Sample reports
Real, unedited Site Scanner reports.
What you are looking at
Every file on this page came out of the Site Scanner exactly as shipped. No figure was edited. Where a dataset has nothing to say about a site, the report says so.
A report is a screening aid. It tells you what public infrastructure data records near a point so you can rule sites out cheaply, before spending money on engineering due diligence. It is not a system impact study, it does not establish that power is available, and it never estimates a figure it cannot source.
Featured demo address
12906 OLD STAGE RD, CHESTER, VA, 23836
- 8 nearest substations listed
- 6 of 6 fields resolved
- 2 interconnection queue blocks · 5 of 8 substations checked
- 1 PJM transmission planning entry for nearby substations
- 9 planned new substations listed for the area, the nearest placed one 5 mi away, in Appendix C
- 0 local moratoria recorded for the site's jurisdictions
- Large-load tariff on file: Rate Schedule GS-5 (approved), in Appendix D
- 2.09 mi to the nearest mapped gas transmission pipeline (interstate)
Generated 2026-11-22
The Project Kirkland series
These 41 reports came from a published screening exercise: invent plausible site criteria, apply them to every Costco warehouse in the lower 48, and publish whatever the data returned.
Of 617 warehouses, 41 cleared the screen: outside a FEMA Special Flood Hazard Area, a 230 kV or higher substation within two miles, and a mapped natural gas pipeline within one mile. All 41 reports were regenerated on November 22, 2026, with the Site Scanner's current data.
16 of these 41 reports carry an interconnection queue appendix: in 4, a queue filing names a nearby substation; in the other 12, the nearby substations were checked and no filing names them. 25 have none, because every nearby substation is either unnamed in the source data or in a county where no ingested queue has filings. 12 were generated from coordinates because the street address did not geocode reliably — the report is for the mapped site either way.
1 of the 41 reports carries an appendix of transmission planning entries, where a planning document names a substation of the same name as one nearby. A name match is not a verified facility, and each entry quotes the document’s own figures with a page reference.
9 of the 41 reports list planned new substations in the site’s area: stations a planning document describes as new that the national substation dataset does not contain yet. 7 of those place at least one with a distance; the rest give the county only, because the source does not publish a location.
13 of the 41 sites sit inside a county, town or city for which a third-party dataset records a local moratorium (9 recorded as active or extended). Recorded is not the same as applicable — an instrument’s scope is set by its own text — so each report’s Appendix B quotes the status as published rather than summarizing it.
41 of the 41 sites have a mapped gas transmission pipeline within a mile, 41 within five miles and every one within 25. Distance is to EIA’s mapped line, which is not a locate, and a pipeline nearby is not gas service. 3 fall outside every mapped gas utility territory; their reports say so rather than guess.
3 of the 41 reports (marked †) carry Appendix D, the serving utility’s filed large-load tariff, quoted term by term from the filing. Only utilities with a tariff record get one, and the records are a small hand-verified set, so a utility without one here may still have a large-load tariff.
