
Status Conceptual Cost $0.7 M In service 02/28/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 10 |
Muncy, PA PPL-2019-0006 |
Clinton Lycoming Muncy |
Status Conceptual Cost $30 M In service 12/31/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 12 |
Harwood, PA PPL-2024-0003 |
Harwood Nescopeck New Sunbury Susquehanna Tomhicken New |
Status Conceptual Cost $195.55 M In service 06/01/2027 Load 1,980 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 14 |
Callender Gap, PA PPL-2025-0005 |
Callender Gap New Lackawanna Paupack |
Status Conceptual Cost $73.5 M In service 05/30/2028 Load 500 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 16 |
Orefield, PA PPL-2025-0006 |
Allentown Orefield New Siegfried Susquehanna Wescosville |
Status Conceptual Cost $194 M In service 05/31/2028 Load 1000 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 18 |
Highspire, PA PPL-2025-0007 |
Highspire New Hummelstown Steelton |
Status Conceptual Cost $89 M In service 05/30/2028 Load 450 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 20 |
Black Creek, PA PPL-2025-0009 |
Tomhicken | Status Conceptual Cost $13.5 M In service 05/30/2027 Load 500 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 22 |
Lackawana, PA PPL-2025-0013 |
Callender Gap Lackawanna Sturges New Sturgis Summit |
Status Conceptual Cost $74.9 M In service 07/30/2028 Load 1,400 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 24 |
Gordon, PA PPL-2025-0008 |
Eldred Frackville Gordon New Sunbury |
Status Conceptual Cost $231.65 M In service 05/30/2028 Load 600MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 26 |
Big Bass, PA PPL-2025-0012 |
Acahela Big Bass New Callender Gap Jenkins Lackawanna Palooka Paupack Pocono |
Status Conceptual Cost $186.875 M In service 05/30/2028 Load 1,500 MW |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 28 |
Watson, PA PPL-2026-0005 |
Clinton Milton Watson |
Status Conceptual Cost $0.5 M In service 04/01/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 30 |
Coopersburg, PA PPL-2025-0022 |
Center Valley New Coopersburg |
Status Conceptual Cost $1.85 M In service 11/30/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 32 |
Mausdale, PA PPL-2025-0030 |
Columbia Mausdale New Sunbury |
Status Engineering Cost $3.6 M In service 03/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 34 |
Hughesville, PA PPL-2025-0021 |
Clinton Hughesville Muncy |
Status Conceptual In service 01/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 36 |
Derry, PA PPL-2025-0020 |
Derry Township Milton Muncy Washingtonville New |
Status Conceptual Cost $1.25 M In service 05/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 38 |
Fountain Springs, PA PPL-2025-0028 |
Fountain Springs Fountain springs Creek Frackville Mowry |
Status Conceptual Cost $1.6 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 40 |
Parrish, PA PPL-2025-0029 |
Hanover Harwood Palooka Parrish |
Status Conceptual Cost $0.3 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 42 |
West Damascus, PA PPL-2025-0025 |
West Damascus | Status Engineering Cost $0.5 M In service 05/26/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 44 |
Bear Creek, PA PPL-2025-0027 |
Bear Creek Jenkins Palooka |
Status Conceptual Cost $8 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 46 |
White Haven, PA PPL-2025-0026 |
East Hazleton Harwood White Haven |
Status Engineering Cost $0.3 M In service 12/01/2026 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 48 |
Fairfield, PA PPL-2026-0008 |
Fairfield Lycoming Muncy |
Status Conceptual Cost $0.2 M In service 10/08/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 50 |
West Berwick, PA PPL-2026-0007 |
Columbia Glen Brook West Berwick |
Status Conceptual Cost $0.1 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 60 |
Hummelstown 230-69kV Transformer 1 Replacement PPL-2026-0022 |
Hummelstown | Status Conceptual Cost $7.1 M In service 12/31/2029 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 62 |
Jenkins 230-69kV Transformer 4 Replacement PPL-2026-0023 |
Jenkins | Status Conceptual Cost $7.1 M In service 05/31/2029 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 64 |
Dupont Substation Tap PPL-2026-0019 |
Dupont Jenkins Scranton |
Status Conceptual Cost $0.9 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 66 |
Steel City 500kV Switchyard PPL-2026-0028 |
Steel City | Status Conceptual Cost $3 M In service 11/30/2029 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 70 |
Hosensack 69kV Upgrade PPL-2026-0025 |
Hosensack | Status Conceptual Cost $3.4 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 72 |
Port Carbon Tap PPL-2026-0026 |
Frackville Orwigsburg Port Carbon |
Status Conceptual Cost $7.2 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 74 |
Hosensack-Quarry 2 upgrade PPL-2026-0033 |
Hosensack Quarry South Allentown |
Status Conceptual Cost $3.6 M In service 01/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 76 |
Quarry-Sands 1&2 69kV upgrade PPL-2026-0034 |
Quarry Sands |
Status Conceptual Cost $1.3 M In service 11/30/2029 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 80 |
PPL-2026-0006 | Lock Haven Lycoming Woolrich |
Status Conceptual Cost $2.1 M In service 11/30/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 82 |
PPL-2026-0011 | Flemington Lock Haven Renovo |
Status Conceptual Cost $59.9 M In service 11/30/2030 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 84 |
PPL-2026-0020 | Avoca Stanton Sullivan Trail |
Status Conceptual Cost $1 M In service 02/01/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 86 |
PPL-2026-0024 | Bingen | Status Conceptual Cost $0.6 M In service 11/30/2027 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 88 |
Cumberland - West Shore 1 & 2 69kV line upgrades PPL-2026-0009 |
Cumberland Wertzville West Shore |
Status Conceptual Cost $20.3 M In service 06/30/2029 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 90 |
Berks - South Akron 2 69kV upgrade PPL-2026-0010 |
Berks South Akron |
Status Conceptual Cost $38.3 M In service 12/31/2028 |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 92 |
Tinker Tap Strengthening PPL-2026-0017 |
Brookside Elk Mountain Greenfield Lackawanna Tinker |
Status Conceptual Cost $34.6 M In service 11/30/2029 |
| 2026-09-17 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency DOM-2025-0048 |
Dryburg Guill Town New |
No figures printed |
| 2026-09-17 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0092 |
Strasburg substation Toms Brook Substation New |
In service 12/31/2028 Load 22.4MW |
| 2026-09-17 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2026-0035 |
Kings Fork Myrtle Substation |
In service 01/28/2028 |
| 2026-09-17 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 7 |
Boykins – 115kV Delivery – Add TX#2 - DEV DOM-2026-0007 |
Boykins Substation | Status Engineering Cost $1.22M In service 12/31/2027 Load 8.9MW |
| 2026-09-17 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 9 |
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk DOM-2026-0017 |
Chancellor Chase City Lancaster Virginia Beach Watkins Corner |
Status Planning (Conceptual) In service Provided in table |
| 2026-09-17 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 11 |
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance and Risk DOM-2026-0032 |
Altavista | Status Construction (Under construction) Cost $4.27M In service 10/06/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic ACE local plan submission for 2024 RTEP p. 2 |
Quinton New Customer Line ACE-2022-002 · s3154.1 |
Quinton | Status Engineering Cost $4.6M In service 04/30/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic ACE local plan submission for 2024 RTEP p. 4 |
ACE-2022-009 | Beckett Nortonville Paulsboro Woolwich New |
Status Engineering Cost $18M In service 1/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic ACE local plan submission for 2024 RTEP p. 6 |
0725 & 0726 Churchtown - Woodstown 69kV Lines Rebuild ACE-2024-001 · s3278.1 |
Churchtown Woodstown |
Status Conceptual Cost $31 M In service 12/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic ACE local plan submission for 2024 RTEP p. 8 |
Mickleton 230/69 kV T1 Replacement ACE-2023-001 · s3180.1 |
Mickleton | Status Engineering Cost $5.9 M In service 05/31/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic ACE local plan submission for 2024 RTEP p. 10 |
New Transformer at Lamb Substation ACE-2023-002 · s3181.1 |
Lamb | Status Conceptual Cost $2.5 M In service 6/30/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic ACE local plan submission for 2025 RTEP p. 2 |
Pine Hill Substation ACE-2024-003 · s3664.1 |
Pine Hill Sickler Stratford |
Status Conceptual Cost $35.53 M In service 9/1/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 2 |
BGE-2023-010 | Pumphrey | Status In-service (In service) Cost $0.7M In service 4/5/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 4 |
BGE-2023-011 | Pumphrey | Status Engineering Cost $0.7M In service 5/10/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 6 |
BGE-2023-012 | Pumphrey | Status Engineering Cost $0.7M In service 6/13/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 8 |
BGE-2023-013 | Pumphrey | Status Engineering Cost $0.7M In service 11/28/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 10 |
BGE-2023-014 | Pumphrey | Status Engineering Cost $0.7M In service 10/18/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 12 |
BGE-2023-015 | Waugh Chapel | Status Engineering Cost $0.7M In service 10/17/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 14 |
BGE-2023-016 | Waugh Chapel | Status Engineering Cost $0.7M In service 6/6/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 16 |
BGE-2023-017 | Windy Edge | Status Engineering Cost $0.7M In service 11/4/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 18 |
BGE-2023-018 | Windy Edge | Status Engineering Cost $0.7M In service 10/10/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2024 RTEP p. 20 |
BGE-2023-019 | Riverside | Status Engineering Cost $84.3M In service 12/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 2 |
Waugh Chapel Circuit Breaker B4 BGE-2024-002 · s3560.1 |
Waugh Chapel | Status Construction (Under construction) Cost $0.7M In service 4/10/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 4 |
Waugh Chapel Circuit Breaker B7 BGE-2024-003 · s3561.1 |
Waugh Chapel | Status Engineering Cost $0.7M In service 10/9/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 6 |
Waugh Chapel Circuit Breaker B10 BGE-2024-004 · s3562.1 |
Waugh Chapel | Status Engineering Cost $0.7M In service 5/15/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 8 |
Waugh Chapel Circuit Breaker B12 BGE-2024-005 · s3563.1 |
Waugh Chapel | Status Engineering Cost $0.7M In service 11/13/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 10 |
Windy Edge Circuit Breaker B3 BGE-2024-006 · s3564.1 |
Windy Edge | Status In-service (In service) Cost $0.7M In service 4/3/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 12 |
Windy Edge Circuit Breaker B4 BGE-2024-007 · s3565.1 |
Windy Edge | Status Engineering Cost $0.7M In service 5/8/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 14 |
Windy Edge Circuit Breaker B24 BGE-2024-008 · s3566.1 |
Windy Edge | Status Engineering Cost $0.7M In service 12/11/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 16 |
Windy Edge Circuit Breaker B28 BGE-2024-009 · s3567.1 |
Windy Edge | Status Engineering Cost $0.7M In service 10/2/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic BGE local plan submission for 2025 RTEP p. 18 |
Granite Circuit Breaker B2 BGE-2024-010 · s3568.1 |
Granite | Status Engineering Cost $0.7M In service 5/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 3 |
Gillette – Green Village 34.5 kV Lines JCPL-2019-026 · s3232.1 |
Gillette Green Village |
Cost $ 24.2 M In service 02/23/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 6 |
New Customer Connection JCPL-2023-007 · s3233.1 |
Werner Substation | Cost $1.5M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-008 · s3234.1 |
Monroe | Cost $1.89 In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-009 · s3235.1 |
Freneau Hazlet |
Cost $3.78 In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-013 · s3236.1 |
Manitou | Cost $1.92 In service 10/15/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-014 · s3237.1 |
Bernardsville Lyons |
No figures printed |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-016 · s3238.1 |
Allenhurst Substation Oceanview |
Cost $1.28 In service 11/16/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-017 · s3239.1 |
Air Reduction Murray Hill |
Cost $0.64 In service 12/15/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 13 |
Automatic Restoration Projects JCPL-2023-018 · s3240.1 |
Rocktown Road | In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 14 |
Automatic Restoration Projects JCPL-2023-019 · s3241.1 |
New Providence | Cost $0.64 In service 12/10/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 14 |
Automatic Restoration Projects JCPL-2023-020 · s3242.1 |
West Wharton | Cost $1.92 In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 14 |
Automatic Restoration Projects JCPL-2023-021 · s3243.1 |
Brielle Point Pleasant |
Cost $1.92 In service 5/15/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 14 |
Automatic Restoration Projects JCPL-2023-024 · s3244.1 |
Englishtown | Cost $2.56 In service 10/15/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 14 |
Automatic Restoration Projects JCPL-2023-026 · s3245.1 |
Lakehurst South Lakewood |
Cost $2.56 In service 12/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 14 |
Automatic Restoration Projects JCPL-2023-028 · s3246.1 |
Riverdale | Cost $1.28 In service 12/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 15 |
Automatic Restoration Projects JCPL-2023-029 · s3247.1 |
Traynor | Cost $1.92 In service 12/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 15 |
Automatic Restoration Projects JCPL-2023-030 · s3248.1 |
Hyson Larrabee |
Cost $2.56 In service 12/20/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 15 |
Automatic Restoration Projects JCPL-2023-040 · s3250.1 |
Little Silver Red Bank |
Cost $1.28 In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 15 |
Automatic Restoration Projects JCPL-2023-041 · s3251.1 |
Manitou Whitings |
Cost $1.28 In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 16 |
Vernon Substation JCPL-2023-038 · s3249.1 |
Vernon | Cost $4.7 M In service 12/15/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 18 |
Franklin Substation JCPL-2023-006, JCPL-2023-042 |
Franklin Vernon West Wharton |
Cost $32.0 M In service 12/31/2025 Load 67 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 23 |
Traynor – Whippany 230 kV Misoperation Relays JCPL-2023-044 · s3253.1 |
Traynor Whippany |
Cost $3.25M In service 11/15/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 24 |
Greystone – Whippany 230 kV Misoperation Relays JCPL-2023-045 · s3254.1 |
Greystone Whippany |
Cost $2.75M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 25 |
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays JCPL-2023-048 · s3255.1 |
Freneau Parlin Williams Gas |
Cost $4.1M In service 05/30/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 26 |
Gilbert Substation JCPL-2023-043 · s3256.1 |
Gilbert Morris Park |
Cost $2.4M In service 05/30/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 28 |
Gilbert and Glen Gardner Substations JCPL-2023-047 · s3257.1 |
Gilbert Glen Gardner |
Cost $5.2M In service 04/04/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 30 |
Montville Substation JCPL-2023-050 · s3258.1 |
Montville | Cost $8.55M In service 04/01/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 32 |
New Customer Connection JCPL-2023-058 · s3259.1 |
Cheesequake Freneau Raritan River Substation |
Cost $1.3M In service 06/01/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 34 |
Raritan River Substation JCPL-2023-060 · s3260.1 |
Raritan River Substation | Cost $5.4M In service 06/30/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 36 |
Middlesex 230 kV Switching Station JCPL-2023-062 · s3261.1 |
Bridgewater Gillette Lake Nelson Middlesex |
Cost $8.85M In service 6/1/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 38 |
East Windsor Substation JCPL-2023-064 · s3262.1 |
Deans East Windsor New Freedom |
Cost $2.00M In service 12/2025 (East Windsor – Deans 5022 500 kV Line) 6/2027 (East Windsor – New Freedom 5038 500 kV Line) |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 41 |
Misoperation Relay Project JCPL-2023-046 · s3272.1 |
Roseland Whippany |
Cost $2.33M In service 5/30/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 44 |
Kittatinny Substation JCPL-2023-049 · s3273.1 |
Kittatinny Portland |
Cost $7.0M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 46 |
East Flemington Substation JCPL-2023-051 · s3274.1 |
East Flemington | Cost $7.18M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 48 |
East Flemington Substation JCPL-2023-052 · s3275.1 |
