Mentions: November 2025
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 3 |
Mendota-Sandwich 138 kV | Haumesser Mendota Sandwich Steward Waterman |
Cost $171.88 M In service 4/15/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 5 |
Mound Street-St Clair Avenue 138kV Line Rebuild 2025-W1-195 |
Mound Street Saint Clair St Clair Avenue |
Cost $41.586M In service 04/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 8 |
Bedington – Eagle 138 kV b3976.1 |
Bedington Eagle |
Cost $1.96M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 10 |
Meadow Brook-West Winchester 138 kV b3977.1 |
Meadow Brook West Winchester |
Cost $0.35M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 12 |
Lakeview-Ottawa 138 kV Line b3978.1 |
Lakeview Ottawa |
Cost $1.41M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 14 |
Abbe-Johnson No.1 69 kV Line b3979.1 |
Abbe Elyria Water P.C. Johnson Lorain College Spring Valley |
Cost $3.22M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 16 |
Bellevue-Groton 69 kV Line b3980.1 |
Bellevue Groton |
Cost $10.1M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 18 |
McGuffey-Locust 69 kV Line Rebuild b3944.1 |
Locust McGuffey |
Cost $5.316 M In service 05/29/2029 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 20 |
State Line 345/138 kV Transformer b3943.1 |
State Line | Cost $20.81 M In service 12/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 22 |
Cherry Valley 345/138 kV Transformer b3982.1 |
Cherry Valley | Cost $7.74 M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 24 |
Elk Grove 345/138 kV Transformer b3981.1 |
Elk Grove | Cost $28.96 M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 26 |
Adjust Mullens 138 kV Cap Bank b3945.1 |
Guyandotte Marianna Coal Mullens |
Cost $0.1M In service 12/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 28 |
Jarrett 138/46 kV Transformer & Hartland 46 kV Cap Adjustment b3946.1 |
Hartland Jarrett Kelly Creek Mammoth |
Cost $0.2M In service 4/15/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 30 |
Reduce Baileysville 46 kV Cap Bank b3947.1 |
Baileysville Marsh Fork |
Cost $0.1M In service 12/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 32 |
Replace Johns Creek 69kV Capacitor Bank b3948.1 |
Hatfield Johns Creek |
Cost $1.477 M In service 4/15/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 34 |
Huff Creek and Chauncey 138 kV Transformer Tap Settings b3949.1 |
Chauncey Huff Creek WVA Coal |
Cost $0.2 M In service 04/15/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 36 |
Tazewell 138 kV Transformer Setting Adjustment b3950.1 |
McDowell Tazewell |
Cost $0.1 M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 38 |
Falcon 69 kV Capacitor Bank Installation b3951.1 |
Falcon Middle Creek |
Cost $3.35 M In service 04/15/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 40 |
Joshua Falls 138 kV Circuit Breaker Replacements b3952.1 |
Joshua Falls | Cost $1.514M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 42 |
Roberts-Wilson 138kV line “in & out” of Milepost 138kV b3955.1 |
Blair Bolton Fisher Hall Milepost Roberts Trabue Wilson |
Cost $12.17 M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 44 |
Upgrade Station Conductor at Galloway 69kV b3956.1 |
Cole Galloway |
Cost $0.18 M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 46 |
Haviland 138 kV Transformer #4 Replacement b3957.1 |
Haviland | Cost $5.87M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 48 |
Elliot - Ohio University 69kV Sag Mitigation b3958.1 |
Elliott Ohio University |
Cost $0.36M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 50 |
Lick - Ironman 69kV Reconductor b3959.1 |
Ironman Lick |