| # | Site | Nearest ≥230 kV | Utility | Queue blocks | Local moratoria | Gas pipeline | Report |
|---|---|---|---|---|---|---|---|
| 1 | Rancho Cucamonga, CA | 500 kV (RANCHO VISTA) @ 1.06 mi | SOUTHERN CALIFORNIA EDISON CO | none | none | 0.51 mi | |
| 2 | Tempe, AZ | 500 kV (KYRENE) @ 1.19 mi | CITY OF MESA - (AZ) | checked | none | 0.12 mi | |
| 3 | Pottstown, PA ° | 500 kV (LIMERICK (500KV SUB)) @ 1.32 mi | PECO ENERGY CO | 1 | none | 0.01 mi | |
| 4 | Mt. Juliet, TN ° | 500 kV (WILSON) @ 1.61 mi | MIDDLE TENNESSEE E M C | none | 1 | 0.37 mi | |
| 5 | Victorville, CA | 500 kV (VICTORVILLE) @ 1.94 mi | SOUTHERN CALIFORNIA EDISON CO | none | none | 0.77 mi | |
| 6 | Everett, MA | 345 kV (MYSTIC) @ 0.35 mi | FITCHBURG GAS & ELEC LIGHT CO | none | 1 | 0.16 mi | |
| 7 | Brooklyn, NY | 345 kV (GOWANUS) @ 0.54 mi | CONSOLIDATED EDISON CO-NY INC | none | none | 0.31 mi | |
| 8 | San Antonio, TX ° | 345 kV (CAGNON ROAD) @ 1.11 mi | CITY OF SAN ANTONIO - (TX) | checked | none | 0.71 mi | |
| 9 | Westbury, NY ° | 345 kV (EAST GARDEN CITY) @ 1.16 mi | LONG ISLAND POWER AUTHORITY | none | 1 | 0.3 mi | |
| 10 | Houston, TX | 345 kV (UNKNOWN302970) @ 1.28 mi | CENTERPOINT ENERGY | checked | none | 0.08 mi | |
| 11 | Arlington, TX | 345 kV (UNKNOWN305459) @ 1.68 mi | ONCOR ELECTRIC DELIVERY COMPANY LLC | checked | none | 0.26 mi | |
| 12 | Lewisville, TX ° | 345 kV (NORTHWEST CARROLLTON) @ 1.77 mi | TEXAS-NEW MEXICO POWER CO | checked | none | 0.78 mi | |
| 13 | Avon, MA | 345 kV (STOUGHTON) @ 1.81 mi | MASSACHUSETTS ELECTRIC CO | none | none | 0.37 mi | |
| 14 | Auburn Hills, MI | 345 kV (UNKNOWN128507) @ 1.86 mi | DTE ELECTRIC COMPANY | none | none | 0.83 mi | |
| 15 | Richmond, TX ° | 345 kV (O'BRIEN) @ 1.9 mi | CENTERPOINT ENERGY | 1 | none | 0.06 mi | |
| 16 | Hawthorne, CA | 230 kV (EL NIDO) @ 0.27 mi | SOUTHERN CALIFORNIA EDISON CO | none | 1 | 0.31 mi | |
| 17 | Bridgewater, NJ ° | 230 kV (UNKNOWN132377) @ 0.37 mi | PUBLIC SERVICE ELEC & GAS CO | none | none | 0.86 mi | |
| 18 | Vallejo, CA | 230 kV (PARKWAY) @ 0.41 mi | PACIFIC GAS & ELECTRIC CO. | none | 1 | 0.58 mi | |
| 19 | Fremont, CA | 230 kV (NEWARK DISTRIBUTION) @ 0.48 mi | PACIFIC GAS & ELECTRIC CO. | none | none | 0.25 mi | |
| 20 | Lafayette, LA ° | 230 kV (FLANDERS) @ 0.48 mi | ENTERGY LOUISIANA LLC | checked | none | 0.47 mi | |
| 21 | San Diego, CA | 230 kV (MISSION) @ 0.51 mi | SAN DIEGO GAS & ELECTRIC CO | none | none | 0.88 mi | |
| 22 | Woodbridge, VA | 230 kV (NOVEC SMOKETOWN) @ 0.58 mi | NORTHERN VIRGINIA ELEC COOP | checked | none | 0.27 mi | |
| 23 | Tampa, FL | 230 kV (SHELDON ROAD) @ 0.68 mi | TAMPA ELECTRIC CO | none | 1 | 0.83 mi | |
| 24 | North Wales, PA | 230 kV (HARTMAN) @ 0.91 mi | PECO ENERGY CO | 1 | none | 0.41 mi | |
