Named in 4 PJM planning documents for 3 projects, from November 15, 2024 to October 8, 2025.
Existingdescribed as
COMEDzone
138/34 kV, 338.25kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Change No Load Taps at 6 stations b3914.1 |
Not printed | $289 K | 4/15/2029 | Not printed | 2024-12-13 SRRTEP Western |
| ComEd Transmission Zone: Baseline Change No Load Taps at 6 stations | Not printed | $289 K | 4/15/2029 | Not printed | 2024-11-15 SRRTEP Western |
| Elmhurst ComEd-2024-013 · s3580.1, s3580.2 |
Engineering | $6M | Phase 1: 8/1/2025, Phase 2: 6/1/2027 | 103 MW | 2025-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 7 |
Elmhurst | “distribution transformers at Elmhurst” 138/34 kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 7 |
Elmhurst | “Install two new 60 MVA, 138/34 kV distribution transformers at Elmhurst” 138/34 kV |
| 2024-12-13 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 10 |
Change No Load Taps at 6 stations | “Change No-load Tap of 3 Autotransformers at Elmhurst” 338.25kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 6 |
ComEd Transmission Zone: Baseline Change No Load Taps at 6 stations | “Change No-load Tap of 3 Autotransformers at Elmhurst” 338.25kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.