Substation Scout

Dravosburg Substation

Named in 6 PJM planning documents for 2 projects, from October 8, 2024 to October 8, 2025.

Existingdescribed as
DLCOzone
138kV, 69 kVkV as printed
6mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
DLCO Transmission Zone M-3 Process West Mifflin, PA
DLC-2024-002 · S3466.1
Conceptual $8.5 M 1st Transformer June 2025, 2nd transformer December 2027 Not printed 2024-10-08
TEAC
Dravosburg Substation Breaker
DLC-2025-002 · s3651
Conceptual $0.8 M 12/31/2025 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
DLCO local plan submission of the supplemental projects for 2024 RTEP p. 7
DLCO Transmission Zone M-3 Process West Mifflin, PA “Eliminate the 69 kV voltage level from Dravosburg Substation by replacing the two aged 138-69 kV autotransformers”
69 kV
2026-09-08* SRRTEP Western
DLCO local plan submission of the supplemental projects for 2025 RTEP p. 4
Dravosburg Substation Breaker “one 138kV oil circuit breaker at Dravosburg Substation has increased failure probability”
138kV
2025-10-08 TEAC
Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 p. 4
Dravosburg Substation Breaker “one 138kV oil circuit breaker at Dravosburg Substation has increased failure probability”
138kV
2025-03-14 SRRTEP Western
Item 04 - DLCO Supplemental Project p. 5
Dravosburg Substation Breaker “one 138kV oil circuit breaker at Dravosburg Substation has increased failure probability”
138kV
2025-02-14 SRRTEP Western
Item 02 - DLCO Supplemental Projects p. 3
Dravosburg Substation Breaker “one 138kV oil circuit breaker at Dravosburg Substation has increased failure probability”
138kV
2024-10-08 TEAC
Informational Only - DLCO Local Plan submission of supplemental project 2024 p. 7
DLCO Transmission Zone M-3 Process West Mifflin, PA “Eliminate the 69 kV voltage level from Dravosburg Substation”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.