Barrister Substation

Named in 3 PJM planning documents for 3 projects, from October 8, 2024 to January 6, 2026.

Newdescribed as
DOMzone
230kVkV as printed
4mentions

Described as new: “proposed Barrister Substation” — source, page 19

Also printed as: Barrister

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Barrister 230kV Delivery - DEV
DOM-2022-0001 · s3027
Engineering $24.0M 06/30/2026 147.0 MW 2024-10-08
TEAC
Stratus 230kV Delivery - DEV
DOM-2022-0041 · s3033
Engineering $24.0M (Total) 08/29/2025 185.0 MW 2026-09-08*
SRRTEP Southern
Customer Load Request
DOM-2025-0078
Not printed Not printed May 31, 2029 290 MW 2026-01-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ENTERPRISE; LOCKRIDGE; ROUNDTABLE; SHELLHORN; STRATUS → BARRISTER; ENTERPRISE; LOCKRIDGE; ROUNDTABLE; SHELLHORN; STRATUS 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Southern
Dominion p. 19
Barrister 230kV Delivery - DEV “proposed Barrister Substation”
2026-09-08* SRRTEP Southern
Dominion p. 55
Stratus 230kV Delivery - DEV No role wording
230kV
2026-01-06 TEAC
Item 07 - DOM Supplemental Projects p. 5
Customer Load Request “install two additional transformers (TX#1 and TX#4) at Barrister Substation”
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 18
Barrister 230kV Delivery - DEV “DP Request for a new substation (Barrister)”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.