Cost $1.099M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 52 |
South Side Lima Station 34.5 kV Upgrades b3961.1 |
Lima Pump SS South Side Lima |
Cost $0.08M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 54 |
North Newark Transformer #1 138/69 kV Replacement b3968.1 |
North Newark | Cost $6.33 M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 56 |
Findlay Center 138 kV Transformer Replacement b3969.1 |
Findlay Center | Cost $3.936 M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 58 |
Kenton - South Kenton 69kV line rebuild b3970.1 |
Kenton South Kenton |
Cost 13.19M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 60 |
138 kV Haviland Station Bus Upgrades b3971.1 |
Haviland Timber SW |
Cost 1.468 M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 62 |
East Lima - Haviland 138kV Sag Study b3972.1 |
East Lima Haviland |
Cost $6.80M In service 04/15/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 64 |
Catawba Add a 138/69 kV Transformer b3975.1 |
Catawba | Cost 7.77M In service 06/01/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 67 |
Bethel Road 138 kV Breakers “A, D, E, F, AA, XT1, XT2” Replacement b3966.1 |
Bethel Road | Cost $3.564M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 69 |
Hess Street 138 kV Breakers “4, XT1, XT2, XT3, XT4” Replacement b3965.1 |
Hess Street | Cost $4.603M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 71 |
New Carlisle 138 kV Breaker “XT3” Replacement b3953.1 |
New Carlisle | Cost $1.025M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 73 |
New Proctorville 138 kV Breaker “XT3” Replacement b3964.1 |
New Proctorville | Cost $0.94M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 75 |
OSU 138 kV Breakers “102, 103, XT4” Replacement b3963.1 |
OSU | Cost $2.9M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 77 |
Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement b3962.1 |
Roberts | Cost $0.85M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 79 |
Tidd 138 kV Breaker “DD” Replacement b3960.1 |
Tidd | Cost $0.773M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 81 |
Ringgold 138 kV Breaker “138 BUS TIE” Replacement b3983.1 |
Ringgold | Cost $0.957M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 83 |
Belmont 138 kV Breaker “B-8” Replacement b3983.2 |
Belmont | Cost $0.957M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 85 |
Avon 138 kV Breakers “4-B-107 and 4-B-84” Replacement b3985.1 |
Avon | Cost $1.92M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 87 |
Eastlake 138 kV Breaker Replacements – 12 breakers b3985.2 |
Eastlake | Cost $11.48M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 89 |
Hoytdale 138 kV Breakers “84-B-14, -18, and -22” Replacement b3985.3 |
Hoytdale | Cost $2.87M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 91 |
Johnson 69 kV Breaker “451-B-163” Replacement b3985.4 |
Johnson | Cost $0.957M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 93 |
Cambridge 34.5 kV F CB Replacement b3967.1 |
Cambridge | Cost $0.8M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 95 |
Thomas Road 69 kV XT1 CB Replacement b3954.1 |
Thomas Road | Cost $0.72M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 97 |
Hazard 69 kV R CB Replacement b3974.1 |
Hazard | Cost $0.85M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 99 |
Greenfield 69 kV B-24, B-272, B-274 CB Replacement b3984.1 |
Greenfield | Cost $1.53M In service 6/1/2030 |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 3 |
London - Tangy 138 kV Line ATSI-2025-033 |
London | In service 6/1/2027 |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 4 |
Nottingham - Yager No. 1 138 kV Line ATSI-2025-034 |