East Flemington | Cost $7.18M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 50 |
Raritan River – Werner (D30) 115 kV Customer Connection JCPL-2023-004 · s3280.1 |
Raritan River Substation Werner Substation |
Cost $5.8M In service 10/15/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 52 |
EH Werner Substation JCPL-2023-037 · s3281.1 |
EH Werner | Cost $6.4M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 54 |
Pequest River Substation JCPL-2023-055 · s3283.1 |
Pequest River | Cost $4.23M In service 5/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 56 |
Vermont Ave 34.5 kV Customer Connection JCPL-2023-059 · s3284.1 |
Larrabee Leisure Village South Lakewood Vermont Ave |
Cost $0.3M In service 03/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 58 |
Cookstown – Larrabee – Whitings 230 kV Line JCPL-2022-005 |
Cookstown Larrabee Manchester Whitings |
Cost $50.4M In service 12/1/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 61 |
Flanders Substation JCPL-2023-039 · s3325.1 |
Flanders | Cost $5.1 M In service 5/30/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 63 |
Flanders Substation JCPL-2023-057 · s3326.1 |
Flanders | Cost 4.9 M In service 5/29/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 65 |
Misoperation Relay Project JCPL-2024-007 · s3327.1 |
Gilbert Morris Park |
Cost $ 3.27M In service 12/17/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 68 |
Misoperation Relay Projects JCPL-2024-010 · s3328.1 |
Flanders Stony Brook Vernon West Wharton |
Cost $13.82 M In service 04/04/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 71 |
Smithburg Substation JCPL-2024-005 · s3329.1 |
East Windsor Larrabee Manalapan Smithburg |
Cost $30.1 M In service 06/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 74 |
Customer Connection JCPL-2024-016 · s3336.1 |
Halsey Montville Whippany |
Cost $1.45M In service 06/30/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 76 |
Windsor Substation JCPL-2023-005 · s3394.1 |
Windsor | Cost $6.3M In service 11/2/2023 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 78 |
Eaton Crest – Woodbine (R226) 34.5 kV Customer Connection JCPL-2023-003 · s3397.1 |
Eaton Crest Fort Monmouth Woodbine |
Cost $1.4M In service 4/1/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-012 · s3398.1 |
Long Branch Substation | Cost $ 0.64 M In service 12/5/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-015 · s3399.1 |
Taylor Lane Substation | Cost $ 0.64 M In service 11/16/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-022 · s3400.1 |
Bradley Beach | Cost $ 0.64 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-023 · s3401.1 |
East Flemington | Cost $ 0.64 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-025 · s3402.1 |
Farmingdale Larrabee |
No figures printed |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-027 · s3403.1 |
Cookstown McGuire |
Cost $ 0.64 M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 83 |
Automatic Restoration Projects JCPL-2023-031 · s3404.1 |
Smithburg | Cost $ 0.64 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 84 |
Automatic Restoration Projects JCPL-2023-032 · s3405.1 |
Lebanon | Cost $ 1.28 M In service 5/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 84 |
Automatic Restoration Projects JCPL-2023-033 · s3406.1 |
Washington | Cost $ 1.28 M In service 6/1/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 84 |
Automatic Restoration Projects JCPL-2023-034 · s3407.1 |
Oceanview Whitesville |
Cost $ 1.92 M In service 6/1/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 87 |
Atlantic – Red Bank S1033 230 kV Misoperation Relays JCPL-2019-008 · s3411.1 |
Atlantic Red Bank |
Cost $ 2.0 M In service 04/17/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 88 |
Atlantic – Red Bank T2020 230 kV Misoperation Relays JCPL-2019-009 · s3412.1 |
Atlantic Eaton Crest Red Bank |
Cost $ 2.0 M In service 11/20/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 89 |
Chester-West Wharton 230 kV Misoperation Relays JCPL-2019-021 · s3413.1 |
Chester Substation West Wharton |
Cost $ 2.0 M In service 10/11/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 92 |
Cookstown Substation JCPL-2023-010 · s3414.1 |
Cookstown | Cost $ 7.95 M In service 1/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 94 |
Kittatinny-Yards Creek 230 kV Misoperation Relays JCPL-2023-035 · s3415.1 |
Kittatinny Yards Creek |
Cost $ 1.3 M In service 12/03/2022 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 97 |
West Wharton – Sugarloaf 115 kV Lines JCPL-2023-002 · s3421.1 |
Sugarloaf Vernon West Wharton |
Cost $0.05M In service 7/25/2023 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 99 |
Kittatinny No. 4 230-34.5 kV Transformer JCPL-2024-014 · s3432.1 |
Kittatinny | Cost $5M In service 5/1/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 101 |
Lakewood Gen No. 6 230-34.5 kV Transformer JCPL-2024-015 · s3433.1 |
Lakewood Gen | Cost $6M In service 05/24/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 103 |
Branchville – Franklin 34.5 kV Q745 Line Customer Connection JCPL-2022-004 · s3437.1 |
Branchville Franklin |
Cost $0.8M In service 06/02/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 105 |
Washington 34.5 kV Circuit Breakers JCPL-2024-030 · s3438.1 |
Broadway Halecrest Washington |
Cost $5.4M In service 08/27/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 109 |
Costco – Monroe 34.5 kV JCPL-2022-001 · s2840 |
Costco Jamesburg Monroe Noble House |
Cost $1.3M In service 11/17/2022 Load 13.9 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 111 |
Motts Corner – Seaside Park 34.5 kV JCPL-2022-003 · s2841 |
Manitou Motts Corner Seaside Park |
Cost $14.26 In service 10/31/2023 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 2 |
JCPL Transmission Zone M-3 Process Whippany, NJ/Montville, NJ/Greystone, NJ JCPL-2019-024 · s3609.1 |
Alderney Davis Greystone Montville Morris Plains Morris Plains Tap Morristown Morristown Tap Tabor Tap Whippany |
Cost $20.1 M In service 06/11/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 4 |
JCPL Transmission Zone M-3 Process Morris Park Substation JCPL-2023-011 · s3611.1 |
Gilbert Martins Creek Morris Park Pequest River |
Cost $15.4M In service 1/29/2027 Load 13 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 6 |
JCPL Transmission Zone M-3 Process Chester No. 1 230-34.5 kV Transformer JCPL-2024-003 · s3610.1 |
Chester Substation Kittatinny Pohatcong West Wharton |
Cost $7.3 M In service 11/12/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 8 |
JCPL Transmission Zone M-3 Process Whippany No. 12 230/115 kV Transformer JCPL-2024-019 · s3613.1 |
Whippany | Cost $8.1 M In service 03/07/2030 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 10 |
JCPL Transmission Zone M-3 Process Windsor No. 3 230-34.5 kV Transformer JCPL-2024-020 · s3615.1 |
Windsor | Cost $9.7M In service 12/22/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 12 |
JCPL Transmission Zone M-3 Process Chester No. 4 230-34.5 kV Transformer JCPL-2024-021 · s3617.1 |
Chester Substation | Cost $7.3 M In service 12/31/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 14 |
JCPL Transmission Zone M-3 Process Larrabee No. 3 230-34.5 kV Transformer JCPL-2024-023 · s3619.1 |
Larrabee | Cost $7.3 M In service 04/12/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 16 |
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer JCPL-2024-025 · s3612.1 |
Franklin Vernon West Wharton |
Cost $7M In service 8/31/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 18 |
JCPL Transmission Zone M-3 Process Deep Run No. 2 115-34.5 kV Transformer JCPL-2024-026 · s3614.1 |
Deep Run Substation Englishtown Raritan River Substation |
Cost $8M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 20 |
JCPL Transmission Zone M-3 Process Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers JCPL-2024-027 · s3616.1 |
Gilbert Glendon Morris Park |
Cost $8M In service 12/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 22 |
JCPL Transmission Zone M-3 Process Englishtown No. 1 115-34.5 kV Transformer JCPL-2024-028 · s3618.1 |
Deep Run Substation Englishtown Wyckoff St |
Cost $7M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 24 |
JCPL Transmission Zone M-3 Process Raritan River (Sayreville), NJ JCPL-2024-029 · s3639.1 |
Raritan River Substation | Cost $6.91 M In service 03/30/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 26 |
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection JCPL-2024-034 · s3621.1 |
Coke McGraw Hill Windsor Wyckoff Street |
Cost $54M In service 7/24/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 28 |
JCPL Transmission Zone M-3 Process Franklin No. 1 115-34.5 kV Transformer JCPL-2024-036 · s3636.1 |
Franklin | Cost $6M In service 12/28/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 30 |
JCPL Transmission Zone M-3 Process Pequest River No. 1 115-34.5 kV Transformer JCPL-2024-037 · s3638.1 |
Pequest River | Cost $6.9 M In service 01/30/2030 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 32 |
JCPL Transmission Zone M-3 Process Glen Gardner No. 2 230-34.5 kV Transformer JCPL-2024-043 · s3620.1 |
Glen Gardner | Cost $7.5 M In service 05/01/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 34 |
JCPL Transmission Zone M-3 Process Montville, NJ JCPL-2024-052 · s3637.1 |
Jacksonville Tap Montville Riverdale |
Cost $0.15 M In service 07/05/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 2 |
Middletown Junction-Smith Street #1 115 kV New Customer ME-2023-005 · s3017 |
Middletown Junction Smith Street |
Cost $4.9M In service 7/3/2024 Load 12 MVA |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 4 |
Hokes Ring Bus ME-2023-003 · s3263.1 |
Hokes Jackson Lehigh Portland Cement Smith Street Violet Hill |
Cost $24.1M In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 6 |
North Lebanon – Fredericksburg 69 kV Line ME-2023-007 · s3264.1 |
Fredericksburg Substation Grantville North Hershey North Lebanon |
Cost $13.6 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 8 |
Northkill – Rehrersburg 69 kV Line ME-2023-008 · s3300.1, s3300.2, s3300.3 |
Bernville Frystown Northkill Substation Rehrersburg South Lebanon |
Cost $24.13M In service 12/01/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 10 |
Campbelltown 69 kV Ring Bus ME-2019-034 · s3287.1 |
Campbelltown Substation Campbelltown Tap Middletown Substation North Lebanon Swatara |
Cost $10.0M In service 6/1/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 13 |
Carpenter Technology – South Reading 69 kV Line ME-2019-043 · s3288.1 |
Carpenter Technology Substation Glenside Substation South Reading Substation |
Cost $15.2M In service 05/29/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 15 |
Birdsboro – Birdsboro Extrusions 69 kV Line ME-2023-011 · s3289.1 |
Birdsboro Extrusions
Substation Birdsboro Substation South Reading Substation |
Cost $2.1M In service 12/10/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 17 |
Violet Hill No. 6 115-69 kV Transformer ME-2024-003 · s3330.1 |
Violet Hill | Cost $6.1M In service 5/1/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 19 |
South Reading Substation ME-2023-021 · s3331.1 |
Berks Boonetown Lauschtown South Reading Substation |
Cost $9.85M In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 21 |
South Reading 230-69 kV Transformer #7 ME-2023-023 · s3332.1 |
South Reading Substation | Cost $6.10 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 23 |
South Reading 230-69 kV Transformer #8 ME-2023-024 · s3333.1 |
South Reading Substation | Cost $8.80M In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 25 |
Smith Street 115/69 kV Transformer #1 ME-2024-001 · s3337.1 |
Hokes Smith Street |
Cost $6.6M In service 6/1/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 27 |
Baldy 69 kV ME-2023-010 · s3338.1 |
Baldy 69 kV Substation East Topton Lyons |
Cost $1.1M In service 12/30/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 29 |
Hamilton 115 kV Ring Bus ME-2019-033 · s3339.1 |
Hamilton 115 kV Substation Jackson |
Cost $7.70M In service 06/01/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 31 |
Yorkana 230 kV Substation ME-2022-005 · s3340.1 |
Brunner Island Jackson Otter Creek Yorkana 230 kV substation |
Cost $3.70 M In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 33 |
North Temple – Allentown Cement 69 kV Line Customer Connection ME-2024-010 · s3434.1 |
Allentown Cement North Temple |
Cost $0.70M In service 6/1/2025 Load 13 MVA |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 35 |
Hunterstown – North Hanover 115 kV Line Customer Connection ME-2024-011 · s3435.1 |
Hunterstown North Hanover |
Cost $1.70M In service 1/11/2027 Load 22 MVA |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 2 |
Middletown Junction – Swatara Hill – Campbelltown 69 kV Line ME-2019-009 · s3622.1 |
Campbelltown Substation Middletown Junction Swatara Hill |
Cost $25.4 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 4 |
New Customer Connection ME-2019-053 · s3623.1 |
Middletown Junction Raintree Smith Street Willis Road |
Cost $12.5M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 6 |
Cleona Substation ME-2023-013 · s3625.1 |
Cleona North Lebanon West Lebanon |
Cost $9.5M In service 6/8/2026 Load 11 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 8 |
Mountain Substation ME-2023-017 · s3605.1, s3605.2 |
Gardners Mountain PPGI |
Cost $11.4M In service 12/31/2026 Load 31.8 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 10 |
North Hershey Substation ME-2023-022 · s3624.1 |
North Hershey | Cost $16.31M In service 12/17/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 12 |
Belfast Substation ME-2024-014 · s3626.1 |
Belfast Glendon North Bangor Northwood |
Cost $14.3M In service 6/1/2028 Load 78 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2025 RTEP p. 14 |
Alcoa – Broad Street 69 kV Line Customer Connection ME-2024-018 · s3627.1 |
Alcoa Broad St. North Cornwall |
Cost $1.19 M In service 11/24/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic ODEC local plan submission for 2024 RTEP p. 2 |
ODEC Transmission Zone: Supplemental 6750 Kellam-Cheriton 69kV Rebuild ODEC-2023-01 · s3187.1 |
Bayview Cheriton Cheriton/Bayview Kellam Tasley |
Status Pre-Engineering (Engineering) Cost $17 M In service 12/30/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic ODEC local plan submission for 2024 RTEP p. 4 |
M-3 ODEC Transmission Zone 6745/46 69kV Chincoteague Cable ODEC-2023-02 · s3188.1 |
Chincoteague station Wattsville Substation |
Status Pre-Engineering (Engineering) Cost $6 M In service 12/30/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2024 RTEP p. 2 |
220-47 Plymouth Meeting – Flint 230 kV Line Rebuild PE-2023-009 · s3185.1 |
Flint Plymouth Meeting |
Status Engineering Cost $18.2M In service 12/31/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2024 RTEP p. 4 |
220-69 Plymouth Meeting – Upper Merion 230 kV Line Rebuild PE-2023-010 · s3186.1 |
Plymouth Meeting Upper Merion |
Status Engineering Cost $29.2M In service 12/31/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2024 RTEP p. 6 |
Warrington 230 kV Bus Tie 7-8 Facility Upgrade PE-2023-011 · s3183.1 |
Warrington | Status Engineering Cost $20k In service 3/8/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2024 RTEP p. 8 |
Tacony Substation Rebuild PE-2024-001 · s3383.1 & s3383.2 |
Tacony | Status Engineering Cost $17M In service 12/31/27 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2024 RTEP p. 10 |
220-31 Planebrook – Bradford 230 kV Line Rebuild PE-2024-002 · s3384.1 |
Bradford Planebrook |
Status Conceptual Cost $36M In service 12/31/27 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2024 RTEP p. 12 |
220-02 Planebrook – Bradford 230 kV Line Rebuild PE-2024-003 · s3385.1 |
Bradford Planebrook |
Status Conceptual Cost $36M In service 12/31/28 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2025 RTEP p. 2 |
Byberry 6th 138/13 kV Transformer PE-2024-004 · s3661.1 |
Byberry | Status Conceptual Cost $0.85 M In service 6/1/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2025 RTEP p. 4 |
Byberry #150 138kV Circuit Breaker Replacement PE-2024-005 · s3662.1 |
Byberry | Status Conceptual Cost $0.55 M In service 6/1/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2025 RTEP p. 6 |
Neshaminy 138kV Station Reconfiguration PE-2024-006 · s3663.1 |
Neshaminy | Status Conceptual Cost $4.2 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PECO local plan submission for 2025 RTEP p. 8 |
Peach Bottom Unit #2 Relay Replacement PE-2024-007 · s3665.1 |
Peach Bottom | Status Complete Cost $836,000 In service 11/3/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 3 |
Westfall Substation PN-2023-013 · s3268.1 |
Thirty First St Thirty-First Street Westfall |
Cost $6.7 M In service 6/1/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 5 |
Yeagertown No. 1 230-46 kV Transformer PN-2023-019 · s3269.1 |
Yeagertown Substation | Cost $3.50M In service 10/17/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 7 |
Yeagertown No. 2 230-46 kV Transformer PN-2023-020 · s3270.1 |