| 25 | Gypsum, CO ° | 230 kV (COOLEY MESA) @ 0.95 mi | HOLY CROSS ELECTRIC ASSN, INC | none | none | 0.29 mi | |
| 26 | Chantilly, VA | 230 kV (UNKNOWN116835) @ 0.95 mi | VIRGINIA ELECTRIC & POWER CO † | checked | none | 0.63 mi | |
| 27 | Van Nuys, CA | 230 kV (UNKNOWN304361) @ 1.05 mi | LOS ANGELES DEPARTMENT OF WATER & POWER | none | 1 | 0.51 mi | |
| 28 | Brentwood, CA ° | 230 kV (LONE TREE) @ 1.07 mi | PACIFIC GAS & ELECTRIC CO. | none | none | 0.52 mi | |
| 29 | Waltham, MA | 230 kV (WALTHAM) @ 1.14 mi | FITCHBURG GAS & ELEC LIGHT CO | none | none | 0.64 mi | |
| 30 | Eugene, OR | 230 kV (MCKENZIE) @ 1.19 mi | EMERALD PEOPLE'S UTILITY DIST | checked | none | 0.82 mi | |
| 31 | Marina del Rey, CA | 230 kV (TAHITI) @ 1.21 mi | SOUTHERN CALIFORNIA EDISON CO | none | 1 | 0.41 mi | |
| 32 | Fairfield, CA | 230 kV (DEADEND307623) @ 1.31 mi | PACIFIC GAS & ELECTRIC CO. | none | 1 | 0.63 mi | |
| 33 | Gilbert, AZ ° | 230 kV (CORBELL) @ 1.4 mi | CITY OF MESA - (AZ) | checked | none | 0.67 mi | |
| 34 | Richmond, VA ° | 230 kV (TRABUE) @ 1.4 mi | VIRGINIA ELECTRIC & POWER CO † | 1 | none | 1 mi | |
| 35 | Las Vegas, NV | 230 kV (BELTWAY) @ 1.46 mi | NEVADA POWER CO | none | none | 0.21 mi | |
| 36 | Leesburg, VA | 230 kV (TAP139243) @ 1.5 mi | VIRGINIA ELECTRIC & POWER CO † | checked | 1 | 0.7 mi | |
| 37 | Denver, CO | 230 kV (CHAMBERS) @ 1.53 mi | PUBLIC SERVICE CO OF COLORADO | none | 1 | 0.25 mi | |
| 38 | Bradenton, FL | 230 kV (UNKNOWN120645) @ 1.6 mi | FLORIDA POWER & LIGHT CO | checked | 1 | 0.05 mi | |
| 39 | Hayward, CA | 230 kV (EASTSHORE) @ 1.62 mi | PACIFIC GAS & ELECTRIC CO. | none | none | 0.93 mi | |
| 40 | Brandon, FL | 230 kV (STATE ROUTE 60) @ 1.67 mi | TAMPA ELECTRIC CO | none | 1 | 0.93 mi | |
| 41 | Colorado Springs, CO | 230 kV (UNKNOWN202239) @ 1.7 mi | CITY OF COLORADO SPRINGS - (CO) | none | none | 0.63 mi |
° generated from coordinates rather than a street address. † the report carries the utility’s filed large-load tariff (Appendix D).
Covington, WA
27520 COVINGTON WAY SE, COVINGTON, WA, 98042
This one is not among the 41. Covington was the winner of the first version of the series, which used a 345 kV floor and no gas screen. It sits 0.54 miles from a 500 kV substation, the shortest distance to 500 kV of all 617 Costcos, and it missed the one-mile gas screen. The series measured 1.27 miles to the nearest mapped pipeline from the store's mapped location; this report, generated from the street address, puts it at 1.29.
- 8 nearest substations listed
- 6 of 6 fields resolved
- 0 interconnection queue blocks · 2 of 8 substations checked
- 0 PJM transmission planning entries for nearby substations
- 1 local moratorium recorded for the site's jurisdictions
- 1.29 mi to the nearest mapped gas transmission pipeline (interstate)
Generated 2026-11-22