Millville
Named in 6 PJM planning documents for 4 projects, from October 8, 2024 to May 15, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
8mentions
Also printed as: Millville Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Millville Substation APS-2023-040 · s3105.1 |
Not printed | $0.7M | 04/15/2024 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-014 · s3711.1 |
Not printed | $2.00 M | 01/31/2027 | Not printed | 2025-10-08 TEAC |
| Misoperation Relay Projects APS-2024-062 to APS-2024-068 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| New Customer Request APS-2026-019 |
Not printed | Not printed | 10/03/2027 | 13 MW | 2026-05-15 SRRTEP Western |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 132 |
Misoperation Relay Projects | “replace circuit breaker, disconnect switches, substation conductor and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 46 |
Millville Substation | “At Millville Substation:
• On the Old Chapel 138 kV line exit, replace:” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 57 |
Misoperation Relay Projects | “At Millville, replace disconnect switches” 138 kV |
| 2026-05-15 | SRRTEP Western Item 03 - APS Supplemental Projects p. 4 |
New Customer Request | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 57 |
Misoperation Relay Projects | “At Millville, replace disconnect switches, line trap” 138 kV |
| 2025-07-18 | SRRTEP Western Item 02 - APS Supplemental Projects p. 5 |
Misoperation Relay Projects | “At Millville, replace disconnect switches” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 132 |
Misoperation Relay Projects | “At Millville, replace circuit breaker, disconnect switches, substation conductor and relaying” |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 47 |
Millville Substation | “At Millville Substation:” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.