Yeagertown Substation | Cost $4.00M In service 05/16/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 9 |
Altoona — Hollidaysburg 46 kV ALH Line PN-2023-034 · s3271.1 |
Altoona Hollidaysburg |
Cost $1.5M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 11 |
Niles Valley 115 kV Ring Bus PN-2023-005 · s3290.1 |
Hector Mansfield Niles Valley Osceola Sabinsville Wellsboro |
Cost $16.0M In service 11/04/2028 Load 30 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 14 |
Warren – Falconer 115 kV Line: New Customer PN-2023-007 · s3291.1 |
Falconer Warren |
Cost $1.5M In service 04/28/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 16 |
East Sayre – East Towanda 115 kV Line: New Customer PN-2023-012 · s3292.1 |
East Sayre East Towanda |
Cost $1.67M In service 09/30/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 18 |
Carlisle Pike – Roxbury 115 kV Line: New Customer PN-2023-017 · s3293.1 |
Carlisle Pike Roxbury |
Cost $8.0M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 20 |
Shawville Bank 1A Transformer PN-2023-030 · s3334.1 |
Shawville | Cost $8.8M In service 06/05/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 22 |
Homer City South 345-230 kV Transformer PN-2024-007 · s3335.1 |
Homer City | Cost $8.8M In service 06/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 24 |
Blairsville East – Seward 115 kV New Customer PN-2023-003 · s3395.1 |
Blairsville East Seward |
Cost $3.5M In service 03/14/2025 Load 22 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 26 |
Johnstown 230 kV Substation PN-2023-004 · s3396.1 |
Fiddler’s Green Homer City Johnstown |
Cost $1.12M In service 12/30/2023 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 28 |
Portage 46 kV Substation PN-2023-010 · s3408.1 |
Portage Substation Wilmore Dam |
Cost $3.7M In service 03/28/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 32 |
Tiffany – Thompson 115 kV Misoperation Relays PN-2023-014 · s3409.1 |
Thompson Tiffany |
Cost $ 0.47M In service 11/07/2022 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 33 |
Dubois – Whetstone 115 kV Misoperation Relays PN-2023-015 · s3410.1 |
Dubois Harvey Run Whetstone |
Cost $2.1M In service 11/29/2023 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 36 |
Erie South Substation PN-2020-005 and PN-2023-018 |
Erie South Erie West Four Mile Junction French Road No. 2 Warren |
In service 6/3/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 39 |
Geneva – Morgan Street 115 kV Line Customer Connection PN-2024-020 · s3436.1 |
Geneva Morgan Street |
Cost $1.6M In service 5/31/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 41 |
Niles Valley – Wellsboro 115 kV PN-2022-002 · s2835 |
Mansfield Niles Valley Wellsboro |
Cost $1.0 M In service 6/1/2024 Load 23 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 43 |
Belleville (Warrior Ridge) 46 kV Line PN-2022-003 |
Belleville Belleville New Holland MacLane MacLane Tap |
Cost $13.4M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 2 |
Piney Substation PN-2020-004, APS-2020-003 · s3628.1 |
Burma Eclipse Substation Grandview Substation Haynie Piney Substation |
Cost $11.4M In service 01/12/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 6 |
Perry – Ashtabula – Erie West 345 kV Line PN-2023-029 · s3702.1 |
Ashtabula Erie West Perry |
Cost $52.4 M In service 5/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 9 |
SGC Tap - Summit 46 kV Line PN-2024-002 · s3629.1 |
Ashville Summit |
Cost $3.54 M In service 05/29/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 11 |
Altoona - Hollidaysburg 46 AH kV Line PN-2024-005 · s3634.1 |
Altoona Hollidaysburg |
Cost $2.21 M In service 12/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 13 |
Tyrone North – Tipton 46 kV Line PN-2024-006 · s3635.1 |
Tipton Substation Tyrone North Substation |
Cost $2.92 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 15 |
Glade Substation PN-2024-013 · s3631.1 |
Forest Substation Glade Substation Lewis Run Substation Warren |
Cost $12 M In service 12/17/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 17 |
Glory – Nanty Glo – Spangler 46 kV Switches PN-2024-026 · s3633.1 |
Belsano Glory Nanty Glo Spangler Strongstown Twin Rocks |
Cost $1.86 M In service 11/13/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 3 |
Lanham 2A Breaker Replacement PEP-2023-011 · s3208.1 |
Lanham | Status Engineering Cost $675k In service 10/23/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 5 |
Lanham 3A Breaker Replacement PEP-2023-012 · s3209.1 |
Lanham | Status Engineering Cost $675k In service 10/23/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 7 |
Buzzard Point 7TS Breaker Replacement PEP-2023-006 · s3203.1 |
Buzzard Point | Status Engineering Cost $675k In service 12/1/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 9 |
Buzzard Point 13B & 14B Breaker Replacements PEP-2024-001 · s3312.1 |
Buzzard Point | Status Engineering Cost $300k In service 12/31/2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 11 |
Bowie 230kV 1A Breaker Replacement PEP-2023-013 · s3529.1 |
Bowie | Status Engineering Cost $810k In service 12/13/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 13 |
Bowie 230kV 2A Breaker Replacement PEP-2023-014 · s3530.1 |
Bowie | Status Engineering Cost $810k In service 5/3/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 15 |
Bowie 230kV 3A Breaker Replacement PEP-2023-015 · s3531.1 |
Bowie | Status In-service (In service) Cost $810k In service 5/3/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 17 |
Burches Hill 230kV 3A Breaker Replacement PEP-2023-016 · s3532.1 |
Burches Hill | Status In-service (In service) Cost $810k In service 5/3/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 19 |
Burches Hill 230kV 3B Breaker Replacement PEP-2023-017 · s3533.1 |
Burches Hill | Status In-service (In service) Cost $810k In service 5/3/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 21 |
Morgantown 230kV 6B Breaker Replacement PEP-2023-018 · s3534.1 |
Morgantown | Status Engineering Cost $810k In service 5/3/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 23 |
Morgantown 230kV 6C Breaker Replacement PEP-2023-019 · s3535.1 |
Morgantown | Status Engineering Cost $810k In service 5/3/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 25 |
O Street 138kV 1B Breaker Replacement PEP-2023-020 · s3536.1 |
O Street | Status In-service (In service) Cost $675k In service 5/28/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 27 |
O Street 138kV 3B Breaker Replacement PEP-2023-021 · s3537.1 |
O Street | Status In-service (In service) Cost $675k In service 12/31/23 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 29 |
O Street 138kV 4B Breaker Replacement PEP-2023-022 · s3538.1 |
O Street | Status In-service (In service) Cost $675k In service 1/31/24 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2024 RTEP p. 31 |
Bells Mill 138kV 8BT Breaker Replacement PEP-2023-005 · s3539.1 |
Bells Mill | Status Engineering Cost $675k In service 10/01/25 |
| 2026-09-08* | SRRTEP Mid-Atlantic PEPCO local plan submission for 2025 RTEP p. 3 |
Mt. Zion 230kV Breakers PEP-2024-003 · s3572.1, s3572.2, s3572.3, s3572.4 |
Mt. Zion Substation | Status Engineering Cost $22M In service 6/1/2030 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 2 |
PPL-2019-0007 | Lycoming Williamsport |
Status Conceptual Cost $6M In service 12/30/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 4 |
PPL-2023-0005 | East Hazelton Harleigh Harwood Hazelton New McAdoo New |
Status Conceptual Cost $15M In service McAdoo sub (s3082.1) 6/12025, New circuit (s3082.2) 12/1/2027 Load 40-45 MWs |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 6 |
PPL-2023-0007 | Lock Haven Sunbury |
Status Conceptual Cost $103M In service 12/30/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 8 |
PPL-2023-0008 | Buxmont Upper Hanover |
Status Conceptual Cost $18M In service 5/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 10 |
PPL-2023-0009 | Carlisle Cumberland New Kingston W. Carlisle |
Status Conceptual Cost $0.9M In service 11/30/2025 Load 6.5 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 12 |
PPL-2023-0010 | Glen Brook Hunlock |
Status Conceptual Cost $7M In service 12/30/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 14 |
PPL-2023-0011 | Selinsgrove | Status Conceptual Cost $3M In service 12/30/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 16 |
PPL-2023-0012 | Eldred Pine Grove |
Status Conceptual Cost $1.0M In service 11/30/2025 Load 10 MVA |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 18 |
PPL-2023-0014 | Berks Lavino |
Status Conceptual Cost $0.9M In service 11/30/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 22 |
PPL-2023-0013 | East Hazelton Harwood |
Status Conceptual Cost $6M In service 12/1/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 24 |
PPL-2023-0015 | Cass | Status Conceptual Cost $0.9M In service 5/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 26 |
PPL-2024-0002 | Carlisle New Cumberland Stonehouse New |
Status Conceptual Cost $1.4 M In service 06/01/2026 Load 13-18 MWs |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 28 |
PPL-2024-0001 | Bernheisel New Juniata Three Mile Island |
Status Conceptual Cost $244M In service s3311.1, s3311.3, s3311.4, s3311.5, s3311.6. RIS 6/30/2026. s3311.2 RIS 6/1/2027 Load 1,275 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2024 RTEP p. 30 |
PPL-2024-0003 | Glen Brook Harwood Nescopeck New Sunbury Susquehanna Susquehanna T10 Tomhicken New |
Status Conceptual Cost $196.55 M In service 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 Load 1,980 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 2 |
Beavertown, PA PPL-2019-0003 · s3554.1 |
Beavertown Middleburg Sunbury |
Status Conceptual Cost $33 M In service 05/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 4 |
Donnelley, PA PPL-2024-0011 · s3548 |
Dillerville North Lancaster New Prince South Akron West Hempfield |
Status Conceptual Cost $67.5 M In service 06/01/2028 Load 350 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 6 |
Harwood, PA PPL-2024-0012 · s3549 |
Harwood Slykerville New Susquehanna Tresckow |
Status Conceptual Cost $73.3 M In service 05/30/2028 Load 1,000 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 8 |
Alburtis, PA PPL-2024-0013 · s3550 |
Alburtis | Status Conceptual Cost $19.9 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 10 |
Wescosville, PA PPL-2024-0014 · s3551 |
Wescosville | Status Conceptual Cost $15.5 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 12 |
Lackawanna, PA PPL-2024-0015 · s3552 |
Lackawanna | Status Conceptual Cost $6.3 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 14 |
Blooming Groove, PA PPL-2024-0016 · s3553 |
Blooming Grove | Status Conceptual Cost $6.3 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 16 |
Tresckow, PA PPL-2024-0004 · s3555 |
East Palmerton Harwood Siegfried Tresckow New |
Status Conceptual Cost $81 M In service 05/31/2027 Load 1,000 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 18 |
Hamilton, PA PPL-2024-0006 · s3556 |
Breinigsville Tek Park New |
Status Conceptual Cost $9 M In service 06/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 20 |
Summit, PA PPL-2024-0007 · s3557 |
Stanton Summit |
Status Conceptual Cost $17.5 M In service 12/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 22 |
Old Forge, PA PPL-2024-0008 · s3558 |
Avoca Old Forge |
Status Conceptual Cost $5.5 M In service 12/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 24 |
Exeter, PA PPL-2024-0009 · s3559 |
Exeter Stanton Swoyersville |
Status Conceptual Cost $17.5 M In service 12/01/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 26 |
Donnelley Gravure, PA PPL-2024-0010 · s3547 |
Engleside Greenland Lampeter New Millwood Pitney New Prince South Akron Strasburg |
Status Conceptual Cost $117.8 M In service 06/01/2028 Load 350 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 28 |
New Buffalo, PA PPL-2024-0017 · s3571 |
Alburtis Juniata New Buffalo New |
Status Conceptual Cost $242 M In service 05/30/2028 Load 1,000 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 30 |
Grand Landmark, PA PPL-2024-0005 · s3640 |
Palooka Wright |
Status Conceptual Cost $17.75 M In service 05/01/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 32 |
Susquehanna, PA PPL-2025-0003 · s3706 |
Sunbury Susquehanna Susquehanna T10 |
Cost $19.4 M In service 05/30/2028 Load 1,440 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 2 |
East Rutherford Area PSEG-2023-0008 · s3010 |
East Rutherford Van Winkle |
Status Engineering and Planning (Engineering) Cost $32.5M In service 06/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 4 |
Newark Bay Area PSEG-2023-0005 · s3007 |
Bayonne PVSC |
Status Engineering and Planning (Engineering) Cost $25.6M In service 12/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 6 |
South Edison Area PSEG-2023-0006 · s3008 |
Meadow Road | Status Engineering and Planning (Engineering) Cost $56.1M In service 05/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 8 |
Perth Amboy Area PSEG-2023-0007 · s3009 |
Keasbey Pierson Ave. Rahway South Edison |
Status Engineering and Planning (Engineering) Cost $220.68M In service 12/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 10 |
Harlingen Area PSEG-2023-0009 · s3090 |
Bennetts Lane Harlingen New Montgomery Mount Rose Sunnymeade |
Status Engineering and Planning (Engineering) Cost $105.1M In service 12/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 12 |
Plainfield Area PSEG-2023-0012 · s3184.1 |
South Second St. South Second Street |
Status Engineering and Planning (Engineering) Cost $6.5M In service 12/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 14 |
Deans – E Windsor – New Freedom 500kV Communications PSEG-2023-0013 · s3276.1 |
Deans E Windsor New Freedom |
Status Engineering and Planning (Engineering) Cost $39.2M In service 12/2025 (5022/Deans) & 12/2026 (5038/N Freedom) |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 16 |
Newark Bay Cogen PSEG-2023-0010 · s3277.1 |
Essex Switch | Status Engineering and Planning (Engineering) Cost $2M In service October 2024 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 18 |
Port Elizabeth Area PSEG-2024-0001 · s3310 |
Elizabeth First Street Port Street Roselle |
Status Engineering and Planning (Engineering) Cost $222.7M In service 06/2029 Load 8.0MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2024 RTEP p. 20 |
Kenilworth Area PSEG-2024-0003 · s3439 |
Aldene Roselle Springfield Rd. Springfield Road |
Status Engineering and Planning (Engineering) Cost $169.0M In service 12/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2025 RTEP p. 2 |
Newark Bay Area PSEG-2023-0005 · s3007.1 |
Bayonne PVSC |
Status Engineering and Planning (Engineering) Cost $25.6M In service 12/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2025 RTEP p. 4 |
South Brunswick PSEG-2024-0005 · s3570 |
Ridge Road Station West Windsor Station |
Status Engineering and Planning (Engineering) Cost $3.4M In service 06/30/2026 Load 35 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2025 RTEP p. 6 |
Lumberton Area PSEG-2023-0011 · s3569 |
Cookstown Lumberton Pemberton New |
Status Engineering and Planning (Engineering) Cost $64.5M In service 12/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2025 RTEP p. 8 |
East Rutherford Area PSEG-2024-0002 · s3604 |
East Rutherford | Status Engineering and Planning (Engineering) Cost $43.1M In service 5/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2025 RTEP p. 10 |
Kenilworth Data Center, NJ PSEG-2024-0007 · s3729 |
Galloping Hill Roselle Stanley Terrace |
Status Engineering and Planning (Engineering) Cost $66.8M In service 06/2029 Load 60 MW |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2026 RTEP p. 2 |
Newark Area PSEG-2025-0002 · s3735 |
McCarter Switching station New Newark switching station |
Status Engineering and Planning (Engineering) Cost $27.2M In service 12/31/2029 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2026 RTEP p. 4 |
Mount Laurel Area PSEG-2024-0004 · s3754.1 |
Burlington Cox’s Corner Creek Rd New Mount Laurel Substation |
Status Engineering and Planning (Engineering) Cost $85.0M In service May 2031 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2026 RTEP p. 6 |
PSE&G Central Territory PSEG-2025-0006 · s3808 |
Sand Hills | Status Engineering and Planning (Engineering) Cost $25.1M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Mid-Atlantic PSEG local plan submission for 2026 RTEP p. 8 |
PSE&G Southern Territory PSEG-2025-0007 · s3809 |
Gloucester Lawnside |
Status Engineering and Planning (Engineering) Cost $42.8M In service 12/31/2028 |
| 2026-09-08* | SRRTEP Mid-Atlantic UGI local plan submission for 2024 RTEP p. 2 |
UGI-2022-0001 | Hanover Hunlock Loomis Substation Mountain Substation |
Status Engineering Cost $6M In service 11/2025 |
| 2026-09-08* | SRRTEP Mid-Atlantic UGI local plan submission for 2026 RTEP p. 2 |
Plymouth-Palooka UGI-2023-0001 · s3753.1 |
Palooka Plymouth |
Status Engineering Cost $20 M In service 09/30/2026 |
