Substation Scout

Cloverdale

Named in 2 PJM planning documents for 1 project, on October 6, 2026.

Not stateddescribed as
AMPTzone
138 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH
AMPT-2023-004 · s3832.1 (AMPT), s3832.2 (ATSI), s3832.3 (AMPT), s3832.4 (AMPT), s3832.5 (AMPT), s3832.6 (AEP)
Engineering $68.741M 8/30/2030 60 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $71.7 M → $68.741M 2025-09-19 2026-10-06
In-service date AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028) → 8/30/2030 2025-09-19 2026-10-06
Status unknown (Engineering (AMPT), Conceptual (AEP and FE)) → engineering (Engineering) 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE 2026-10-06 Not reported
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT Not reported Not reported
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR Not reported Not reported
Substations named APPLE AVE; APPLE AVE SUBS; E WOOSTER; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR 2026-10-06 2026-10-06
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 8
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH No role wording
138 kV
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2026 RTEP p. 8
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this