Poe Road

Named in 4 PJM planning documents for 1 project, from June 13, 2025 to October 6, 2026.

Existingdescribed as
AMPTzone
69 kVkV as printed
4mentions

Also printed as: Poe Road substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Transmission Zone M3 Process Poe Road - Tontogany 69 kV line
AMPT-2025-004 · s3889.1 (AMPT) & s3889.2 (ATSI)
Engineering $6.136 M 11/30/2028 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named POE ROAD; SAND RIDGE; TONTOGANY → POE ROAD; SAND RIDGE Not reported Not reported
Substations named POE ROAD; SAND RIDGE → POE ROAD; SAND RIDGE; TONTOGANY 2026-10-06 Not reported
Substations named POE ROAD; TONTOGANY → POE ROAD; SAND RIDGE; TONTOGANY 2025-06-13 2026-02-13
Substations named POE ROAD; SAND RIDGE; TONTOGANY → POE ROAD; SAND RIDGE 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 13
AMPT Transmission Zone M3 Process Poe Road - Tontogany 69 kV line “from the Poe Road substation to the AMPT/FE point of interconnection”
69 kV
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2026 RTEP p. 13
AMPT Transmission Zone M3 Process Poe Road - Tontogany 69 kV line “from the Poe Road substation”
2026-02-13 SRRTEP Western
Item 03 - AMPT Supplemental Projects p. 4
AMPT Transmission Zone M3 Process Poe Road - Tontogany 69 kV line “rebuild 2.75 miles of the AMPT owned portion of the Poe Road - Tontogany 69 kV line from the Poe Road substation”
69 kV
2025-06-13 SRRTEP Western
Item 04 - AMPT Supplemental Projects p. 4
AMPT Transmission Zone M3 Process Poe Road - Tontogany 69 kV line No role wording
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.