Mentions: December 2025
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-12-12 | SRRTEP Western Item 12 - DEOK Supplemental Projects p. 3 |
New Customer Load Request DEOK-2025-006 |
None named | Load 240 MW |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 3 |
Collins Park – Ryan 69 kV ATSI-2025-037 |
Collins Park West Ryan Substation |
No figures printed |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 4 |
Rockaway Substation 69 kV ATSI-2025-038 |
OS Kelly Rockaway Substation Springfield Medical |
No figures printed |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 5 |
Chrysler Substation 138 kV ATSI-2025-039 |
Chrysler Substation First Solar Shelby |
No figures printed |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 7 |
Newton Falls 138/69 kV Substation ATSI-2022-031 |
Bridge Evergreen Substation Franklin GM Lordstown Hanna Ivanhoe Newton Falls Newton Falls 138/69 kV Substation Ohio Star Forge Whitman Station New |
Status Conceptual Cost $51.52M In service 12/21/2028 |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 9 |
Multiple Line Rehab/Rebuild ATSI-2019-059 |
Department of Corrections Dept. of Corrections McDowell Mercer Mercer Forge Mercer Tap Reznor Tap Reznor Thomas Sharon |
Status Conceptual Cost $63.7M In service 12/31/2030 |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 11 |
New Customer Connection ATSI-2025-033 |
London Tangy |
Status Conceptual Cost $3.72M In service 06/01/2027 |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 13 |
New Customer Connection ATSI-2025-034 |
Nottingham Yager Substation |
Status Conceptual Cost $2.32M In service 04/19/2029 |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 15 |
New Wholesale Connection ATSI-2025-030 |
Clark North Hampton Substation |
Status Conceptual Cost $2.25M In service 06/01/2028 |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 17 |
Black River - Willow Creek 69 kV ATSI-2025-035 |
Black River Willow Creek |
Status Conceptual Cost $1.53M In service 12/31/2026 |
| 2025-12-12 | SRRTEP Western Item 14 - APS Supplemental Projects p. 3 |
Grand Point – Roxbury 138 kV APS-2024-028 |
Grand Point Greene Substation Letterkenny Substation Roxbury Substation |
Status Conceptual Cost $28.34M In service 06/15/2029 |
| 2025-12-12 | SRRTEP Western Item 14 - APS Supplemental Projects p. 6 |
Junction – Parr Run 138 kV APS-2024-096 |
Junction Substation Kelso Gap Parr Run |
Status Conceptual Cost $35M In service 06/16/2028 |
| 2025-12-12 | SRRTEP Western Item 14 - APS Supplemental Projects p. 9 |
Page-Riverton 138 kV New Customer APS-2023-014 · s3127.1 |
Catlett Mountain New Page Riverton |
Status Project Initiation (Cancelled) Cost $16M In service 05/30/2025 |
| 2025-12-12 | SRRTEP Western Item 15 - AEP Supplemental Projects p. 3 |
Jennings Road Switch, OH/Sharp Road, OH/Commerce, OH AEP-2024-OH028 |
Commerce Jennings Road Switch Sharp Rd Sharp Road |
Status Scoping (Conceptual) Cost $2.575 M In service 08/04/2027 Load 12.031 MW |
| 2025-12-12 | SRRTEP Western Item 16 - SRRTEP West - Reliability Analysis Update p. 3 |
Mendota-Sandwich 138 kV b4025.1 |
Haumesser Mendota Sandwich Steward Waterman |
Cost $171.88 M In service 4/15/2030 |
| 2025-12-12 | SRRTEP Western Item 16 - SRRTEP West - Reliability Analysis Update p. 5 |
Mound Street-St Clair Avenue 138kV Line Rebuild b4028.1 |
Mound Street Saint Clair St Clair Avenue |
Cost $41.586M In service 04/01/2030 |
| 2025-12-12 | SRRTEP Western Item 16 - SRRTEP West - Reliability Analysis Update p. 8 |
b4000.209 Cancellation b4000.209 |
Altavista Otter |
Status Cancelled Cost $1.2 M In service 6/1/2029 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 3 |
Montville, NJ/Riverdale Substation, NJ JCPL-2025-007 |
Montville Riverdale |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 4 |
Allenhurst Substation, NJ JCPL-2025-008 |
Allenhurst Substation Oceanview |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 5 |
New Providence Substation, NJ JCPL-2025-009 |
