Dravosburg Substation
Named in 6 PJM planning documents for 2 projects, from October 8, 2024 to October 8, 2025.
Existingdescribed as
DLCOzone
138kV, 69 kVkV as printed
6mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| DLCO Transmission Zone M-3 Process
West Mifflin, PA DLC-2024-002 · S3466.1 |
Conceptual | $8.5 M | 1st Transformer June 2025, 2nd transformer December 2027 | Not printed | 2024-10-08 TEAC |
| Dravosburg Substation Breaker DLC-2025-002 · s3651 |
Conceptual | $0.8 M | 12/31/2025 | Not printed | 2025-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2024 RTEP p. 7 |
DLCO Transmission Zone M-3 Process West Mifflin, PA | “Eliminate the 69 kV voltage level from Dravosburg Substation by replacing the two aged 138-69 kV autotransformers” 69 kV |
| 2026-09-08* | SRRTEP Western DLCO local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Dravosburg Substation Breaker | “one
138kV oil circuit breaker at Dravosburg Substation has increased failure
probability” 138kV |
| 2025-10-08 | TEAC Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Dravosburg Substation Breaker | “one
138kV oil circuit breaker at Dravosburg Substation has increased failure
probability” 138kV |
| 2025-03-14 | SRRTEP Western Item 04 - DLCO Supplemental Project p. 5 |
Dravosburg Substation Breaker | “one
138kV oil circuit breaker at Dravosburg Substation has increased failure
probability” 138kV |
| 2025-02-14 | SRRTEP Western Item 02 - DLCO Supplemental Projects p. 3 |
Dravosburg Substation Breaker | “one 138kV oil circuit breaker at Dravosburg Substation has increased failure probability” 138kV |
| 2024-10-08 | TEAC Informational Only - DLCO Local Plan submission of supplemental project 2024 p. 7 |
DLCO Transmission Zone M-3 Process West Mifflin, PA | “Eliminate the 69 kV voltage level from Dravosburg Substation” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.