| 2026-09-08* | SRRTEP Mid-Atlantic UGI local plan submission for 2026 RTEP p. 4 |
8th Street Substation UGI-2026-0002 · s3899.1 |
8th Street Substation New Swoyersville |
Status Engineering Cost $6.5 M In service 09/30/2027 |
| 2026-09-08* | SRRTEP Southern Dominion p. 3 |
Do No Harm (DNH) Analysis DOM-2020-0026-DNH · s2340.1 & s2340.2 |
Elk Run Gainesville Remington CT Rollins Ford |
Status Conceptual In service 12/31/2026 |
| 2026-09-08* | SRRTEP Southern Dominion p. 5 |
230 kV Line #2007 – EOL Rebuild DOM-2020-0036 · s2499 |
Lynnhaven Thalia |
Status Conceptual Cost $28.7 M In service 12/31/2025 Load 134 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 7 |
230 kV Partial Line #2019 – EOL Rebuild DOM-2020-0037 · s2500 |
Greenwich Thalia |
Status Conceptual Cost $14.3 M In service 12/31/2025 Load 134 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 9 |
Do No Harm Analysis DOM-2021-0016-DNH · s2609.2 |
Beaumeade Belmont Clark Goose Creek Substation Harrowgate Idylwood Locks Pleasant View Tyler |
Status In-Service (In service) Cost $40.0 M In service 12/15/2023 |
| 2026-09-08* | SRRTEP Southern Dominion p. 10 |
Nokesville - Add 2nd TX - DEV DOM-2021-0018 · s2620 |
Nokesville | Status Engineering Cost $0.75 M In service 11/01/2022 Load 63.3 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 12 |
Equipment Material Condition, Performance and Risk DOM-2021-0047 · s2825.1 |
Anaconda Edgecombe NUG Harts Mill Hathaway Tarboro |
Status Construction (Under construction) In service 12/31/2023 |
| 2026-09-08* | SRRTEP Southern Dominion p. 14 |
230 kV Line #272 – EOL Rebuild DOM-2021-0014 · s2613 |
Dooms Grottoes |
Status Conceptual Cost $34.0 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Southern Dominion p. 18 |
Barrister 230kV Delivery - DEV DOM-2022-0001 · s3027 |
Barrister Substation New Lockridge Roundtable Stratus |
Status Engineering Cost $24.0M (Total) In service 06/30/2026 Load 147.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 20 |
Ocean Court 230kV Delivery - DEV DOM-2022-0002 · s3028 |
Global Plaza Ocean Court New Pacific |
Status Engineering Cost $10.0M (Total) In service 06/30/2024 Load 158.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 22 |
Pleasant View - Add 4th TX - DEV DOM-2022-0010 · s3029 |
Pleasant View | Status Engineering Cost $1.0 M In service 03/06/2025 Load 55.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 24 |
Dawkins Branch 230kV Delivery - NOVEC DOM-2022-0017 · s3018 |
Dawkins Branch New Liberty Vint Hill |
Status Complete Cost $16.0M In service 06/30/2023 Load 76.8 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 26 |
Garrisonville - Add 2nd TX - DEV DOM-2022-0019 · s3019 |
Garrisonville Substation | Status Construction (Under construction) Cost $0.75M In service 05/17/2024 Load 74.4 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 28 |
Youngs Branch - Add 2nd TX - DEV DOM-2022-0020 · s3020 |
Youngs Branch | Status Construction (Under construction) Cost $0.75M In service 03/28/2024 Load 141.6 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 30 |
Replace Farmville TX#5 - DEV DOM-2022-0023 · s3041 |
Farmville | Status Engineering Cost $6.4 M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 32 |
Replace Clubhouse TX#1 - DEV DOM-2022-0024 · s3042 |
Clubhouse | Status Construction (Under construction) Cost $6.6 M In service 05/15/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 34 |
Evans Creek 230kV Delivery - DEV DOM-2022-0027 · s3021 |
Evans Creek New Raines Tunstall Sub |
Status Engineering Cost $30.0M (Total) In service 08/01/2025 Load 126.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 36 |
Tunstall 230kV Delivery - DEV DOM-2022-0028 · s3022 |
Finneywood Rawlings Tunstall Sub New Unity New |
Status Engineering Cost $140.0M (Total) In service 08/01/2025 Load 77.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 38 |
Raines 230kV Delivery - DEV DOM-2022-0029 · s3023 |
Raines New Tunstall Sub |
Status Engineering Cost $20.0M (Total) In service 08/01/2025 Load 37.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 40 |
Mountain Run 230kV Delivery - REC DOM-2022-0034 · s3044 |
Cirrus New Culpeper Kyser New |
Status Engineering Cost $60.0 M (Total) In service 12/30/2025 Load 350 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 42 |
Northstar 230kV Delivery - DEV DOM-2022-0035 · s3024 |
Brambleton Loudoun Northstar New |
Status Engineering Cost $10.0M In service 01/01/2025 Load 153.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 44 |
Thunderball 230kV Delivery - DEV DOM-2022-0036 · s3025 |
Brambleton Stonewater Thunderball New |
Status Construction (Under construction) Cost $10.0M In service 11/02/2024 Load 153.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 46 |
Trappe Rock 230kV Delivery - DEV DOM-2022-0037 · s3026 |
Altair Belmont Trappe Rock New |
Status Construction (Under construction) Cost $10.0M In service 09/02/2024 Load 153.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 48 |
White Oak 230kV Delivery - DEV DOM-2022-0038 · s3030.1, s3030.2 |
White Oak | Status Engineering Cost $30 M In service March 2023 Load 146.5 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 50 |
Techpark Place 230kV Delivery - DEV DOM-2022-0039 · s3031 |
Darbytown Portugee Techpark Place (TPP) Substation New TPP Substation New White Oak |
Status Construction (Under construction) Cost $25 M In service 04/01/2024 Load 283.6 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 52 |
Farmwell - Add 4th TX - DEV DOM-2022-0040 · s3032 |
Farmwell Substation | Status Construction (Under construction) Cost $0.5M In service 03/28/2024 Load 292.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 54 |
Stratus 230kV Delivery - DEV DOM-2022-0041 · s3033 |
Barrister Substation Enterprise Lockridge Roundtable Shellhorn Stratus New |
Status Engineering Cost $24.0M (Total) In service 08/29/2025 Load 185.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 56 |
Lockridge – Add 3 TX’s - DEV DOM-2022-0044 · s3034 |
Lockridge | Status Construction (Under construction) Cost $1.5M In service 02/28/2024 Load 288.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 58 |
Hornbaker 230kV Delivery - NOVEC DOM-2022-0045 · s3035.1 |
Hornbaker New Liberty Pioneer |
Status Engineering Cost $45.0M (Total) In service 12/30/2025 Load 150.0 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 60 |
Do No Harm (DNH) Analysis DOM-2022-0045-DNH · s3035.2 |
Brickyard Bristers Clifton Dawkins Branch Gainesville Hornbaker Nokesville Railroad Vint Hill |
Status Conceptual Cost $139.0M (Total) In service 12/31/2027 |
| 2026-09-08* | SRRTEP Southern Dominion p. 62 |
Mint Springs 230kV Delivery - NOVEC DOM-2022-0046 · s3036 |
Gainesville Loudoun Mint Springs New |
Status Engineering Cost $16.0M In service 01/02/2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 64 |
Rixlew 230kV Delivery - NOVEC DOM-2022-0047 · s3037 |
Liberty Pioneer Rixlew New |
Status Engineering Cost $10.0M In service 06/20/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 66 |
Do No Harm (DNH) Analysis DOM-2022-0001-DNH & DOM-2022-0041-DNH · s3040 |
Braddock Idylwood |
Status Conceptual Cost $43.5M In service 06/30/2027 |
| 2026-09-08* | SRRTEP Southern Dominion p. 68 |
Prentice Drive 230kV Delivery - DEV DOM-2022-0003 · s3056 |
Lockridge Prentice Drive New Shellhorn |
Status Engineering Cost $20.0 M In service 12/30/2024 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 70 |
Line #77 End of Life Rebuild DOM-2022-0016 · s3038 |
Carolina Roanoke Rapids Hydro |
Status Conceptual Cost $7.4 M In service 11/28/2025 |
| 2026-09-08* | SRRTEP Southern Dominion p. 72 |
Alleghany 138kV Delivery Point - DEV DOM-2022-0022 · s3045 |
Alleghany Clifton Forge Low Moor |
Status Complete Cost $5.0 M In service 12/20/2023 Load 21 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 74 |
Jeffress 230kV Delivery - MEC DOM-2022-0032 · s3061 |
Buggs Island Chase City Finneywood Jeffress New |
Status Engineering Cost $120.0 M In service 07/01/2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 76 |
Sycolin Creek 230kV Delivery - DEV DOM-2022-0042 · s3048 |
Sycolin Creek New Twin Creeks |
Status Engineering Cost $28.0 M In service 06/15/2026 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 78 |
Twin Creeks 230kV Delivery - DEV DOM-2022-0043 · s3049 |
Edwards Ferry Pleasant View Twin Creeks New |
Status Engineering Cost $20.0 M In service 12/31/2024 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 80 |
Do No Harm (DNH) Analysis DOM-2022-0046-DNH & DOM-2022-0047-DNH · s3047.1 |
Bristers Liberty Loudoun Meadowbrook Morrisville Nokesville Remington CT Rollins Ford Vint Hill Wheeler Wishing Star |
Status Conceptual Cost $23.0M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Southern Dominion p. 85 |
Cemetery Rd 115kV Delivery - DEV DOM-2022-0048 · s3039 |
Cemetery Road New Chase City Herbert |
Status Engineering Cost $5.0 M In service 10/15/2024 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 87 |
Gretna 69kV Delivery- Add 2nd TX - DEV DOM-2022-0050 · s3046 |
Gretna | Status Engineering Cost $0.5 M In service 12/15/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 89 |
Replace Clover Substation Breakers and Switches DOM-2022-0051 · s3050 |
Clover | Status Completed Cost $2.75 M In service 07/13/2023 |
| 2026-09-08* | SRRTEP Southern Dominion p. 91 |
Replace North Anna Substation Breakers and Switches DOM-2022-0052 · s3058 |
North Anna | Status Completed Cost $2.36 M In service 07/27/2023 |
| 2026-09-08* | SRRTEP Southern Dominion p. 93 |
Replace Davis TX#2 - DEV DOM-2022-0053 · s3059 |
Davis | Status Construction (Under construction) Cost $4.5 M In service 05/31/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 95 |
Lunar 230kV Delivery - DEV DOM-2022-0054 · s3074 |
Lunar New Sycolin Creek |
Status Engineering Cost $28.0 M In service 08/01/2026 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 97 |
Apollo 230kV Delivery - DEV DOM-2022-0055 · s3075 |
Apollo New Lunar |
Status Engineering Cost $28.0 M In service 01/01/2027 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 99 |
Pluto 230kV Delivery - DEV DOM-2022-0056 · s3080 |
Belmont Pleasant View Pluto New |
Status Engineering Cost $20.0 M In service 06/01/2026 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 101 |
Evergreen Mills Series Reactor DOM-2022-0057 · s3051 |
Brambleton Evergreen Mills Poland Road |
Status Complete Cost $3.0 M In service 06/14/2023 |
| 2026-09-08* | SRRTEP Southern Dominion p. 103 |
Pearsons Switch Replacement DOM-2022-0060 · s3060 |
Elmont Pearsons |
Status Complete Cost $0.5 M In service 10/31/2023 |
| 2026-09-08* | SRRTEP Southern Dominion p. 105 |
Replace 115kV Ground Switches with Circuit Switchers -DEV DOM-2022-0061 · s3052 |
Alexander Corner Brown Boveri Deep Creek Princess Anne Quantico Tunis |
Status Construction (Under construction) Cost $2.5 M In service 04/30/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 107 |
Starlight 230kV Delivery - DEV DOM-2023-0001 · s3076 |
Lunar Starlight New Sycolin Creek |
Status Engineering Cost $28.0 M In service 06/01/2028 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 109 |
Roundtable - Add 3rd and 4th TX - DEV DOM-2023-0005 · s3053 |
Roundtable | Status Engineering Cost $1.0 M In service 12/15/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 111 |
Bear Run 230kV Delivery - DEV DOM-2023-0007 · s3062 |
Bear Run New Bull Run Cub Run Sully |
Status Engineering Cost $24.5 M In service 03/15/2024 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 113 |
Foster Drive 230kV Delivery - CoM DOM-2023-0008 · s3064 |
Cannon Branch Foster Drive New Sandlot |
Status Engineering Cost $15.3 M In service 03/31/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 115 |
Daves Store 230kV Delivery - DEV DOM-2023-0009 · s3068.1 |
Daves Store New Heathcote |
Status Engineering Cost $40.0 M In service 06/01/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 117 |
Do No Harm (DNH) Analysis DOM-2023-0009-DNH · s3068.2 |
Braddock Idylwood |
Status Conceptual Cost $33.5M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Southern Dominion p. 119 |
Gemini 230kV Delivery - DEV DOM-2023-0010 · s3069 |
Daves Store Gemini New |
Status Engineering Cost $15.3 M In service 08/01/2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 121 |
Atlas 230kV Delivery - DEV DOM-2023-0011 · s3070 |
Atlas New Daves Store Gemini Trident |
Status Engineering Cost $15.4 M In service 04/01/2028 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 123 |
Trident 230kV Delivery - NOVEC DOM-2023-0012 · s3071 |
Gainesville Trident New Wheeler |
Status Engineering Cost $15.75 M In service 09/01/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 125 |
Youngs Branch - Add 3rd, 4th, and 5th TX - DEV DOM-2023-0014 · s3065 |
Youngs Branch | Status Engineering Cost $3.0 M In service 07/01/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 127 |
Firetower Rd 230kV Delivery - DEV DOM-2023-0015 · s3063 |
Earleys Firetower Rd New Suffolk |
Status Construction (Under construction) Cost $5.0 M In service 02/29/2024 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 129 |
Southall 230kV Delivery - REC DOM-2023-0017 · s3072 |
Desper North Anna Southall New |
Status Engineering Cost $55.0 M In service 05/01/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 131 |
Spartan 230kV Delivery Point - DEV DOM-2023-0018 · s3066 |
Spartan New | Status Engineering Cost $48.0 M In service 05/02/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 133 |
Buttermilk - Add 3rd and 4th TX - DEV DOM-2023-0019 · s3077 |
Buttermilk | Status Engineering Cost $1.0 M In service 12/15/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 135 |
Broderick Drive 230kV Delivery - DEV DOM-2023-0020 · s3079 |
Broderick Drive New Buttermilk Pacific |
Status Engineering Cost $24.5 M In service 03/01/2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 137 |
Otterdam 230kV Delivery - MEC DOM-2023-0027 · s3067 |
Carson Clubhouse Otterdam New |
Status Engineering Cost $25.0 M In service 12/31/2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 139 |
Upgrade Verona TX#1 - DEV DOM-2023-0028 · s3055 |
Verona | Status Engineering Cost $0.35 M In service 06/30/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 141 |
Weyers Cave – Install 2nd TX - DEV DOM-2023-0030 · s3078 |
Weyers Cave | Status Engineering Cost $0.85 M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 143 |
Cumulus 230kV Delivery- Add 5th TX - DEV DOM-2023-0032 · s3054 |
Cumulus | Status Engineering Cost $0.5 M In service 06/01/2025 |
| 2026-09-08* | SRRTEP Southern Dominion p. 145 |
Metcalf 115kV Delivery – TX Upgrade - DEV DOM-2023-0036 · s3057 |
Metcalf | Status Engineering Cost $0.62 M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 147 |
Bishop Sub – 115kV Delivery – MEC DOM-2023-0041 · s3081 |
Bishop New Kerr Dam Ridge Road |
Status Engineering Cost $15.0 M In service 01/01/2025 Load 48 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 149 |
Magruder Substation – Upgrade TX#1 DOM-2023-0037 · s3220.1 |
Magruder | Status Conceptual Cost $0.764 M In service 12/31/2024 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 151 |
Northwoods 230kV Delivery - NOVEC DOM-2023-0039 · s3218.1 |
Northwoods New Shellhorn Sojourner |
Status Engineering Cost $20.0 M In service 04/01/2026 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 153 |
230kV Line 246 – EOL Rebuild DOM-2023-0044 · s3222.1 |
Earleys Nucor Suffolk |
Status Conceptual Cost $150.0 M In service 12/31/2028 Load 36.7MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 155 |
Wishing Star DP 230kV Delivery- NOVEC DOM-2023-0045 · s3219.1 |
Wishing Star New | Status Engineering Cost $1.5 M In service 12/01/2026 Load 100MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 157 |
Princess Anne Substation – Upgrade TX#1 DOM-2023-0047 · s3221.1 |
Princess Anne | Status Conceptual Cost $0.5 M In service 12/30/2024 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 159 |
Bermuda Hundred 230kV Delivery - DEV DOM-2019-0021 · s3509.1 |
Allied Bermuda Hundred New ICI |
Status Engineering Cost $15.0 M In service Q4 2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 161 |
Kitkat 115kV Delivery - DEV DOM-2022-0031 · s3513.1 |
Kitkat New | Status Complete Cost $4.0 M In service 05/23/2024 Load 20 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 163 |
Edsall 230kV Delivery - DEV DOM-2022-0059 · s3504.1 |
Edsall New Hayfield Van Dorn |
Status Engineering Cost $40.0 M In service 09/01/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 165 |
Lost City 230kV Delivery - DEV DOM-2023-0033 · s3502.1 |
Lost City New Techpark Place White Oak |
Status Engineering Cost $12.3 M In service 07/01/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 167 |
Ironbridge Sub – Upgrade TX#2 and Install Ring Bus DOM-2023-0042 · s3501.1 |
Ironbridge Midlothian Spruance NUG |
Status Engineering Cost $10.3 M In service 09/01/2025 |
| 2026-09-08* | SRRTEP Southern Dominion p. 169 |
Allen Creek 230kV Delivery - DEV DOM-2023-0052 · s3511.1 |
Allen Creek New Cloud Finneywood |
Status Conceptual Cost $30.0 M In service 12/30/2025 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 171 |