Yager Substation | In service 11/1/2027 |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 5 |
Black River - Willow Creek 69 kV Line ATSI-2025-035 |
None named | No figures printed |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 7 |
Ashtabula – Ashtabula East 138 kV ATSI-2024-054 |
Ashtabula East Substation | Status Conceptual Cost $4.79M In service 12/18/2026 Load 16 MW |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 9 |
Maple - Pine 69 kV ATSI-2022-009 |
None named | Status Conceptual Cost $36.68M In service 05/19/2028 |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 11 |
London - Tangy 138 kV Line ATSI-2025-031 |
London Tangy |
Status Conceptual Cost $1.41M In service 08/16/2027 |
| 2025-11-14 | SRRTEP Western Item 02 - ATSI Supplemental Projects - Version 2 p. 14 |
Cloverdale – Harmon 138 kV Line Customer Connection ATSI-2024-041 · s3499.1 |
Cloverdale Harmon |
Status Engineering Cost $0.8M In service 12/31/2027 |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 3 |
Studebaker, IN AEP-2025-IM012 |
Studebaker | No figures printed |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 4 |
Thelma, KY/Big Sandy, KY/Busseyville, KY AEP-2025-AP006 |
Big Sandy Busseyville Thelma |
No figures printed |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 5 |
Freebyrd, OH/Nottingham, OH AEP-2025-OH026 |
Sparrow | Load 140 MW |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 7 |
German, IN/Olive, IN/Notre Dame, IN AEP-2025-IM002 |
German Notre Dame Olive |
Status Scoping (Conceptual) Cost $2.672 M In service 09/29/2028 |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 9 |
Helium Switch, OH/Forest3, OH/Upper Sandusky, OH AEP-2025-OH009 |
Forest Helium Switch New Upper Sandusky |
Status Engineering Cost $4.901 M In service 07/01/2026 Load 13.5MW |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 11 |
East Tiffin, OH/Mousey Switch, OH AEP-2025-OH024 |
East Tiffin Mousey Switch |
Status Engineering Cost $19.174 M In service 05/01/2027 |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 13 |
Cleveland, IN/Capital Ave, IN/East Elkhart, IN AEP-2025-IM006 |
Capital Avenue Cleveland East Elkhart |
Status Scoping (Conceptual) Cost $7.067 M In service 12/31/2030 |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 15 |
Abert, VA AEP-2025-AP007 |
Abert | Status Scoping (Conceptual) Cost $3.4 M In service 11/16/2029 |
| 2025-11-14 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 3 |
NIPSCO Customer in Chicago ComEd-2025-027 |
None named | Load 260 MW |
| 2025-11-14 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 5 |
138 kV L1206 Circuit Switcher ComEd-2025-006 |
Channahon Morris CoGen tap |
Status Conceptual Cost $0.4 M In service 3/31/2030 |
| 2025-11-14 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 7 |
138 kV L1205 Circuit Switcher ComEd-2025-007 |
Mazon Morris CoGen tap |
Status Conceptual Cost $0.4 M In service 3/31/2030 |
| 2025-11-14 | SRRTEP Western Item 04 - ComEd Supplemental Projects p. 9 |
Cherry Valley 138 kV 1-2 CB ComEd-2025-023 |
Cherry Valley | Status Conceptual Cost $2.6 M In service 12/31/2026 |
| 2025-11-14 | SRRTEP Western Item 05 - DEOK Supplemental Projects p. 3 |
Turfway DEOK-2024-004 · s3600.1 |
Donaldson Turfway New Woodspoint |
Status Scoping (Conceptual) Cost $15.8M In service 07/26/2028 |
| 2025-11-14 | SRRTEP Western Item 06 - Dayton Supplemental Projects p. 3 |
Dayton-2025-011 | East Casstown St. Paris |
No figures printed |
| 2025-11-14 | SRRTEP Western Item 07 - EKPC Supplemental Projects p. 3 |
Skaggs, KY EKPC-2025-005 |
AEP Thelma Dewey Dam Dewey Station Jenny Wiley Rowan County Skaggs Thelma Thunder Ridge New |
Status Engineering Cost $14.13 M In service 12/31/2028 |