Air Reduction CSC H Tap New Providence |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 6 |
Morris Court Substation, NJ JCPL-2025-011 |
Morris Court Substation | In service 9/14/2026 Load 10 MW |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 7 |
Manitou, NJ JCPL-2025-012 |
Manitou Ocean Beach Ortley Beach Seaside Park |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 9 |
Martinsville, NJ JCPL-2025-010 |
Martinsville Readington |
Status Conceptual Cost $1.08M In service 06/01/2027 Load 10 MW |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 3 |
Fairview, NJ ME-2025-003 |
Fairview Gitts Run |
Load 41 MW |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 5 |
Carpenter Technology Substation 69kV Circuit Breaker ME-2024-021 |
Carpenter Technology Substation Riverview |
Status Conceptual Cost $1.01M In service 06/15/2027 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 7 |
Cleona – Campbelltown 69kV Line ME-2023-009 |
Annville Campbelltown Substation Cleona Hershey Beta Tap Middletown Jct. Mill St. Millards Quarry N. Hershey North Lebanon |
Status Conceptual Cost $32.33M In service 06/01/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 10 - PENELEC Supplemental Projects p. 3 |
Bethlehem, PA PN-2025-009 |
Bethlehem Ebensburg Nanty Glo Revloc |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 10 - PENELEC Supplemental Projects p. 5 |
Grand Point – Roxbury 138kV Line PN-2024-012 |
Grand Point Greene Letterkenny Roxbury |
Status Conceptual Cost $17.94M In service 06/15/2029 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 10 - PENELEC Supplemental Projects p. 7 |
Glory – Nanty Glo – Spangler 46 kV Line PN-2024-022 |
Bobik Lane New Glory Moss Creek Nanty Glo Nicktown Spangler Strongstown Teakettle |
Status Conceptual Cost $13.81M In service 06/30/2028 Load 11 MW |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 3 |
Shillington, PA PPL-2023-0001 |
Shillington Substation | No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 4 |
White Haven, PA PPL-2025-0026 |
White Haven | In service 12/2026 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 5 |
Bear Creek, PA PPL-2025-0027 |
Bear Creek | In service 11/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 6 |
Fountain Springs, PA PPL-2025-0028 |
Fountain Springs | In service 11/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 7 |
Parrish, PA PPL-2025-0029 |
Parrish | In service 11/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 8 |
Mausdale, PA PPL-2025-0030 |
Mausdale New | In service 3/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 10 |
Allentown, PA PPL-2022-0006 |
Sumner | Status Conceptual Cost $24.6M In service 12/1/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 13 |
Derry, PA PPL-2025-0020 |
Derry Washingtonville New |
Status Conceptual Cost $1.25 M In service 05/30/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 15 |
Hughesville, PA PPL-2025-0021 |
Hughesville | Status Conceptual In service 01/30/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 17 |
Coopersburg, PA PPL-2025-0022 |
Center Valley New Coopersburg |
Status Conceptual Cost $1.85 M In service 11/30/2027 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 11 - PPL Supplemental Projects p. 19 |
West Damascus, PA PPL-2025-0025 |
West Damascus | Status Engineering Cost $0.5 M In service 05/26/2027 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 12 - PSEG Supplemental Projects p. 3 |
PSE&G Central Territory PSEG-2025-0008 |
Brunswick Harts Lane |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 12 - PSEG Supplemental Projects p. 4 |
PSE&G Southern Territory PSEG-2025-0009 |
Lawrence | No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 12 - PSEG Supplemental Projects p. 5 |
PSE&G Southern Territory PSEG-2025-0010 |
Lawnside Nicholson |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 12 - PSEG Supplemental Projects p. 7 |
PSE&G Central Territory PSEG-2025-0006 |