Decoy Airfield 230kV Delivery - DEV DOM-2024-0001 · s3508.1 |
Decoy Airfield New Techpark Place White Oak |
Status Engineering Cost $12.0 M In service 01/01/2026 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 173 |
Nimbus - Add 3rd and 4th TX - DEV DOM-2024-0002 · s3505.1 |
Nimbus | Status Engineering Cost $1.4 M In service 10/31/2028 |
| 2026-09-08* | SRRTEP Southern Dominion p. 175 |
Replace Northwest TX#7 - DEV DOM-2024-0003 · s3503.1 |
Northwest | Status Complete Cost $5.0 M In service 06/18/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 177 |
230 kV Line #260 – EOL Rebuild DOM-2024-0014 · s3506.1 |
Grottoes Harrisonburg |
Status Conceptual Cost $28.0 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Southern Dominion p. 179 |
Sherwood TX#2 Upgrade - DEV DOM-2024-0021 · s3507.1 |
Sherwood | Status Engineering Cost $0.35 M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Southern Dominion p. 181 |
Sloan Drive 230kV Delivery - DEV DOM-2024-0022 · s3510.1 |
Bermuda Hundred Sloan Drive New |
Status Engineering Cost $25.0 M In service Q4 2027 Load 100 MW |
| 2026-09-08* | SRRTEP Southern Dominion p. 183 |
Line #2114 Reactor DOM-2024-0027 · s3512.1 |
Elk Run Remington CT Rollins Ford |
Status Engineering Cost $4.0 M In service 06/01/2025 |
| 2026-09-08* | SRRTEP Southern Dominion p. 185 |
Harrisonburg TX#1 Upgrade - DEV DOM-2023-0029 · s3527.1 |
Harrisonburg | Status Construction (Under construction) Cost $0.35 M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Kekionga Station AEP-2022-IM012 · s3144.1 |
Ellison Road Kekionga New Mckinley |
Status Scoping (Conceptual) Cost $4.4M In service 11/12/2025 Load 13MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 4 |
East Liverpool Station Upgrade AEP-2022-OH041 · s3145.1-.2 |
Arroyo East Liverpool Second Street South Chester Wylie Ridge |
Status Scoping (Conceptual) Cost $3.3 Million In service 5/1/2025 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 7 |
Wayne County, WV AEP-2023-AP005 · s3146.1-.3 |
Columbia Gas Leach Markwest Miller Switch Station Pipeline S.S. New South Neal Sweet Run S.S. New |
Status Scoping (Conceptual) Cost $7.8M In service 6/1/2024 Load 12 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 21 |
Pike County, KY and Mingo & McDowell Counties, WV Buchanan County, VA AEP-2022-AP007, AEP-2022-AP008, AEP-2022-AP009, AEP-2022-AP010, AEP-2022-AP011, AEP-2022-AP028, AEP-2023-AP010 · s3147.1-.41 |
Barrenshe Bear Creek New Bens Creek Briar Mountain Coleman Grapevine Hardy Hurley Jim Branch Lester Creek Lester Fork New Looney Creek Panther Peter Creek New Rapoca Sprigg Tug Fork New Wharncliffe |
Status Scoping (Conceptual) Cost $182.56 M In service 6/1/2030 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 25 |
Sorenson – Desoto 345kV AEP-2021-IM028 · s3148.1 |
Desoto Keystone Sorenson Tanners Creek |
Status Scoping (Conceptual) Cost $202.4M In service 06/10/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 27 |
South Coshocton – Wooster Rebuild AEP-2021-OH025 · s3140.1-.3 |
Ohio Central South Coshocton West Coshocton West Millersburg Wooster |
Status Scoping (Conceptual) Cost $97.54M In service 10/31/2026 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 29 |
Pulaski County, Virginia AEP-2023-AP011 · s3141.1-.3 |
Claytor Pulaski Snowville New Wurno |
Status Scoping (Conceptual) Cost $1.98 M In service 10/31/2025 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 34 |
Haviland-Van Wert Rebuild AEP-2022-OH043, AEP-2023-OH065 · s3142.1-.5 |
Haviland Logtown Maddox Creek North Delphos South Van Wert Timber Switch Van Wert |
Status Scoping (Conceptual) Cost $32.57M In service 1/1/2026 Load 760MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 35 |
Apple Grove, WV AEP-2022-AP014 · s3143.1-.7 |
Apple Grove Mercers Bottom New South Point Sporn Tri-State |
Status Scoping (Conceptual) Cost $215.8M In service Phase 1 – 12/15/2025, Phase 2 – 12/15/2029 Load 450 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 40 |
Lancaster Area Improvements AEP-2020-OH026, AEP-2021-OH026, AEP-2021-OH027 · s3133.1-.15 |
Anchor Hocking Clouse Crooksville East Lancaster East Logan Geneva Switch Junction City Lancaster Junction New Lexington North Logan Ralston Shawnee South Lancaster West Lancaster |
Status Engineering Cost $108.77 In service 04/25/2025 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 42 |
Carroll County, VA AEP-2021-AP009 · s3134.1-.2 |
Huffman Jacksons Ferry Wildwood New |
Status Engineering Cost $20.8 M In service 11/15/2024 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 45 |
Buchanan County & Tazewell County, VA AEP-2021-AP014 · s3135.1-.5 |
Coal Creek Garden Creek Mount Heron Permac Richlands Skeggs Branch Whetstone Branch |
Cost $29.2 M In service 10/30/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 47 |
Rothadew Area Improvements AEP-2022-IM013 · s3136.1-.7 |
Colby Dewey Lake Street New Gearcon Sw. Hartford Keelette Rothadew Sister Lakes Twin Lakes Sw. Valley |
Status Scoping (Conceptual) Cost $7.89M In service 7/27/2027 Load 28MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 50 |
Jackson County, WV AEP-2023-AP021 · s3137.1-.3 |
Cottageville Kera Lakes New Polymer Yellow Bush |
Status Scoping (Conceptual) Cost $0 In service 12/13/2024 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 52 |
Taylor Station AEP-2023-OH012 · s3138.1 |
Taylor | Status Engineering Cost $ 1.26M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 64 |
Beckley , WV AEP-2022-AP015, AEP-2022-AP016, AEP-2022-AP017, AEP-2022-AP018, AEP-2022-AP019, AEP-2022-AP020, AEP-2022-AP021 · s3139.1-.35 |
Armory New Beckley Bowyer Bradley Cherry Creek Coal City New Crab Orchard Cranberry Creek New East Beckley New Glen White Killarney Lester Square New North Beckley Pemberton Shockley Sophia Stotesbury Sweeneysburg Switch Tams Mountain Whitestick |
Status Scoping (Conceptual) Cost $150.9M In service 6/10/2031 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 68 |
Buchanan County, Virginia AEP-2022-AP040 · s3211.1-.7 |
Big Rock Conaway New Grundy Looney Creek Thomas |
Status Scoping (Conceptual) Cost $38.12 M In service 5/1/2028 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 70 |
Van Wert, Ohio AEP-2023-OH043 · s3212.1-.2 |
Cavett Vision New West Van Wert |
Status Engineering Cost 4.11M In service 12/01/2024 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 72 |
Columbus, OH AEP-2023-OH047 · s3213.1-.6 |
Bethel Road Blaire Cole Davidson Hilliard Milepost New Roberts Trabue |
Status Engineering Cost $12.05 M In service 04/15/2024 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 74 |
Jackson County, Ohio AEP-2023-OH057 · s3214.1-.4 |
Corwin Heppner Lick Poston Veterans |
Status Scoping (Conceptual) Cost $1.53 M In service 12/31/2024 Load 25 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 81 |
McDowell County, West Virginia AEP-2022-AP022, AEP-2022-AP023, AEP-2022-AP024, AEP-2022-AP025 · s3215.1-.7 |
Baileysville Belcher Mountain Carswell Clark Branch Coalfields New Gary Jim Branch Switchback Tazewell Thorpe Trail Fork |
Status Scoping (Conceptual) Cost $24.84 M In service 11/1/2028 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 82 |
Licking County, Ohio AEP-2023-OH013 · s3301.1 |
Etna (OP) station Mink station |
Status Engineering Cost $ 2.7M In service 3/28/2025 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 84 |
Price 69 kV Capacitor Bank Install AEP-2023-IM025 · s3302.1-.2 |
Price Randolph Selma Parker Winchester |
Status Scoping (Conceptual) Cost $ 1.52M In service 11/25/2024 Load 28MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 88 |
Pike County, KY AEP-2022-AP034, AEP-2024-AP001 · s3303.1-.2 |
Bevins Metering Point Gund Metering Point Hatfield Johns Creek |
Status Engineering Cost $1.74M In service 11/15/2024 Load 20 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 89 |
Project Markle AEP-2023-IM021 · s3304.1 |
Sorenson Van Buren |
Status Scoping (Conceptual) Cost $9.4 M In service 10/1/2026 Load 12MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 91 |
Lancaster, Ohio AEP-2023-OH078 · s3305.1-.03 |
Sifford | Cost $9.322M In service 09/30/2024 Load 196 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 93 |
Roanoke, VA AEP-2024-AP002 · s3306.1 |
Huntington Court | Status Scoping (Conceptual) Cost $0 In service 11/30/2025 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 95 |
Ridgeway, VA AEP-2024-AP003 · s3307.1-.2 |
Rich Acres | Status Scoping (Conceptual) Cost $1.4 M In service 06/17/2025 Load 12.9 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 97 |
West Lancaster – West Millersport 138 kV AEP-2024-OH029 · s3308.1-.3 |
South Baltimore West Lancaster West Millersport |
Cost $40.4M In service 10/31/2026 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 99 |
Wolf Hills Breaker Replacement AEP-2021-AP025 · s3387.1 |
Wolf Hills | Status Scoping (Conceptual) Cost $5.3 M In service 9/10/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 101 |
Raikes Branch Delivery Point AEP-2023-AP024 · s3388.1 |
Raikes Branch | Status Engineering Cost $0 M In service 10/3/2024 Load 5MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 103 |
Hathaway Switch, IN AEP-2023-IM022 · s3389.1 |
Albion Robison Park |
Status Scoping (Conceptual) Cost $3.2 M In service 06/19/2025 Load 6MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 105 |
Hathaway Switch, IN AEP-2023-IM024 · s3390.1 |
Albion Robison Park |
Status Scoping (Conceptual) Cost $4.5 M In service 03/31/2027 Load 6MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 107 |
South Columbus, OH AEP-2022-OH071 · s3440.1-.6 |
Beatty Bixby Canal Clinton Cyprus Marion station Mound Obetz Parsons Rozelle Saint Clair Avenue Waverly |
Status Scoping (Conceptual) Cost $57.5M In service 06/05/2027 Load 675 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 124 |
Dublin & Hilliard, OH AEP-2021-OH049, AEP-2022-OH024, AEP-2022-OH035, AEP-2023-OH041 · s3441.1-.7 |
Amlin Beacon New Beatty Bolton Celtic New Cosgray Dublin Hall Hayden Hyatt Jerome New Kileville Roberts Sawmill Wilson |
Status Scoping (Conceptual) Cost $143.7M In service 12/01/2026 Load 461 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 154 |
Central/NW OH, Indiana. AEP-2022-OH023, AEP-2022-OH034, AEP-2022-OH036, AEP-2022-OH045, AEP-2022-OH046, AEP-2022-OH075, AEP-2022-OH077, AEP-2023-OH016, AEP-2023-OH019, AEP-2023-OH032, AEP-2023-OH040, AEP-2023-OH044, AEP-2023-OH052, AEP-2023-OH063 · s3442.1-.30 |
Anguin Babbitt Badger New Bermuda New Brie Chinstrap New Conesville Corridor Curleys New Dumont Fiesta New Fremont Green Chapel Horizon New Innovation Jorden New Jug Kiber station New Kirk Lancaster Macy New Newark Center Souder New Tasjan New Vassell |
Status Scoping (Conceptual) Cost $378.3M In service 10/13/2027 Load 968 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 159 |
Franklin County, Ohio AEP-2023-OH048 · s3445.1-.4 |
Blendon Clinton Giles New Huntley Karl Scherers Switch |
Status Scoping (Conceptual) Cost $5.3 M In service 10/01/2025 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 161 |
Marion Station Rehab, Ohio AEP-2021-OH050 · s3446.1-.6 |
Bixby Harrison LSII Marion Road Mound Street |
Status Scoping (Conceptual) Cost $40.16 M In service 03/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Ligonier, Indiana AEP-2024-IM010 · s3591.1-.2 |
Charger Station Ligonier |
Status Scoping (Conceptual) Cost $2 M In service 09/14/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Columbus, OH AEP-2023-OH004 · s3577.1-.3 |
Bexley Etna Road Poth station |
Status Scoping (Conceptual) Cost $7.233 M In service 09/30/2026 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 7 |
Scioto County, Ohio AEP-2022-OH068 · s3589.1 |
North Portsmouth Oertels Oertels Corner |
Status Scoping (Conceptual) Cost $3.873 M In service 05/01/2026 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 9 |
New Albany, OH AEP-2023-OH070 · s3590.1-.3 |
Green Chapel New Groves Corner station New Kiber station New |
Status Engineering Cost $32.288 M In service 01/02/2026 Load 43 MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 11 |
Project Amazing Sites 100 and 201 AEP-2023-IM023 · s3588.1-.7 |
Dumont Elderberry station Larrison Drive New New Prairie New Olive Sorenson |
Status Scoping (Conceptual) Cost $184.977M In service 12/15/2026 Load 1100MW |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 13 |
Franklin, OH AEP-2024-OH033 · s3593.1-.3 |
Bexley Drew station New St. Clair Ave stations |
Status Scoping (Conceptual) Cost $10.793 M In service 11/30/2026 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 15 |
Western Indiana and Central Ohio AEP-2023-IM015 · s3594.1 |
Olive Reynolds |
Cost $452.64 M In service 05/30/2031 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 20 |
Summerhill, OH AEP-2024-OH015 · s3596.1 |
Summerhill | Status Scoping (Conceptual) Cost $2.03 M In service 02/01/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 22 |
Fort Wayne, IN AEP-2023-IM018 · s3595.1 |
Bass Lawton Park Slater Steel Spring St Spy Run |
Status Scoping (Conceptual) Cost $6.758 M In service 3/17/2028 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 24 |
Kanawha County, WV AEP-2022-AP031, AEP-2023-AP022 · s3606.1-2 |
Turner Station Ward Hollow 46 kV Station |
Status Scoping (Conceptual) Cost $33.1 M In service 08/01/2027 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 28 |
Greenbrier County, WV AEP-2023-AP017 · s3607.1-3 |
Glen Lyn Station Grandview Station Hinton Station |
Cost $7.8 M In service 11/05/2029 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 30 |
Wood County, Ohio AEP-2019-OH052, AEP-2022-OH027 · s3641.1-15 |
Bellard station Greensburg New Gypsy Lane station New Liberty North Baltimore Poe Road substation Portage Sandridge 69kV substation |
Status Scoping (Conceptual) Cost $80.204 M In service 11/30/2028 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 37 |
Jefferson County, Ohio AEP-2022-OH017 · s3724.1-2 |
Fort Steuben Hammondsville |
Status Scoping (Conceptual) Cost $84.162 M In service 03/16/2029 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 39 |
S2167 Scope Change AEP-2018-IM002, AEP-2019-IM035, AEP-2019-IM025, AEP-2019-IM046 · S2167 |
Boundary station New FourFlag station New Kenzie Creek Lake Street station Niles station Pokagon station South Side Station Swanson station |
Status Scoping (Conceptual) Cost $125.8M In service 3/13/2026 |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 41 |
Fall Creek, IN AEP-2024-IM013 · 3723.1-3 |
Aladdin station Desoto Fall Creek |
Status Scoping (Conceptual) Cost $9.326 M In service 05/27/2026 |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Pioneer, OH AMPT-2022-002 · s3117.1 (AMPT); s3117.2 (AMPT), s3117.3 (AMPT), s3117.4 (ATSI); s3117.5 (ATSI), s3117.6 (ATSI) |
East Fayette Kexon Kidston Pioneer Snyder Substation Stryker |
Status Conceptual (AMPT), Conceptual (ATSI) Cost $26.5 M In service 5/31/2027 Load 8 MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2024 RTEP p. 5 |
Tipp City, OH AMPT-2023-002 · s3217.1 (AMPT) |
Tower | Status Engineering (AMPT) Cost $1.24M In service 6/1/2025 Load 10MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2024 RTEP p. 7 |
Piqua, OH AMPT-2023-001 · s3216.1 (AMPT); s3216.2 (AES) |
Hardin New Piqua #6 New Piqua Sub 5 |
Status Conceptual (AMPT), Conceptual (AES) Cost $14.8 M In service 12/1/2027 |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2024 RTEP p. 10 |
Napoleon, OH AMPT-2023-005 · s3352.1 (AMPT); s3352.2 (FE) |
Enterprise Midway Napoleon Richland Sullivan |
Status Engineering (AMPT), Conceptual (FE) Cost $18.6 M In service 8/1/2026 (AMPT), 10/02/2026 (FE) Load 43 MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2024 RTEP p. 14 |
Tipp City, OH AMPT-2023-003 & Dayton-2023-004 · s3351.1 (AMPT); s3351.2 (AES) |
Canal Kessler New Miami Peters Road Tipp City Tower |
Status Conceptual (AMPT), Conceptual (AES Ohio) Cost $39.6M In service 6/30/2028 Load 40MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2026 RTEP p. 2 |
Versailles, OH AMPT-2024-001 · s3734.1 (AMPT), s3734.2 (AMPT), s3734.3 (AMPT), s3734.4 (AMPT), s3734.5 (AMPT), s3734.6 (AMPT), s3734.7 (AES), s3734.8 (AES) |
Baker Road New Greenlawn McGreevey Road Station New Rossburg Russia Water Street |
Status Engineering Cost $66.6 M In service 6/30/2028 Load 16 MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2026 RTEP p. 5 |
Bowling Green, OH AMPT-2025-003 · s3767.1 (AMPT) |
Gypsy Lane | Status Pre-Engineering (Engineering) Cost $3.2M In service 10/30/2027 |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2026 RTEP p. 7 |
Orrville, OH AMPT-2023-004 · s3832.1 (AMPT), s3832.2 (ATSI), s3832.3 (AMPT), s3832.4 (AMPT), s3832.5 (AMPT), s3832.6 (AEP) |
Apple Ave Cloverdale East Wooster Mineral Springs New Power Plant Star |
Status Engineering Cost $68.741M In service 8/30/2030 Load 60 MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2026 RTEP p. 10 |
Niles Central 138 kV substation AMPT-2025-005 · s3888.1 (AMPT) & s3888.2 (ATSI) |
McDonald Steel Niles Niles Central |
