Olive
Named in 10 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.
Also printed as: Olive 345kV Station
PJM interconnection queue
A PJM queue substation page has the same name: Olive (IN) — 2 queue requests filed, 1 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| AEP Transmission Zone M-3 Process
Western Indiana and Central Ohio AEP-2023-IM015 · s3594.1 |
Not printed | $452.64 M | 05/30/2031 | Not printed | 2025-10-08 TEAC |
| AEP Transmission Zone M-3 Process
New Carlisle Customer Needs AEP-2023-IM020 · s3764.1-2 |
Conceptual | $30.463 M | 05/09/2028 | 90 MW | 2026-10-06 TEAC |
| AEP Transmission Zone M-3 Process
Project Amazing Sites 100 and 201 AEP-2023-IM023 · s3588.1-.7 |
Conceptual | $184.977M | 12/15/2026 | 1100MW | 2025-10-08 TEAC |
| Greentown, IN AEP-2024-IM018 |
Conceptual | $173M | 2032-2034 | Not printed | 2025-03-04 TEAC |
| German, IN AEP-2025-IM002 · s3838.1-3 |
Conceptual | $2.672 M | 09/29/2028 | Not printed | 2026-10-06 TEAC |
| Olive, IN AEP-2025-IM005 |
Not printed | Not printed | Not printed | Not printed | 2025-04-01 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate prior value printed on the same page |
$155.69 M → $184.977M | 2024-10-08 | 2024-10-08 |
| Substations named | DUMONT; ELDERBERRY; KENZIE CREEK; LARRISON DRIVE; NEW PRAIRIE; OLIVE; SORENSON; THOMSON → DUMONT; ELDERBERRY; LARRISON DRIVE; NEW PRAIRIE; OLIVE; SORENSON | 2025-10-08 | Not reported |
| Cost estimate | $173M → $0M (PJM) | 2025-03-04 | 2026-10-06 |
| In-service date | 06/01/2032 → 2032-2034 | 2024-12-03 | 2025-03-04 |
| Substations named | BABCOCK; DRESSER; FAIRBANKS; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; OLIVE; ROCKPORT; SORENSON; SULLIVAN; TANNERS CREEK; UNIVERSITY PARK → BABCOCK; BATESVILLE; DRESSER; FAIRBANKS; FALL CREEK; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; MADISON COUNTY; OLIVE; PIKE COUNTY; ROCKPORT; SORENSON; SULLIVAN; SUNNYSIDE; TANNERS CREEK; UNIVERSITY PARK | 2024-12-03 | 2025-03-04 |
| Substations named | BABCOCK; BATESVILLE; DRESSER; FAIRBANKS; FALL CREEK; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; MADISON COUNTY; OLIVE; PIKE COUNTY; ROCKPORT; SORENSON; SULLIVAN; SUNNYSIDE; TANNERS CREEK; UNIVERSITY PARK → BABCOCK; BATESVILLE; GWYNNEVILLE; MADISON COUNTY; PIKE COUNTY; SORENSON; SULLIVAN | 2025-03-04 | 2026-10-06 |
| Substations named | GERMAN → GERMAN; NOTRE DAME; OLIVE | 2025-02-14 | 2025-11-14 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 11 |
AEP Transmission Zone M-3 Process New Carlisle Customer Needs | “install three (3) new 138kV 3000A 63kA breakers” 138kV |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 35 |
German, IN | “Protection and controls settings updates at Olive station” |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 11 |
AEP Transmission Zone M-3 Process New Carlisle Customer Needs | “Bring the Edison - Creek Walker 138kV line into Olive station and install three (3) new 138kV 3000A 63kA breakers” 138kV |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 35 |
German, IN | “Protection and controls settings updates at Olive station” |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 12 |
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 | “Replace overdutied 345kV circuit breakers B, B1, B2, D1, and D2.” 345kV |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2025 RTEP p. 18 |
AEP Transmission Zone M-3 Process Western Indiana and Central Ohio | No role wording 345kV |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 8 |
German, IN | “updates at Olive station” |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 | “Replace overdutied 345kV circuit breakers B, B1, B2, D1, and D2” 345kV |
| 2025-10-08 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 19 |
AEP Transmission Zone M-3 Process Western Indiana and Central Ohio | No role wording 345kV |
| 2025-04-11 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 6 |
AEP Transmission Zone M-3 Process New Carlisle Customer Needs | “Bring the Edison - Creek Walker 138kV line into Olive station and install three (3) new 138kV 3000A 63kA breakers” 138kV |
| 2025-04-01 | TEAC Item 05 - AEP Supplemental Projects p. 3 |
Olive, IN | No role wording 345kV |
| 2025-03-04 | TEAC Item 08 - AEP Supplemental Projects p. 3 |
Greentown, IN | No role wording 345kV |
| 2024-12-03 | TEAC Item 08 - AEP Supplemental Projects p. 4 |
Greentown, IN | No role wording 345kV |
| 2024-12-03 | TEAC Item 08 - AEP Supplemental Projects p. 9 |
AEP Transmission Zone M-3 Process Western Indiana and Central Ohio | No role wording 345kV |
| 2024-10-08 | TEAC Item 06 - AEP Supplemental Projects p. 6 |
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 | “Replace overdutied 345kV circuit breakers” 345kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.