| 2025-11-14 | SRRTEP Western Item 07 - EKPC Supplemental Projects p. 5 |
Murphysville, KY EKPC-2025-006 |
Headquarters Murphysville Renaker Spurlock Stonewall Distribution New |
Status Engineering Cost $1.5 M In service 12/31/2028 |
| 2025-11-14 | SRRTEP Western Item 07 - EKPC Supplemental Projects p. 7 |
Owen County, KY EKPC-2025-007 |
Bavarian Boone County Clay Village Munk Jct New Owen County Penn Renaker West Frankfort Williamstown |
Status Engineering Cost $22.015 M In service 12/31/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3 |
Vienna – Loretto 138kV Line b4023.1 |
Loretto Vienna |
Cost 1.814 M In service 5/31/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 4 |
Sharptown – Laurel 69kV Line b4024.1 |
Laurel Sharptown |
Cost $38.249 M In service 5/31/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 5 |
ODEC Thermal And Voltage Solutions b4033.8 |
Belle Haven Cheriton Hallwood Kellam Oak Hall Parksley Parsley Perdue Tasley |
Cost $132.01M In service 12/31/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 7 |
Rahway - Roselle 69kV Line b4019.1 |
Blair Road Rahway Roselle |
Cost $29.4 M In service 12/31/2029 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 9 |
Gloucester - Nicholson 69kV Line b4020.1 |
Gloucester Hilltop Lawnside Nicholson |
Cost $10.8M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 12 |
Prospect Park - North Paterson 69 kV Line b4021.1 |
Cedar Grove Harvey North Paterson Prospect Park |
Cost $15.703M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 14 |
Greene Street – Constitution St 115 kV Line b4022.1 |
Constitution St Greene Street |
Cost $58.49M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16 |
Jackson – North Hanover 115 kV Line b4011.3 |
Eisenhower Fairview Gitts Run Jackson North Hanover |
Cost $61.79 M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 19 |
Belleville – Center Union 46 kV Line b4012.1 |
Belleville Center Union |
Cost $2.72 M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 21 |
Colts Neck 34.5 kV Substation b4013.1 |
Colts Neck | Cost $2.69 M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 23 |
Sussex 34.5 kV Substation b4014.1 |
Sussex | Cost $2.28 M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 25 |
Long Branch 34.5 kV Substation b4015.1 |
Bath Ave Long Branch Substation |
Cost $532 K In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 27 |
Jamesburg – Monroe 34.5 kV Line b4016.1 |
Costco Englishtown Jamesburg Monroe Monroe Junction |
Cost $6.35 M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 29 |
Great Adventure 34.5 kV Substation b4017.2 |
Cookstown Great Adventure Greater Adventure Van Hiseville Windsor |
Cost $61.68 M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32 |
Metedconk and Vermont Ave 34.5 kV Substations b4018.5 |
Herbertsville Larrabee Leisure Village Metedconk Point Pleasant No. 2 South Lakewood Vermont Ave Vermont Avenue New |
In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 36 |
E.Flemington 34.5kV CB Replacements H736, YH, Y727, AV, TC, C731, V724, A729 b3987.1 |
E.Flemington | Cost $3.5M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 38 |
Windsor 34.5kV CB Replacements:
KQ, Q143, B-25, B-22, B-31, B-34, B-19, B-28, B-16, BK4, B-7, B-8, B-54, B-51 b3986.1 |
Windsor | Cost $8.4M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 40 |
Warren 115kV Breaker “NO.1 XFMR” Replacement b3988.1 |
Warren | Cost $0.957M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 3 |
Windy Edge Circuit Breaker B2 BGE-2025-009 |
Windy Edge | No figures printed |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 4 |
Windy Edge Circuit Breaker B5 BGE-2025-010 |
Windy Edge | No figures printed |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 6 |