Status Pre-Engineering (Engineering) Cost $14.1M In service 08/01/2028 Load 63 MW |
| 2026-09-08* | SRRTEP Western AMPT local plan submission of the supplemental projects for 2026 RTEP p. 12 |
Poe Road - Tontogany 69 kV line AMPT-2025-004 · s3889.1 (AMPT) & s3889.2 (ATSI) |
Poe Road Sand Ridge Tontogany |
Status Pre-Engineering (Engineering) Cost $6.136 M In service 11/30/2028 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 3 |
Sage 230 kV Customer Load Increase APS-2023-017 · s3152.1 |
Doubs Eastalco Lime Kiln Sage |
Cost $1.5M In service 10/01/2025 Load 576 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 6 |
Doubs – Sage 230 kV New Customer APS-2023-029 · s3150.2 |
Doubs Lime Kiln Quantum 400 New Sage |
Cost $20.8M In service 09/01/2025 Load 300 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 8 |
Doubs – Lime Kiln 230 kV #231 Line New Customer APS-2023-031 · s3153.1 |
Doubs Lime Kiln |
Cost $28.7M In service 12/31/2025 Load 360 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 11 |
Stoner Junction 138 kV Line APS-2023-006 · s3123.1 |
Connellsville Iron Bridge King Farm Stoner Junction |
Cost $ 31.5 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 13 |
Penn-North Oakford 138 kV New Customer APS-2023-008 · s3125.1 |
North Oakford Penn |
Cost $5.4M In service 12/31/2024 Load 100 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 15 |
Greenwood-Redbud 138 kV New Customer APS-2023-013 · s3126.1 |
Greenwood Redbud |
Cost $1.6M In service 05/3/2024 Load 35 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 17 |
Page-Riverton 138 kV New Customer APS-2023-014 · s3127.1 |
Catlett Mountain New Page Riverton |
Cost $16M In service 05/30/2025 Load 35 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 19 |
Messick Road – Morgan 138 kV New Customer APS-2023-015 · s3128.1 |
Messick Road Morgan |
Cost $1.8M In service 12/31/2024 Load 5 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 21 |
Marlowe Substation APS-2023-027 · s3131.1 |
Bedington Boonsboro Marlowe Substation |
Cost $ 0.3 M In service 10/27/2023 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 23 |
Damascus – Mount Airy 230 kV Misoperation Relays APS-2023-026 · s3091.1 |
Damascus Mount Airy |
Cost $ 2.2 M In service 12/22/2023 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 26 |
Meadow Brook Substation APS-2023-037 · s3092.1 |
Meadow Brook | Cost $ 2.3 M In service 12/20/2024 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 28 |
Doubs Substation APS-2023-016 · s3093.1 |
Doubs | Cost $5.43M In service 06/07/2024 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 30 |
Black Oak - Hatfield 500 kV Misoperation Relays APS-2023-038 · s3094.1 |
Black Oak Hatfield Substation |
Cost $ 11.8 M In service 4/27/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 32 |
Buckhannon-Pruntytown 138 kV New Customer APS-2021-012 · s3095.1 |
Buckhannon Substation Pruntytown Substation |
Cost $5.0M In service 07/02/2025 Load 40 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 34 |
Ethel Springs – Bethlen 138 kV Network APS-2023-009 · s3096.1 |
Bethlen Substation Ethel Springs Substation Loyalhanna Social Hall Substation Vasco Substation |
Cost $59.6M In service 12/31/2025 Load 14.43 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 36 |
Misoperation Relay Projects APS-2023-018, APS-2023-019, APS-2023-020 |
Albright Substation Fairview Glen Falls Substation Grassy Falls Substation Hazelton Substation Lake Lynn Substation |
Cost $1.3 M In service 12/1/2025 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 39 |
Misoperation Relay Projects APS-2023-023, APS-2023-024, APS-2023-025 |
Garrett Guilford Parkersburg Substation Reid Ridgeley Trissler |
Cost $3.2 M In service 11/17/2023 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 42 |
Bedington – Marlowe BMA 138 kV Line New Customer APS-2023-030 · s3103.1 |
Bedington Marlowe Substation |
Cost $30.4M In service 2/28/2025 Load 64 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 44 |
Inwood – Stonewall 138 kV Line New Customer APS-2023-039 · s3104.1 |
Inwood Stonewall |
Cost $1.1M In service 4/17/2024 Load 12 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 46 |
Millville Substation APS-2023-040 · s3105.1 |
Millville Old Chapel |
Cost $0.7M In service 04/15/2024 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 48 |
Misoperation Relay Projects APS-2023-036, APS-2023-041 to APS-2023-043, APS-2023-045 to APS-2023-049 |
Armstrong Substation Cabot Edgelawn Fairview Franklin Substation Gilboa Substation Grassy Falls Substation Houseville Substation McCalmont Price Hill Substation Pruntytown Substation Pursely Substation Sutton Substation Trissler |
Cost $2.2 M In service 11/29/2024 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 52 |
Cumberland Substation APS-2023-051 · s3116.1 |
Cumberland Short Gap |
Cost $ 0.4 M In service 12/31/2023 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 54 |
Bedington Substation APS-2023-028 · s3162.1 |
Bedington | Cost $21.8M In service 06/01/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 56 |
Bedington – Doubs 500 kV Misoperation Relays APS-2023-057 · s3163.1 |
Bedington Doubs |
Cost $ 6.95 M In service 02/28/2025 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 59 |
Misoperation Relay Projects APS-2023-064 to APS-2023-066, APS-2023-069 |
Albright Substation Edgelawn Fawn Gobain Substation Goff Run Substation Kingwood Pruntytown Substation Weirton Substation Wylie Ridge Substation |
Cost $1.7 In service 06/01/2024 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 62 |
Misoperation Relay Projects APS-2023-066, APS-2023-069 · s3160.1, s3161.1 |
Albright Substation Fawn Gobain Substation Kingwood Pruntytown Substation |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 65 |
Carroll 230/138 kV Transformer #4 APS-2023-063 |
Carroll | No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 66 |
Carroll 230/138 kV Transformer #4 and Misoperation Relays APS-2023-034 and APS-2023-063 · s3189.1, s3190.1 |
Carroll Mount Airy Mt. Airy |
Cost $8.6M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 67 |
Harrison – Pruntytown 500 kV Misoperation Relays APS-2023-056 · s3191.1 |
Harrison Pruntytown Substation |
Cost $0.86M In service 11/29/2024 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 70 |
Misoperation Relay Projects APS-2023-075, APS-2023-079 to APS-2023-084, APS-2023-086, APS-2023-087 |
Bredinville Butler Cabot Springdale |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 73 |
Misoperation Relay Projects APS-2023-080, APS-2023-081 · s3196.1, s3197.1 |
Allenport Charleroi Loyalhanna Luxor Youngwood |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 74 |
Misoperation Relay Projects APS-2023-082, APS-2023-083, APS-2023-084 · s3198.1, s3199.1, s3200.1 |
Armstrong Substation Burma Saltsburg Vandergrift Youngwood Yukon |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 75 |
Misoperation Relay Projects APS-2023-086, APS-2023-087 · s3201.1, s3202.1 |
Dupont Edgelawn Fairview Grant Town Larkmead Rivesville |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 77 |
Misoperation Relay Project APS-2021-008 |
None named | No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 78 |
Misoperation Relay Project APS-2021-009 |
None named | No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 79 |
Misoperation Relay Projects APS-2021-007, APS-2021-008, APS-2021-009 · s2930, s2931, s2932 |
Belmont French Creek Oak Grove Parkersburg Substation Pickens Trissler |
Status IN SERVICE |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 80 |
APS-2023-003 | Price Hill Substation | Cost $0.3M In service 5/8/2023 Load 8 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 82 |
APS-2023-004 | Hardy Junction Substation |
Cost $ 42.6 M In service 12/1/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 84 |
APS-2023-005 | Hardy Page |
Cost $ 45.8 M In service 6/1/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 86 |
Misoperation Relay Projects APS-2024-002, APS-2024-003, APS-2024-004 · s3353.1, s3354.1, s3355.1 |
Belmont Lime Kiln Monocacy Substation |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 89 |
Misoperation Relay Projects APS-2023-067, APS-2023-068 · s3357.1, s3358.1 |
Hardy Junction Substation Loughs Lane Substation Pickens |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 92 |
Cabot 500/138 kV Transformers APS-2023-060, APS-2023-061, APS-2023-062 · s3364.1, s3365.1, s3366.1 |
Cabot | No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 95 |
Misoperation Relay Projects APS-2024-012, APS-2024-017 · s3368.1, s3369.1 |
Butler Cabot Grafton Pruntytown Substation |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 98 |
Damascus – Montgomery 230 kV Line Misoperation Relay Project APS-2024-001 · s3451.1 |
Damascus Montgomery |
Cost $2.8M In service 06/01/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 101 |
Bedington No. 3 500/138 kV Transformer APS-2024-027 · s3452.1 |
Bedington | Cost $18.7M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 103 |
Misoperation Relay Projects APS-2023-072, APS-2024-018 · s3457.1, s3458.1 |
Cabot Chesapeake Everson Kiski Valley Northpointe Rivesville |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 108 |
Charleroi – Washington 138 kV Line APS-2024-009, APS-2024-026 · s3459.1, s3460.1 |
Charleroi Vanceville Washington |
Cost $4.4M In service 12/06/2024 Load 16.7 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 110 |
Belmont 500/138 kV Transformers APS-2024-020 to APS-2024-022 · s3461.1, s3462.1, s3463.1 |
Belmont | No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 112 |
Misoperation Relay Projects APS-2024-005, APS-2024-006 · s3464.1, s3465.1 |
Harrison Pruntytown Substation Wylie Ridge Substation |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 115 |
Misoperation Relay Projects APS-2024-008, APS-2024-011, APS-2024-013, APS-2024-015, APS-2024-016, APS-2024-024, APS-2024-030 to APS-2024-034 |
Antietam Bethelboro Charleroi East Hagerstown Paper City Ridgway Yukon |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 118 |
Misoperation Relay Projects APS-2024-016, APS-2024-024, APS-2024-030, APS-2024-031 · s3474.1, s3475.1, s3476.1, s3477.1 |
Bedington Belmont Iron Bridge Marlowe Substation Ridgeley Trissler |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 119 |
Misoperation Relay Projects APS-2024-032, APS-2024-033, APS-2024-034 · s3478.1, s3479.1, s3480.1 |
Belmont Carnegie Edgelawn Weirton Substation |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 120 |
Grand Point – Guilford 138 kV Line Customer Connection APS-2024-035 · s3481.1 |
Grandpoint Guilford |
Cost $1.75M In service 10/31/2025 Load 9 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 122 |
Inwood – Kearneysville 138 kV Line Customer Connection APS-2024-036 · s3482.1 |
Inwood Kearneysville |
Cost $2.25M In service 11/30/2027 Load 25 MVA |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 124 |
Milesburg 230 kV Substation APS-2023-021 · s3483.1 |
Dale Summit Milesburg Moshannon |
Cost $9.8M In service 12/17/2027 Load 107.6 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 126 |
Misoperation Relay Projects APS-2024-039, APS-2024-041 to APS-2024-045, APS-2024-048 to APS-2024-051 |
Antietam Back Fork Bedington Canaan Valley Cowen Crupperneck Double Toll Gate East Hagerstown Glenville Greenwood Nipetown Paramount Redbud Reid Ringgold Seneca Caverns Shaffers Corner Springdale Weston Substation William |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 131 |
Misoperation Relay Projects APS-2024-062 to APS-2024-068 |
Double Toll Gate Gordon Grand Point Guilford Hempfield Huntingdon Substation Kearneysville Loyalhanna Luxor Manifold Millville Nyswaner Old Chapel Opequon Perryman Robbins Sewickley Yukon |
No figures printed |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 135 |
Misoperation Relays APS-2024-059 · s3526.1 |
Doubs Monocacy Substation West Jefferson |
Cost $4.0 In service 04/06/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Misoperation Relay Projects APS-2024-057 · s3540.1 |
Doubs Frostown Junction Ringgold |
Cost $6.30 In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Misoperation Relay Projects APS-2024-058 · s3541.1 |
Lime Kiln Montgomery |
Cost $9.20 In service 10/31/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 5 |
Misoperation Relay Project APS-2020-003 · s3542.1 |
Burma Piney |
Cost $1.9 In service 10/31/2025 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 8 |
Monocacy No. 4 230/138 kV Transformer APS-2024-061 · s3573.1 |
Monocacy Substation | Cost $9.00 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 10 |
Pruntytown No. 3 500/138 kV Transformer APS-2024-071 · s3574.1 |
Pruntytown Substation | Cost $15.77 M In service 6/30/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 12 |
Stony Springs Junction Area APS-2023-022 · s3575.1 |
Delmont Substation Harrison City Substation Hempfield Luxor North Greensburg Substation North Oakford North Oakford Tap Penn South Oakford Tap Stony Springs Junction |
Cost $13.6M In service 6/22/2027 Load ~25 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 16 |
New Customer APS-2023-029 (s3150.1, s3150.2) · s3150.2 |
Doubs Lime Kiln Quantum 400 New |
Cost $23.2M In service 12/31/2025 Load approximately 300 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 18 |
New Customer APS-2023-029 · s3150.1 |
Doubs Quantum 400 Sage |
Cost $8M In service 12/31/2027 Load approximately 300 MW |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 19 |
Huntingdon – Springdale 138 kV Line APS-2025-006 · s3666.1 |
Huntingdon Substation Springdale |
Cost $4.71M In service 5/1/2028 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 21 |
Bedington – Marlowe 138 kV Line APS-2025-007 · s3667.1 |
Bedington Marlowe Substation |
Cost $4.00M In service 7/26/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 23 |
Hardy – North Petersburg 138 kV Line APS-2025-008 · s3668.1 |
Hardy North Petersburg Substation |
Cost $5.20M In service 7/26/2025 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 27 |
Misoperation Relay Projects APS-2024-114 · s3642.1, s3642.2 |
Buckhannon Substation French Creek |
Cost $7.1 M In service 03/30/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 28 |
Misoperation Relay Projects APS-2024-116 · s3643.1, s3643.2 |
Weirton Substation Wylie Ridge Substation |
Cost $7.04 M In service 04/27/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 29 |
Misoperation Relay Projects APS-2024-090 · s3644.1 |
Tiltonsville Windsor |
Cost $1.05 M In service 11/20/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 32 |
Albright Substation APS-2024-072 · s3645.1 |
Albright Substation Snowy Creek Tap |
Cost $1.69 M In service 08/20/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 34 |
Black Oak – Junction 138 kV Line APS-2024-056 · s3646.1, s3642.2, s3642.3 |
Black Oak Junction Substation |
Cost $48.81 M In service 12/14/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 36 |
Arroyo – East Liverpool – Wylie Ridge 138 kV APS-2024-119 · s3647.1 |
Arroyo Junction East Liverpool South Chester Tap Wylie Ridge Substation |
Cost $1.1 M In service 05/09/2025 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 38 |
Pruntytown No. 1 500/138 kV Transformer APS-2024-077 · S3655.1 |
Pruntytown Substation | Cost $ 18.8 M In service 06/13/2031 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 40 |
Pruntytown No. 2 500/138 kV Transformer APS-2024-078 · S3653.1 |
Pruntytown Substation | Cost $ 18.8 M In service 12/13/2030 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 42 |
Wylie Ridge No. 7 500/345 kV Transformer APS-2024-080 · S3654.1 |
Wylie Ridge Substation | Cost $ 20 M In service 12/13/2030 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 44 |
Frederick A – Monocacy 230 kV Line APS-2025-001 · S3656.1 |
Frederick A Substation Monocacy Substation |
Cost $ 3.9 M In service 11/24/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 46 |
Misoperation Relays APS-2024-104 · S3657.1, S3657.2, S3657.3 |
Brownsville Jct Charleroi Emerald Substation Gates Hill Substation |
Cost $6.17 M In service 07/02/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 49 |
Fairview – Whiteley 138 kV APS-2025-010 · S3658.1 |
Blacksville No. 1 Tap Fairview Miracle Run Tap Whiteley |
Cost $1.3 M In service 08/21/2026 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 51 |
Misoperation Relay Projects APS-2024-098 · s3707.1 |
Bethel Park Substation St Clair |
Cost $4.5 In service 7/27/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 51 |
Misoperation Relay Projects APS-2024-099 · s3708.1 |
Cherry Run McConnellsburg Warfordsburg |
Cost $2.5 In service 7/13/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 51 |
Misoperation Relay Projects APS-2024-100 · s3709.1 |
Harwick Houseville Substation |
Cost $3.4 In service 12/31/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 51 |
Misoperation Relay Projects APS-2025-015 · s3710.1 |
Carnegie Tidd Weirton Substation |
Cost $1.9 In service 12/31/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 55 |
Misoperation Relay Projects APS-2024-014 · s3711.1 |
Millville Sleepy Hollow |