Sand Hills | Status Conceptual Cost $25.1M In service 12/31/2027 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 12 - PSEG Supplemental Projects p. 9 |
PSE&G Southern Territory PSEG-2025-0007 |
Gloucester Lawnside |
Status Conceptual Cost $42.8M In service 12/31/2028 |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 13 - DPL Supplemental Projects p. 3 |
DPL-2025-003 | Carrcroft Edgemoor Silverside |
No figures printed |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 14 - ACE Supplemental Projects p. 3 |
ACE-2025-001 | Beckett Churchtown |
Status Engineering Cost $16M In service Phase 1 – 4/28/2026, Phase 2 – 12/2029 Load 40 MW |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 15 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3 |
ODEC Transmission Zone b3134 Cost Update b3134 |
Cheriton S/S New Kellam Kellam S/S |
Status EP Cost $43.4M In service 12/31/2027 |
| 2025-12-11 | SRRTEP Southern Item 02 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2025-0085 |
Central Substation | In service 12/31/2029 |
| 2025-12-11 | SRRTEP Southern Item 02 - DOM Supplemental Projects p. 4 |
Customer Load Request DOM-2025-0090 |
Glasgow substation | In service 05/01/2027 Load 25 MW |
| 2025-12-11 | SRRTEP Southern Item 02 - DOM Supplemental Projects p. 5 |
Customer Load Request DOM-2025-0093 |
Craigsville Substation | In service 12/31/2029 |
| 2025-12-11 | SRRTEP Southern Item 02 - DOM Supplemental Projects p. 6 |
Customer Load Request DOM-2025-0097 |
None named | In service 10/31/2027 Load 20.1 MW |
| 2025-12-11 | SRRTEP Southern Item 02 - DOM Supplemental Projects p. 8 |
Jarratt 115kV Delivery – Upgrade TX#4 and Retire TX#3 - DEV DOM-2025-0076 |
Jarratt Substation | Status Engineering Cost $0.4M In service 6/30/2028 |
| 2025-12-11 | SRRTEP Southern Item 02 - DOM Supplemental Projects p. 10 |
Harmony Village 115 kV Delivery – Upgrade TX#3 - DEV DOM-2025-0077 |
Harmony Village Substation | Status Engineering Cost $1.21M In service 12/15/2026 |
| 2025-12-11 | SRRTEP Southern Item 03 - SRRTEP South - Reliability Analysis Update p. 3 |
DOM Transmission Zone: Baseline
Bremo to Fork Union 115kV b4031.1 |
Bremo Fork Union |
Cost $7M In service 6/1/2030 |
| 2025-12-08 | TEAC Item 04 - ATSI Supplemental Projects p. 3 |
Lemoyne Substation Upgrades for MISO Tranche 2.1 ATSI-2025-004 |
Greenfield Lakeview Lemoyne Ottawa |
Status Conceptual Cost $100.86 M In service 6/1/2032 |
| 2025-12-08 | TEAC Item 04 - ATSI Supplemental Projects p. 6 |
Lallendorf Substation Upgrades for MISO Tranche 2.1 ATSI-2025-005 |
Allen Junction Substation Lallendorf Substation Morocco |
Status Conceptual Cost $7.21 M In service 6/1/2032 |
| 2025-12-08 | TEAC Item 05 - APS Supplemental Projects p. 3 |
Yukon No. 7 500/138 kV Transformer APS-2025-030 |
Yukon | No figures printed |
| 2025-12-08 | TEAC Item 05 - APS Supplemental Projects p. 5 |
Elko No. 1 230/138 kV Transformer APS-2025-012 |
Elko Substation | Status Conceptual Cost $6.69M In service 06/01/2028 |
| 2025-12-08 | TEAC Item 06 - JCPL Supplemental Projects p. 3 |
Glen Gardner No. 1 230-34.5 kV Transformer JCPL-2024-022 |
Glen Gardner | Status Conceptual Cost $ 7.35M In service 11/17/2028 |
| 2025-12-08 | TEAC Item 06 - JCPL Supplemental Projects p. 5 |
Glen Gardner No. 8 230-34.5 kV Transformer JCPL-2024-031 |
Glen Gardner | Status Conceptual Cost $ 7.35M In service 06/07/2028 |
| 2025-12-08 | TEAC Item 06 - JCPL Supplemental Projects p. 7 |
Englishtown No. 6 230-34.5 kV Transformer JCPL-2025-005 |
Englishtown | Status Conceptual Cost $ 2.06M In service 12/17/2026 |
| 2025-12-08 | TEAC Item 07 - PEPCO Supplemental Projects p. 3 |
Burches Hill PEP-2023-023 |
Burches Hill | Status Engineering Cost $3.6M In service 2/12/2027 |
| 2025-12-08 | TEAC Item 08 - BGE Supplemental Projects p. 3 |
BGE-2025-011 | None named | Load 880 MW |
| 2025-12-08 | TEAC Item 09 - ComEd Supplemental Projects p. 3 |
Zion 345 kV CBs ComEd-2025-024 |
Pleasant Prairie Waukegan Zion |