Windy Edge Circuit Breaker B8 BGE-2025-003 |
Windy Edge | Status Engineering Cost $0.7M In service 5/1/2028 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 8 |
Windy Edge Circuit Breaker B9 BGE-2025-004 |
Windy Edge | Status Engineering Cost $0.7M In service 4/10/2026 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 10 |
Windy Edge Circuit Breaker B22 BGE-2025-005 |
Windy Edge | Status Engineering Cost $0.7M In service 11/1/2027 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 12 |
Windy Edge Circuit Breaker B29 BGE-2025-006 |
Windy Edge | Status Engineering Cost $0.7M In service 5/21/2026 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 14 |
High Ridge to Dorsey Tap to Crystal Springs Tap BGE-2025-007 |
Crystal Springs Crystal Springs Tap Dorsey Run Dorsey Run Tap High Ridge |
Status Engineering Cost $12.4M In service 6/31/2027 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 04 - JCPL Supplemental Projects p. 3 |
Martinsville - Readington 34.5 kV X778 Line – Customer Connection JCPL-2025-010 |
Martinsville Readington |
In service 1/25/2027 Load 10 MW |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 05 - Penelec Supplemental Projects p. 3 |
East Towanda - North Meshoppen 115 kV Line – Customer Connection PN-2025-008 |
East Towanda North Meshoppen |
In service 12/31/2026 Load approximately 50 MVA |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 05 - Penelec Supplemental Projects p. 5 |
Cooper and Prospect Substation Terminal Upgrades PN-2024-032 |
Cooper Substation Prospect Substation |
Status Conceptual Cost $ 3.25 M In service 10/31/2029 |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 05 - Penelec Supplemental Projects p. 9 |
Niles Valley 115 kV Ring Bus s3290 |
Hector Mansfield Niles Valley Osceola Sabinsville Wellsboro |
Status Engineering Cost $16.0M In service 4/28/2028 Load approximately 30 MW |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 06 - PSEG Supplemental Projects - Version 2 p. 3 |
PSE&G Central Territory PSEG-2025-0006 |
Sand Hills | No figures printed |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 06 - PSEG Supplemental Projects - Version 2 p. 4 |
PSE&G Southern Territory PSEG-2025-0007 |
Gloucester Lawnside |
No figures printed |
| 2025-11-13 | SRRTEP Southern Item 02 - SRRTEP South - Reliability Analysis Update p. 3 |
Bremo to Fork Union 115kV | Bremo Fork Union |
Cost $7M In service 6/1/2030 |
| 2025-11-13 | SRRTEP Southern Item 07 - DOM Supplemental Projects p. 3 |
Supplemental
Customer Load Request DOM-2025-0076 |
Jarratt Substation | In service 12/31/2026 Load 33 MW |
| 2025-11-13 | SRRTEP Southern Item 07 - DOM Supplemental Projects p. 4 |
Supplemental
Customer Load Request DOM-2025-0077 |
Harmony Village Substation | In service 12/15/2026 Load 159 MW |
| 2025-11-13 | SRRTEP Southern Item 07 - DOM Supplemental Projects p. 6 |
Supplemental
115kV Line #27 – EOL Rebuild DOM-2025-0058 |
Bains Store Bayside Burton Long Creek VA Beach |
Status Engineering Cost $64M In service 12/31/2027 |
| 2025-11-04 | TEAC Item 04 - APS Supplemental Projects - Version 7 p. 3 |
Rhodes Lane - Yukon 500 kV Line APS-2025-029 |
Rhodes Lane Substation Yukon |
No figures printed |
| 2025-11-04 | TEAC Item 04 - APS Supplemental Projects - Version 7 p. 5 |
Eaglehead - Monocacy 230 kV Line APS-2025-003 |
Eaglehead Substation Monocacy Substation |
Status Conceptual Cost $3.88M In service 08/24/2029 |
| 2025-11-04 | TEAC Item 04 - APS Supplemental Projects - Version 7 p. 7 |
Wylie Ridge No. 3 345/138 kV Transformer APS-2024-079 |
Wylie Ridge Substation | Status Conceptual Cost $13.45M In service 12/13/2030 |
| 2025-11-04 | TEAC Item 04 - APS Supplemental Projects - Version 7 p. 9 |