Cost $2.00 M In service 01/31/2027 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 55 |
Misoperation Relay Projects APS-2024-047 · s3712.1 |
Cherry Run Morgan |
Cost $2.30 M In service 07/21/2029 |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 55 |
Misoperation Relay Projects APS-2025-018 · s3713.1 |
Black Oak Cross School |
Cost $4.55 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 3 |
ATSI Transmission Zone M-3 Process New
New London 69 kV Project AEP-2019-OH034 · s2748.8 |
Fireland’s New London Hanville South Greenwich Wellington |
Cost $10.0M In service 9/3/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 6 |
ATSI Transmission Zone M-3 Process
Carlisle - Woodford 69 kV Line Customer Connection ATSI-2023-005 · s3129.1 |
Carlisle Woodford |
Cost $1.3M In service 11/17/2023 Load 6 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 8 |
ATSI Transmission Zone M-3 Process
Campbellsport – Ravenna No 1 69 kV Line New Customer ATSI-2023-006 · s3130.1 |
Campbellsport Ravenna |
Cost $0.8M In service 04/08/2024 Load 9.6 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 10 |
ATSI Transmission Zone M-3 Process
Napoleon – Campbell Soup 69 kV Line Customer Connection ATSI-2023-007 · s3132.1 |
Campbell Soup Campbell Soup #1 Napoleon |
Cost $0.0M In service 3/31/2024 Load 25 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 12 |
ATSI Transmission Zone M-3 Process
Cloverdale 138 kV Customer Connection ATSI-2023-022 · s3106.1 |
Cloverdale | Cost $0.0 In service 12/1/2025 Load 200 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 14 |
ATSI Transmission Zone M-3 Process
Masury 138 kV Misoperation Relays ATSI-2023-019 · s3118.1 |
Lincoln Park Masury |
Cost $3.4M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 18 |
ATSI Transmission Zone M-3 Process
Gilchrist - Hartville 69 kV Misoperation Relays ATSI-2023-020 · s3119.1 |
Gilchrist Hartville |
Cost $1.6M In service 6/1/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 22 |
ATSI Transmission Zone M-3 Process
Vulcan 138/69 kV Transformer ATSI-2023-023 · s3120.1 |
Vulcan | Cost $1.0M In service 3/28/2024 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 24 |
ATSI Transmission Zone M-3 Process
Carlisle – Johnson 138 kV Misoperation Relays ATSI-2023-029 · s3121.1 |
Carlisle Fieldstone Johnson |
Cost $2.2M In service 6/30/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 28 |
ATSI Transmission Zone M-3 Process
Firestone – Urban 138 kV Misoperation Relays ATSI-2023-041 · s3122.1 |
Firestone Urban Substation |
Cost $2.5M In service 5/15/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 32 |
ATSI Transmission Zone M-3 Process
Henrietta – Johnson 69 kV ATSI-2020-044 · s3192.1 |
Henrietta Johnson South Amherst |
Cost $18M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 35 |
ATSI Transmission Zone M-3 Process
Newton Falls 69 kV Breaker ATSI-2023-027 · s3193.1 |
Newton Falls | Cost $1.0M In service 02/02/2024 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 38 |
AMPT Projects in ATSI Transmission Zone M3 Process
Pioneer, OH AMPT-2022-002 |
E Fayette Kexon Pioneer Snyder Stryker |
Cost $12.6 M In service 5/31/2027 Load 8 MW |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 40 |
ATSI Transmission Zone M-3 Process
Midway – Richland – Wauseon 138 kV Line ATSI-2020-028 · s3370.1 |
Midway Richland Wauseon |
Cost $44 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 42 |
ATSI Transmission Zone M-3 Process
Napoleon – Richland – Stryker 138 kV Line ATSI-2020-029 · s3371.1 |
Napoleon Richland Stryker Sullivan |
Cost $12 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 44 |
ATSI Transmission Zone M-3 Process
Dilworth – Maysville 69 kV Line ATSI-2020-032 · s3372.1 |
Andover Dilworth Maysville |
Cost $25.2 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 46 |
ATSI Transmission Zone M-3 Process
Gilchrist – Star 69 kV Line ATSI-2022-028 · s3359.1 |
Gilchrist Star |
Cost $62.5 M In service 12/1/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 49 |
ATSI Transmission Zone M-3 Process
Galion 138 kV Breakers ATSI-2023-036 · s3360.1 |
Galion | Cost $5.8M In service 08/08/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 52 |
ATSI Transmission Zone M-3 Process
Dowling 138 kV Customer Connection ATSI-2023-044 · s3361.1 |
Dowling | Cost $10.3M In service 11/30/2025 Load 220 MW |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 54 |
ATSI Transmission Zone M-3 Process
Niles Central – Packard 138 kV Line ATSI-2024-002 · s3362.1 |
Cortland Niles Central Packard |
Cost $12.6M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 56 |
ATSI Transmission Zone M-3 Process
Darrow – Hudson East 138 kV Misoperation Relays ATSI-2024-004 · s3373.1 |
Darrow Hudson East |
Cost $ 1.9 M In service 5/15/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 59 |
ATSI Transmission Zone M-3 Process
Abbe – Medina 69 kV Line Customer Connection ATSI-2024-005 · s3363.1 |
Abbe Medina |
Cost $0.0M In service 6/1/2024 Load 3.1 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 61 |
ATSI Transmission Zone M-3 Process
Maysville – McDowell 69 kV Line ATSI-2020-031 · s3494.1 |
Greenville Hartstown Maysville McDowell Werner |
Cost $55.3 M In service 7/25/2028 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 64 |
ATSI Transmission Zone M-3 Process
Cascade (Cedar Street) 69 kV Line ATSI-2022-001 · s3495.1 |
Cascade Cedar Street |
Cost $34.7 M In service 3/31/2028 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 67 |
ATSI Transmission Zone M-3 Process
West Unity (Stryker) 69 kV Line ATSI-2022-006 · s3496.1 |
Stryker West Unity |
Cost $18.1M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 69 |
ATSI Transmission Zone M-3 Process
West Lorain Plant Separation ATSI-2022-012 · s3497.1 |
Beaver West Lorain |
Cost $3.56M In service 12/1/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 72 |
ATSI Transmission Zone M-3 Process
Milton – Newton Falls 69 kV Line ATSI-2022-027 · s3467.1 |
Milton Newton Falls |
Cost $45.92 M In service 12/29/2028 Load 44.65 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 74 |
ATSI Transmission Zone M-3 Process
Cloverdale – Dale No. 2 69 kV Line ATSI-2023-012 · s3498.1 |
Cloverdale Dale Tiger |
Cost $5.4M In service 6/19/2028 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 76 |
ATSI Transmission Zone M-3 Process
Misoperation Relays Projects ATSI-2024-008 · s3468.1 |
Angola Midway |
Cost $3.42 M In service 04/01/2029 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 79 |
ATSI Transmission Zone M-3 Process
Cloverdale – Dale No. 2 69 kV Line Customer Connection ATSI-2024-023 · s3453.1 |
Cloverdale Dale |
Cost $0.63 M In service 2/7/2025 Load 21 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 81 |
ATSI Transmission Zone M-3 Process
Galion – Roberts North 138 kV Line and Galion – Roberts South 138 kV Line ATSI-2024-024 · s3469.1 |
Galion Roberts |
Cost $66.5 M In service 8/27/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 85 |
ATSI Transmission Zone M-3 Process
London – Tangy 138 kV Line Customer Connection ATSI-2024-028 · s3454.1 |
London Tangy |
Cost $0.00 M In service 5/24/2024 Load 30 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 87 |
ATSI Transmission Zone M-3 Process
Lorain, Ohio ATSI-2024-029 · s3455.1 |
Black River Republic Arc Republic Vine |
Cost $0.40 M In service 6/2/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 89 |
ATSI Transmission Zone M-3 Process
Evergreen – Highland No. 3 138 kV Line Customer Connection ATSI-2024-030 · s3456.1 |
Evergreen Substation Highland |
Cost $1.40 M In service 5/1/2025 Load 17 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 91 |
ATSI Transmission Zone M-3 Process
Abbe – Medina 69 kV Line Customer Connection ATSI-2024-036 · s3500.1 |
Abbe Medina |
Cost $0.2M In service 8/29/2025 Load 5 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 93 |
ATSI Transmission Zone M-3 Process
Cloverdale – Harmon 138 kV Line Customer Connection ATSI-2024-041 · s3499.1 |
Cloverdale Harmon |
Cost $0.7M In service 5/31/2026 Load 11 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 95 |
ATSI Transmission Zone M-3 Process
London – Tangy 138 kV Line Customer Connection ATSI-2024-020 · s3521.1 |
London Tangy |
Cost $1.6M In service 6/3/2026 Load 12 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 97 |
ATSI Transmission Zone M-3 Process
Bingham – Cook 69 kV Line Customer Connection ATSI-2024-042 · s3522.1 |
Bingham Cook |
Cost $1.21M In service 12/27/2027 Load 11 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 99 |
ATSI Transmission Zone M-3 Process
Adams - Shinrock 69 kV Line Customer Connection ATSI-2024-043 · s3523.1 |
Adams Shinrock |
Cost $0.15 M In service 10/31/2025 Load 35 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 101 |
ATSI Transmission Zone M-3 Process
East Springfield 138 kV Customer Connection ATSI-2024-044 |
East Springfield London North Titus |
Status Engineering Cost $26.07M In service 11/1/2028 Load 200 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 104 |
ATSI Transmission Zone M-3 Process
Galion – Ontario 138 kV Line Customer Connection ATSI-2024-045 · s3525.1 |
Galion Ontario |
Cost $1.04 M In service 7/14/2025 Load 63 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 106 |
ATSI Transmission Zone M3 Process
Napoleon, OH AMPT-2023-005 · s3352.2 |
Enterprise Substation Midway Napoleon Richland Sullivan 138/69 kV Substation |
Cost $7.1 M In service 10/2/2026 Load 43 MW |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 108 |
ATSI Transmission Zone M-3 Process
Chamberlin 69 kV Breakers ATSI-2023-028 · s3374.1 |
Chamberlin | Status Engineering Cost $4.20M In service 12/31/2024 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Abbe – Medina 69 kV Line Customer Connection - s2056 Scope Change ATSI-2019-056 (s2056) · s2056 |
Abbe Medina |
Cost $0.9 M In service 12/31/2024 Load 11.2 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 6 |
Angola – Midway 138 kV Line ATSI-2022-013 · s3543.1 |
Angola Hawthorne Midway |
Cost $11.6M In service 3/14/2028 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 8 |
Longview – Nottingham 138 kV Line Customer Connection ATSI-2024-039 · s3544.1 |
Longview Nottingham |
Cost $1.5 M In service 12/31/2027 Load 6 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 13 |
Glenmount 138 kV Substation ATSI-2023-009 · s3546.1 |
Dale Firestone Glenmount New Lakemore South Akron Toronto |
Cost $23.54 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 15 |
Cardington (Galion) 138 kV Line Customer Connection ATSI-2024-040 · s3545.1 |
Cardington Galion |
Cost $2.8 M In service 12/31/2027 Load 6 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 17 |
Gilchrist – Star 69 kV Line ATSI-2022-028 (s3359.1) · s3359.1 |
Dale Gilchrist Martin Star |
Cost $71.7 M In service 12/1/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 20 |
Beaver No. 1 345/138 kV Transformer ATSI-2018-004 (s1757) · s1757 |
Beaver West Lorain Generation |
Status Conceptual Engineering Cost 10.0 M In service 4/23/2029 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 24 |
Campbellsport-Ravenna No.1 69 kV Line ATSI-2023-002 · s3576.1 |
Campbellsport Ravenna Sumner Substation |
Cost $6.7 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 26 |
West Chippewa 69 kV Substation s1717 |
Chippewa substation New Castle State Line West Chippewa substation New |
Cost $34 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 28 |
New Departure 345 kV Customer Connection ATSI-2024-056 |
Davis Besse Ford Greenfield Hayes Nasa New Departure |
Cost $99.1 M In service November 28, 2029 Load 540 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 33 |
Avon – Fowles Q1 138 kV Customer ATSI-2024-048 · s3659.1 |
Avon Bentley Fowles |
Cost $0.10M In service 05/14/2026 Load 28 MVA |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 36 |
Ellsworth Substation – s1952 Scope Change ATSI-2019-008 · s1952 |
Berlin Lake Boardman Ellsworth Substation Kimberly Salt Springs Victoria Road |
Cost $36.3M In service 4/30/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 38 |
Brush Wellman – Genoa 69 kV Line ATSI-2019-089 · s3669.1 |
Brush Wellman Genoa |
Cost $32.27M In service 6/1/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 40 |
Bellevue-Groton 69 kV Line ATSI-2023-013 · s3648 |
Bellevue Groton |
Cost $10.1M In service 06/01/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 42 |
Niles – Shenango 345 kV Line ATSI-2024-006 · s3714.1 |
Niles Substation Shenango |
Cost $73.92M In service 12/17/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 44 |
Beaver Valley – Hanna 345 kV Line and Hanna – Mansfield 345 kV Line ATSI-2024-013 · s3715.1 |
Beaver Valley Hanna Mansfield |
Cost $53.35M In service 5/31/2028 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 46 |
Bayshore – Davis Besse 345 kV Line ATSI-2024-019 · s3716.1 |
Bayshore Davis Besse |
Cost $21.12M In service 05/28/2027 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 48 |
Sammis – Star 345 kV Line ATSI-2024-027 · s3717.1 |
Sammis Star |
Cost $343.70M In service 5/30/2031 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 50 |
Campbellsport – Ravenna No. 2 69 kV Line ATSI-2022-029 · s3718.1 |
Campbellsport Ravenna |
Cost $6.77M In service 5/26/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 52 |
Black River – Johnson West 69 kV Line ATSI-2025-011 · s3719.1 |
Black River Johnson West |
Cost $1.66M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 54 |
Gates – Johnson 138 kV Line ATSI-2025-015 · s3720.1 |
Gates Johnson |
Cost $1.96M In service 12/29/2028 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Goodings Grove 345 kV ComEd-2023-004 · s3011 |
Goodings Grove | Status Conceptual Cost $264M In service 12/31/28 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 4 |
345 kV Line 2105 ComEd-2023-007 · s3012 |
Kincaid Pana |
Status Conceptual Cost $149M In service 12/31/26 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 6 |
State Distribution ComEd-2023-006 · s3155 |
State | Status Engineering Cost $2M In service 6/1/24 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 8 |
Wilton Center 345 kV CBs ComEd-2023-010 · s3156 |
Loretto Wilton Center |
Status Engineering Cost $12.7M In service 12/31/24 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 10 |
Des Plaines 345/138 kV Transformer 83 ComEd-2023-011 · s3157 |
Des Plaines | Status Engineering Cost $24.1M In service 12/31/25 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 12 |
Franklin Park L3705 Phase Shifting Transformer ComEd-2023-012 · s3341 |
Franklin Park Natoma |
Status Engineering Cost $11.8M In service 12/31/25 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 14 |
Customer in Dekalb ComEd-2024-001 · s3342.1, s3342.2 |
Keslinger New | Status Conceptual Cost $175M In service 12/31/27 Load 210 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 16 |
Customer in Manteno ComEd-2024-007 · s3343.1, s3343.2 |
None named | Status Phase 1: Engineering
Phase 2: Conceptual Cost $64M In service (Phase 1) 12/31/2024 , (Phase 2) 12/31/2027 Load 113 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 18 |
Oak Park ComEd-2024-008 · s3344 |
Oak Park | Status Engineering Cost $24M In service 12/31/26 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 20 |
138 kV L17904 Disconnect ComEd-2024-009 · s3345 |
Matteson Park Forest |
Status Conceptual Cost $0.5M In service 12/31/25 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 22 |
Libertyville 345 kV ComEd-2024-010 · s3346 |
Libertyville Prospect Hgts. Zion |
Status Conceptual Cost $35M In service 12/31/27 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 24 |
Natoma ComEd-2024-011 · s3347 |
Natoma | Status Conceptual Cost $22M In service 12/31/25 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 26 |
South Pecatonica ComEd-2024-012 · s3348 |
ESSB-427 Fordham Freeport Lancaster Pierpont S Pecatonica Sabrooke |
Status Conceptual Cost $38.5M In service 12/31/26 Load 13 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2024 RTEP p. 28 |
Customer in Belvidere ComEd-2024-006 · s3392.1 |
None named | Status Engineering Cost $0M In service 12/31/26 Load 42 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Customer in Hoffman Estates ComEd-2024-005 · s3578.1 |
Tollway | Status Engineering Cost $3M In service 12/31/26 Load 324 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Customer in Elk Grove ComEd-2023-005 · s3579.1 |
TSS Elk Grove | Status Engineering Cost $130.9M In service 8/30/26 Load 270 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 6 |
Elmhurst ComEd-2024-013 · s3580.1, s3580.2 |
Elmhurst | Status Engineering Cost $6M In service Phase 1: 8/1/2025, Phase 2: 6/1/2027 Load 103 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 8 |
Customer in Itasca ComEd-2023-009 · s3581.1 |
Itasca | Status Engineering Cost $9.9M In service 12/1/26 Load 272.7 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 10 |
Customer in Elk Grove ComEd-2023-008 · s3582.1, s3582.2 |
Des Plaines Elk Grove Lombard Schaumburg |
Status Engineering Cost $158M In service 12/31/2026 (s3582.1), 12/31/2026 (s3582.2) Load 378 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 13 |
