Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
JCPLzone
230 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays
JCPL-2023-048 · s3255.1
Not printed $4.1M 05/30/2025 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FRENEAU; PARLIN SUBSTATIONS; WILLIAMS GAS → FRENEAU; PARLIN; WILLIAMS GAS 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 25
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays “Replace relaying and limiting substation conductor at Freneau, Williams Gas and Parlin substations”
230 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 25
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays “Replace relaying and limiting substation conductor at Freneau, Williams Gas and Parlin substations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.