Carroll - Mount Airy 230 kV line APS-2023-058 |
Carroll Mt. Airy |
Status Conceptual Cost $50M In service 06/30/2029 |
| 2025-11-04 | TEAC Item 04 - APS Supplemental Projects - Version 7 p. 11 |
Doubs to Lime Kiln 230 kV APS-2025-021 |
Doubs Lime Kiln Quantum 300 Substation New Sage |
Status Conceptual Cost 36.75 In service 02/18/2032 |
| 2025-11-04 | TEAC Item 05 - JCPL Supplemental Projects p. 3 |
Englishtown Substation JCPL-2025-005 |
Englishtown | No figures printed |
| 2025-11-04 | TEAC Item 05 - JCPL Supplemental Projects p. 4 |
Kittatinny Substation JCPL-2025-006 |
Andover Blairstown East Newton Kittatinny Newton |
Load 35 MW |
| 2025-11-04 | TEAC Item 06 - PENELEC Supplemental Projects p. 3 |
Raystown Substation PN-2025-010 |
Raystown | No figures printed |
| 2025-11-04 | TEAC Item 06 - PENELEC Supplemental Projects p. 5 |
Johnstown - Seward 230 kV Line PN-2025-007 |
Johnstown Seward |
Status Conceptual Cost $ 30.01 M In service 06/15/2027 |
| 2025-11-04 | TEAC Item 07 - AEP Supplemental Projects p. 3 |
Hanna, IN/Tanners Creek, IN AEP-2025-IM010 |
Hanna Junction Tower Sunnyside Tanners Creek |
No figures printed |
| 2025-11-04 | TEAC Item 07 - AEP Supplemental Projects p. 5 |
Allen, IN AEP-2025-IM011 |
None named | In service 12/31/2028 Load 500MW |
| 2025-11-04 | TEAC Item 08 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental
Orefield, PA PPL-2025-0006 |
Alburtis Allentown Orefield New Siegfried Susquehanna Wescosville |
Status Conceptual Cost $194 M In service 05/31/2028 Load 1000 MW |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 3 |
PE-2025-006 | Lock | No figures printed |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 4 |
PE-2025-007 | None named | Load 750 MW |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 5 |
PE-2025-008 | None named | Load 500 MW |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 6 |
PE-2025-009 | Plymouth Meeting Whitpain |
No figures printed |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 7 |
PE-2025-010 | Plymouth Meeting Whitpain |
No figures printed |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 9 |
PE-2025-004 | Emilie Ford Mill |
Status Engineering In service Phase 1 – 1/2027, Phase 2 – 6/2030 Load 600 MW |
| 2025-11-04 | TEAC Item 09 - PECO Supplemental Projects p. 11 |
PE-2025-005 | North Philadelphia | Status Engineering Cost $0.6M In service 5/23/2026 |
| 2025-11-04 | TEAC Item 10 - BGE Supplemental Projects p. 3 |
Annapolis Junction BGE-2021-004 · s2643; s2643.1; s2643.2; s2643.3; s2643.4 |
High Ridge – Crystal Springs Naval Academy Jct. |
Status Engineering Cost $124M In service 12/2028 Load ~400MW |
| 2025-11-04 | TEAC Item 10 - BGE Supplemental Projects p. 5 |
Riverside Breaker B52 BGE-2025-001 |
Riverside | Status Engineering Cost $0.8M In service 10/31/2026 |
| 2025-11-04 | TEAC Item 10 - BGE Supplemental Projects p. 7 |
Riverside Breaker B53 BGE-2025-002 |
Riverside | Status Engineering Cost $0.8M In service 12/12/2026 |
| 2025-11-04 | TEAC Item 11 - ComEd Supplemental Projects p. 3 |
Zion 345 kV CBs ComEd-2025-024 |
Zion | No figures printed |
| 2025-11-04 | TEAC Item 11 - ComEd Supplemental Projects p. 4 |
State Line 345 kV CBs ComEd-2025-025 |
State Line | No figures printed |
| 2025-11-04 | TEAC Item 11 - ComEd Supplemental Projects p. 5 |
Des Plaines 345 kV CBs ComEd-2025-026 |
Des Plaines | No figures printed |
| 2025-11-04 | TEAC Item 11 - ComEd Supplemental Projects p. 7 |
Plano 345 kV BT 5-6 CB ComEd-2025-022 |
Electric Junction Plano |
Status Conceptual Cost $3.9M In service 12/31/2026 |
| 2025-11-04 | TEAC Item 11 - ComEd Supplemental Projects p. 9 |
MISO Tranche 2.1 Request ComEd 2024-023 |