Customer in Elk Grove ComEd-2024-004 · s3583.1, s3583.2 |
Elk Grove East Itasca |
Status Engineering Cost $40.6M In service 12/31/2026 (s3583.1), 12/31/2027 (s3583.2) Load 260 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 15 |
Customer in Elk Grove ComEd-2024-003 · s3584.1, s3584.2 |
Dierking Elk Grove East Itasca Pine |
Status Conceptual Cost $289.4M In service 12/31/2027 (s3584.1), 12/31/2028 (s3584.2) Load 250 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 18 |
Burnham 345kV BT1-2 CB ComEd-2024-018 · s3585.1 |
Burnham Sheffield |
Status In Service Cost $2.1M In service 12/31/24 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 20 |
Burnham 345kV BT2-13 CB ComEd-2024-019 · s3586.1 |
Bloom Burnham |
Status Engineering Cost $2.1M In service 12/31/25 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 22 |
Burnham 345kV BT12-13 CB ComEd-2024-020 · s3587.1 |
Burnham Davis Creek State Line |
Status Engineering Cost $2.1M In service 12/31/26 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 24 |
Customer in Aurora ComEd-2024-002 · s3592.1 |
Electric Junction | Status Engineering Cost $0M In service 12/31/26 Load 130 MW |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 26 |
Dresden 345kV BT4-8 CB ComEd-2024-017 · s3725.1 |
Dresden | Status Engineering Cost $2.7M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 28 |
Devon Hardening ComEd-2025-003 · s3726.1 |
Devon Northwest Rosehill Skokie |
Status Engineering Cost $ 18.9 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 30 |
138 kV L10301 Wave Trap at Lombard ComEd-2025-001 · s3727.1 |
Lisle Lombard |
Status In-Service (In service) Cost $ 0.15 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 32 |
138 kV L10302 Wave Trap at Lombard ComEd-2025-002 · s3728.1 |
Lisle Lombard |
Status Conceptual Cost $ 0.15 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Western Dayton local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Dayton Transmission Zone M-3 Process Dayton-2021-002 · S3448.1-.3 |
Eaker Substation Midtown Substation New Tait |
Status Conceptual Cost $16.9M In service 12/31/2028 |
| 2026-09-08* | SRRTEP Western Dayton local plan submission of the supplemental projects for 2024 RTEP p. 4 |
Dayton Transmission Zone M-3 Process
Southeast Dayton Zone Dayton-2021-005 · S3450.1-.7 |
Air Park Air Park 69kVSubstation Airpark Caesars Creek Clinton Columbus Street New Sabina Washington CH Webb Road Wilmington |
Status Conceptual Cost $120.5M In service 12/1/2030 Load 35MW |
| 2026-09-08* | SRRTEP Western Dayton local plan submission of the supplemental projects for 2024 RTEP p. 7 |
Dayton Transmission Zone M-3 Process
Fort Recovery, Ohio – Mercer County Dayton-2022-005 · S3375.1-.3 |
Coldwater Fort Recovery Ft. Recovery Macedon Macedon 69kV Ring Bus New Macedon Delivery Point Marathon Marathon Delivery Point Mt. Zion |
Status Conceptual Cost $50.6 M In service 12/31/2027 |
| 2026-09-08* | SRRTEP Western Dayton local plan submission of the supplemental projects for 2024 RTEP p. 9 |
Dayton Transmission Zone M-3 Process
Auglaize County, Ohio Dayton-2021-007 · S3376.1-.3 |
Amsterdam Franklin McCartyville New Kettlersville Substation New Roberts Road Delivery Point New Sidney |
Status Conceptual Cost $10.36M In service 12/31/2028 |
| 2026-09-08* | SRRTEP Western Dayton local plan submission of the supplemental projects for 2024 RTEP p. 11 |
Joint AMPT/Dayton Project - Dayton Transmission Zone M-3 Process
Tipp City, Ohio AMPT-2023-003 & Dayton-2023-004 · s3351.1 (AMPT); s3351.2 (AES) |
Miami Peters Road |
Status Conceptual (AMPT), Conceptual (AES Ohio) Load 40MW |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Woodsdale DEOK-2021-002 · s3447.1 |
Woodsdale | Status Engineering Cost $7,769,972 In service 11/12/2027 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 4 |
Port Union DEOK-2022-006 · s3380.1 |
Port Union | Status Engineering Cost $37,218,235 In service 06/13/2033 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 6 |
Carlisle DEOK-2022-008 · s3381.1 |
Carlisle | Status Engineering Cost $10,239,263 In service 04/06/2027 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 8 |
Mitchell DEOK-2023-003 · s3377.1 |
Mitchell | Status Engineering Cost $1,870,984 In service 12/4/2025 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 10 |
Foster DEOK-2023-005 · s3379.1 |
Foster | Status Engineering Cost $4,980,000 In service 04/28/2025 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 12 |
Merrel DEOK-2023-006 · s3378.1 |
Merrel | Status Engineering Cost $2,553,102 In service 04/23/2027 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 14 |
Dayton Technologies, Worthington Steel DEOK-2023-007 · s3382.1 |
Dayton Technologies Monroe Shaker Run Todhunter Worthington Steel |
Status Engineering Cost $5,733,438 In service 08/28/2026 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 16 |
Existing Customer New Substation DEOK-2023-008 · s3443.1 |
Red Lion | Status Engineering Cost $499,100 In service 02/23/2026 Load 15 MW |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 18 |
Millville - Layhigh DEOK-2024-001 · s3386.1 |
Colerain Layhigh Millville Oxford Reily Ross Stillwell-Beckett |
Status Engineering Cost $8,496,341 In service 05/06/2026 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 20 |
Evendale DEOK-2024-002 · s3444.1 |
Evendale Kemper Port Union |
Status Engineering Cost $3,064,034 In service 11/19/2026 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2025 RTEP p. 3 |
Miami Fort – Clifty Creek DEOK-2023-001 · s3598.1 |
Clifty Creek Miami Fort |
Status Engineering Cost $39.0 MM In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2025 RTEP p. 5 |
Markley DEOK-2024-003 · s3599.1 |
Markley | Status Engineering Cost $1,080,019 In service 12/11/2026 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2025 RTEP p. 7 |
Turfway DEOK-2024-004 · s3600.1 |
Aero Constance Donaldson Limaburg Oakbrook Turfway New Woodspoint |
Status Scoping (Conceptual) Cost $13M In service 07/25/2029 |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2025 RTEP p. 9 |
Trenton Load Request DEOK-2024-006 · s3601.1 |
Woodsdale | Status Scoping (Conceptual) Cost $36.2M In service 03/01/2026 Load 500 MW |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2024 RTEP p. 2 |
DLCO Transmission Zone M-3 Process
Pittsburgh, PA DLC-2023-002 · S3356.1 |
Brunot Island Forbes Veterans Bridge Substation New |
Status Planning (Conceptual) Cost $0 In service 1/31/2026 Load 20 MW |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2024 RTEP p. 4 |
DLCO Transmission Zone M-3 Process
Pittsburgh, PA DLC-2024-001 · S3367.1 |
Brunot Island | Status Planning (Conceptual) Cost $8 M In service June 2025 |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2024 RTEP p. 6 |
DLCO Transmission Zone M-3 Process
West Mifflin, PA DLC-2024-002 · S3466.1 |
Dravosburg Substation | Status Planning (Conceptual) Cost $8.5 M In service 1st Transformer June 2025, 2nd transformer December 2027 |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Carson Substation Breakers DLC-2025-001 · s3650 |
Carson Substation | Status Planning (Conceptual) Cost $1.6 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Dravosburg Substation Breaker DLC-2025-002 · s3651 |
Dravosburg Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2025 RTEP p. 6 |
Findlay Substation Breaker DLC-2025-003 · s3652 |
Findlay Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2025 RTEP p. 8 |
Neville Substation Breaker DLC-2025-004 · s3649 |
Neville Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Fayette-Baker Lane EKPC-2023-004 · s3164.0 |
Baker Lane Fayette Holloway Nicholasville South Jessamine |
Status Under Construction Cost $17.5M In service 12/2025 – 12/2029 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 4 |
North Lebanon EKPC-2023-005 · s3165.0 |
Green County Marion County |
Status In-Service (In service) Cost $9.46K In service 7/23/2024 Load 18 MW |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 6 |
Gordon Lane EKPC-2023-006 · s3166.0 |
Shelby County | Status Engineering Cost $0.0M In service 5/27/2025 Load 9 MW |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 8 |
Clay Village-New Castle EKPC-2023-008 · s3167.0 |
Clay Village New Castle |
Status Under Construction Cost $10.77M In service 5/1/2025 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 10 |
Big Hill EKPC-2023-010 · s3168.0 |
Big Hill New Fawkes Hickory Plains Sand Gap Three Link West Berea |
Status Engineering Cost $0.0M In service 11/1/2025 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 12 |
North Springfield-Loretto EKPC-2023-011 · s3169.0 |
KU Springfield Loretto Marion County North Springfield S Springfield Springfield KU |
Status Under Construction Cost $12.97M In service 8/1/2025 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 14 |
Snow Tap-North Albany EKPC-2023-012 · s3170.0 |
Albany North Albany Snow Snow Tap South Albany Upchurch |
Status Engineering Cost $4.6M In service 6/1/2026 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 16 |
West Shepherdsville EKPC-2023-013 · s3171.0 |
Brooks Brooks South New Bullitt County Cedar Grove Industrial Nelson County Shepherdsville West Shepherdsville New |
Status Engineering Cost $0.0M In service 12/23/2025 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 18 |
Metts Dr EKPC-2023-014 · s3172.0 |
Green County KU Lebanon South Lebanon Marion County Metts Drive New South Marion County Industrial Taylor County |
Status Engineering Cost $2.95M In service 7/1/2025 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 20 |
KU Fawkes-West Berea EKPC-2023-015 · s3173.0 |
Crooksville Duncannon Lane Fawkes Madison County New Speedwell Union City West Berea |
Status Engineering Cost $15.5M In service 5/5/2027 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 22 |
Stephensburg-Bonnieville EKPC-2023-017 · s3174.0 |
Bonnieville Bonnieville KU Stephensburg |
Status Engineering Cost $12.4M In service 3/1/2027 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 24 |
Green County/Coburg Junction Area EKPC-2023-018 · s3175.0 |
Bass Campbellsville Coburg Coburg Junction New East Campbellsville Green County Heartland Summer Shade Taylor County |
Status Scoping (Conceptual) Cost $22.1M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 26 |
Elizabethtown-Central Hardin-Stephensburg EKPC-2023-019 · s3176.0 |
Central Hardin Elizabethtown Rineyville Stephensburg Vertree |
Status Scoping (Conceptual) Cost $10.7M In service 8/1/2028 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 28 |
Elizabethtown-Patriot Parkway-Vine Grove EKPC-2023-020 · s3177.0 |
Elizabethtown Patriot Parkway Radcliff Rineyville Rogersville Junction Vine Grove |
Status Scoping (Conceptual) Cost $5.2M In service 8/1/2027 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 30 |
Penn-Renaker EKPC-2023-021 · s3178.0 |
Avon Lees Lick Penn Renaker |
Status Engineering & Procurement Cost $16.4M In service 12/1/2027 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2024 RTEP p. 32 |
Windsor-Somerset EKPC-2023-022 · s3179.0 |
Nancy Oak Hill New Pulaski Co. Junction New Somerset Windsor Zollicofer |
Status Engineering Cost $17.0M In service 12/1/2027 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Zachariah, KY EKPC-2024-001 · s3689.1 |
Bowen High Rock Powell County Zachariah |
Status Engineering Cost $16.56 M In service 12/31/2029 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Munfordville, KY EKPC-2024-002 · s3690.1-.3 |
Bonnieville Cub Run New Munfordville |
Status Engineering Cost $1.579 M In service 12/31/2026 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2025 RTEP p. 6 |
Cooper, KY EKPC-2024-004 · s3692.1 |
Cooper | Status Engineering Cost $0.656 M In service 06/01/2026 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2025 RTEP p. 8 |
Dale Station 69 & 138 kV Substation EKPC-2024-003 |
Dale Newby |
Status Engineering Cost $8.8M In service 6/1/2029 |
| 2026-09-08* | SRRTEP Western EKPC local plan submission of the supplemental projects for 2025 RTEP p. 10 |
Dale – Newby 69 KV EKPC-2022-004 · s2873 |
Crooksville Dale EK Fawkes Fawkes Lancaster Newby Toddville West Berea |
Status Engineering Cost $22.9M In service 6/1/2029 |
| 2026-09-08* | SRRTEP Western WVPA local plan submission of the supplemental projects for 2024 RTEP p. 2 |
WVPA M-3 Process as part of AEP Transmission Zone Portland, Indiana WVPA-2022-001 · s3309.1 & s3309.2 |
AEP-Marathon AES-Marathon Berne Burr Oak New Marathon Mt Zion New Portland Salamonia Trinity |
Status Engineering & Planning In service 10/31/2024 Load 14MW |
| 2026-09-08* | SRRTEP Western WVPA local plan submission of the supplemental projects for 2025 RTEP p. 2 |
Elderberry, IN/Stillwell, IN WVPA-2025-001 · s3632.1-2 |
Elderberry Substation Stillwell substation |
Cost $0M ($80 M covered by MISO) In service 12/31/2028 |
| 2026-09-08 | TEAC Item 05 - APS Supplemental Projects p. 3 |
New Customer Connection APS-2026-044 |
Sage | In service September 14, 2031 Load 165 MW |
| 2026-09-08 | TEAC Item 05 - APS Supplemental Projects p. 4 |
New Customer Connection APS-2026-057 |
Hatfield Substation | In service September 1, 2033 Load 900 MW |
| 2026-09-08 | TEAC Item 05 - APS Supplemental Projects p. 6 |
New Customer Connection APS-2026-039 |
Doubs Quantum 300 Substation Sage |
Status Conceptual Cost $8.02M In service 04/12/2032 Load 368 MW |
| 2026-09-08 | TEAC Item 05 - APS Supplemental Projects p. 8 |
New Customer Connection APS-2026-041 |
Ballenger Substation Doubs Lime Kiln Quantum 200 Quantum 400 Sage |
Status Conceptual Cost $54.99M In service 11/08/2032 Load 1000 MW |
| 2026-09-08 | TEAC Item 06 - MetEd Supplemental Projects p. 3 |
Portland 230 kV Customer Connection ME-2026-012 |
Portland Substation | In service 01/14/2031 Load 1000 MW |
| 2026-09-08 | TEAC Item 07 - PPL Supplemental Projects p. 3 |
Natalie 500-230kV Substation PPL-2026-0029 |
Catawissa New Columbia Frackville Montour Natalie 230kV Yard New Natalie 500-230kV Substation Nescopeck Sunbury Susquehanna |
Status Project Development (Conceptual) Cost $408 M In service 12/30/2029 Load 2,000 MW |
| 2026-09-08 | TEAC Item 07 - PPL Supplemental Projects p. 8 |
Bressler 230kV Switchyard PPL-2026-0037 |
Bressler 230kV Switchyard New Brunner Island Copperstone Highspire Hummelstown Middletown Jnc Steelton West Shore Williams Grove |
Status Project Development (Conceptual) Cost $169 M In service 03/31/2029 Load 900 MW |
| 2026-09-08 | TEAC Item 08 - DEOK Supplemental Projects p. 3 |
Customer Load Request DEOK-2025-003 |
Beckett Cotton Run New Miami Fort Millikin Morgan Port Union Todhunter Wayne-Madison New West Milton Willey Woodsdale |
Load 800 MW |
| 2026-09-08 | TEAC Item 09 - PSEG Supplemental Projects p. 3 |
PSE&G Transmission Zone M-3 Process
Farragut – Hudson Area PSEG-2026-0004 |
None named | No figures printed |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2026-0036 |
CIA Idylwood Reddfield |
Load 60MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 4 |
Operational Flexibility and Efficiency DOM-2026-0037 |
Loudoun New Road |
No figures printed |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 6 |
EOL 230kV Cap Bank Replacements – Various Locations DOM-2026-0016 |
Clifton Greenwich Jefferson Street Lanexa Liberty Newport News Pleasant View Valley |
Status Planning (Conceptual) |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 8 |
Line #298 EOL Rebuild – Farmville to Fork Union DOM-2026-0019 |
Bremo Farmville Fork Union |
Status Planning (Conceptual) Cost $96M In service 07/30/2030 |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 11 |
Flamingo 230kV Delivery - DEV DOM-2024-0058 |
Elmont Flamingo New Short Pump |
Status Canceled (Cancelled) Cost $10M In service 12/31/2029 Load 47.0 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 13 |
Aphrodite 230kV Delivery - NOVEC DOM-2024-0061 |
Aphrodite New Gainesville Loudoun |
Status Canceled (Cancelled) Cost $14M In service 09/30/2027 Load 100 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 15 |
Demeter 230kV Delivery - NOVEC DOM-2024-0062 |
Demeter New Loudoun Old Limb |
Status Canceled (Cancelled) Cost $15.5M In service 05/01/2028 Load 100 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 17 |
Customer Load Request DOM-2024-0067 |
Harlem New | Status Cancelled Load 100MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 18 |
Customer Load Request DOM-2025-0050 |
Artemis New | Status Cancelled Load 300 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 19 |
Customer Load Request DOM-2025-0055 |
Hera New | Status Cancelled Load 300 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 20 |
Customer Load Request DOM-2025-0057 |
Nero New | Status Cancelled Load 300 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 21 |
Customer Load Request DOM-2025-0068 |
Caesar New | Status Cancelled Load 300 MW |
| 2026-09-08 | TEAC Item 10 - DOM Supplemental Projects p. 22 |
Operational Flexibility and Efficiency DOM-2025-0100 |
Darbytown Northeast Techpark Place |
Status Cancelled |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.