Status Conceptual Cost $ 12.7 M In service 12/31/2027 |
| 2025-12-08 | TEAC Item 09 - ComEd Supplemental Projects p. 5 |
State Line 345 kV CBs ComEd-2025-025 |
State Line | Status Conceptual Cost $4M In service 12/31/2026 |
| 2025-12-08 | TEAC Item 09 - ComEd Supplemental Projects p. 7 |
Des Plaines 345 kV CBs ComEd-2025-026 |
Des Plaines Itasca |
Status Conceptual Cost $3.9M In service 12/31/2027 |
| 2025-12-08 | TEAC Item 10 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0083 |
Cosner New | In service 12/01/2027 Load 300 MW |
| 2025-12-08 | TEAC Item 10 - DOM Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental
Hibie St - New 230 kV Delivery - DEV DOM-2025-0011 |
Hibie St New Reeves Ave Thrasher |
Status Engineering Cost $3.56M In service 12/31/2027 Load 29.8 MW |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 13 |
AEP Transmission Zone: Baseline Cluster AEP-1 b4026.1 |
Auglaize Platter Creek Sherwood |
Cost $28.7M In service 2/28/2030 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 16 |
AEP Transmission Zone: Baseline Cluster AEP-5 b4027.1 |
Moneta Rockcastle Smith Mountain |
Cost $9.879M In service 06/01/2029 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 19 |
Dominion Transmission Zone: Baseline Hopewell – Chesterfield – Basin 230 kV b4030.1 |
Basin Chesterfield Hopewell |
Cost $113.55 M In service 6/1/2030 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 21 |
Dominion Transmission Zone: Baseline 500kV Line #565 Rebuild (End of Life Criteria) b4030.6 |
Septa Suffolk Yadkin |
Cost $74.3 M In service 6/1/2030 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 23 |
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV b4030.9 |
Bremo Charlottesville Fork Union Mt. Eagle Tap |
Cost $127.05 M In service 6/1/2030 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 27 |
PPL Transmission Zone: Baseline MAAC PPL Cluster b4029.1 |
Glen Brook Jenkins Juniata Kelayres New Monroe Montour Sunbury Susquehanna Susquehanna T10 Tomhicken |
Cost $565.4M In service 6/1/2030 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 51 |
MAAC Regional Cluster: Baseline 2025-W1-237 |
Belmont Buttermilk Falls Conemaugh Juniata Kammer Keystone Mountain Stone New Mountaineer South Bend Sunbury |
Cost $1738.6M In service 6/1/2031 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 59 |
PEPCO Transmission Zone: Baseline Exelon/PEPCO Cluster 2025-W1-919 |
Bells Mill Brighton Dickerson New Quince Orchard |
Cost $282.16 M In service 6/1/2031 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 73 |
Dominion Transmission Zone: Baseline Regional Solution: 2025-W1-275 Portfolio 2025-W1-275 |
Carson Chickahominy Cunningham Elmont Heritage New Kraken New Midlothian Mosby North Anna Possum Point Surry Vint Hill Vontay New Yeat |
In service 6/1/2032 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 111 |
West Regional Cluster Solution - Transource/FE Proposal 2025-W1-570 (Modified) 2025-W1-570 |
Adkins New Allen Beatty Bethel Bixby Cole Conesville Fifth Avenue Greentown Guernsey Hayden Hess Hyatt Kenny Kirk Maliszewski Marysville Meadow Lake Newark Center Ohio Central OSU Roberts South Kenton Teddy New West Millersport New Wilson |
In service 10/31/2031 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 119 |
2025W1 – Regional Cluster Preferred Solution: Breaker Upgrades | Celestial Sub Clifton Sub Elmont Huntington Court Susquehanna |
Cost $18.5 M In service 6/1/2030 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 130 |
Dominion Transmission Zone: Baseline New Mars – Lockridge – Golden 230kV Lines New Mars – Golden 500kV Line b3800.210 |
Golden Lockridge Mars Prentice Drive Sojourner |
Cost $431.62M In service 6/1/2027 |
| 2025-12-08 | TEAC Item 11 - Reliability Analysis Update p. 138 |
ACE/APS/ATSI/BGE/DPL/JCPL/ME/PECO/PENELEC/ComEd P5 CAPs: Baseline b4075 |
None named | Cost $35.759M In service 7/1/2029 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.