Babcock Collins Des Plaines Green Acres Katydid Lakeview Nevada Olive Paris Pleasant Prairie Powerton University Park Woodford County New Zion |
Status Conceptual Cost $908.7M In service 6/1/2034 |
| 2025-11-04 | TEAC Item 12 - PSEG Supplemental Projects p. 3 |
Kenilworth Area Data Center PSEG-2025-0005 |
None named | Load 300 MW |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0005 |
Amethyst New | In service 10/1/2031 Load 300 MW |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0006 |
Garnet New | In service 10/1/2028 Load 300 MW |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0007 |
Topaz New | In service 10/1/2030 Load 300 MW |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 6 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0011 |
Hibie St New Reeves Ave |
In service 12/31/2027 |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0017 |
Hanover | In service 12/31/2026 |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 8 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0051 |
Emy New | In service 05/01/2030 Load 212 MW |
| 2025-11-04 | TEAC Item 13 - DOM Supplemental Projects p. 9 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0059 |
Powell Creek New | In service 12/31/2028 Load 84 MW |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 6 |
Wilton Center 765/345 kV b4006.1 |
Wilton Center | Cost $45.81 M In service 12/1/2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 8 |
McCanns Rd 138 kV Switching Station b4001.1 |
Bartonville Double Toll Gate Greenwood McCanns Rd New Redbud Stephenson West Winchester |
Cost $23.87 M In service 6/1/2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 10 |
Garrett – Garrett Tap 115 kV b4002.1 |
Deep Creek Garrett Garrett Tap Penn Mar |
Cost $9.15 M In service 6/1/2029 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 12 |
138 kV line College Corner - Collinsville b4003.1 |
College Corner Collinsville Trenton |
Cost $58.47 M In service 06/2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 14 |
Claymont Substation Bus Upgrade b4004.1 |
Claymont Linwood |
Cost $0.031M In service 06-01-2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 15 |
Chichester Relay Upgrade b3942.1 |
Chichester Trainer |
Cost $0.691M In service 06-01-2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 16 |
Roseland – Livingston 230kV b4005.1 |
Laurel Ave Livingston Roseland |
Cost $9.93M In service 06-01-2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 18 |
Woodsdale 345 kV Reliability & Reconfigure | Todhunter Woodsdale |
Cost $36.818 M In service 11/16/2028 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 20 |
Cluster AEP-1 2025-W1-724 |
Auglaize Mark Center Platter Creek Sherwood |
Cost $28.7M In service 2/28/2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 23 |
Cluster AEP-5 2025-W1-689 |
Moneta Rockcastle Smith Mountain |
Cost $9.879M In service 06/01/2029 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 26 |
Montville Substation 2025-W1-140 |
Hopatcong Montville Roseland Whippany |
Cost $66.83 M In service 11/1/2029 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 28 |
Hopewell – Chesterfield – Basin 230 kV 2025-W1-911 |
Basin Bremo Charlottesville Chesterfield Fork Union Hopewell Mt. Eagle Tap Septa Suffolk Yadkin |
Cost $113.55 M In service 6/1/2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 54 |
MAAC PPL Cluster 2025-W1-558 |
Glen Brook Jenkins Juniata Kelayres New Monroe Montour Sunbury Susquehanna Susquehanna T10 Tomhicken |
Cost $565.4M In service 6/1/2030 |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 124 |
P5 CAPs: Baseline | None named | Cost $35.759M In service 7/1/2029 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.