Woodsdale
Named in 11 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.
Also printed as: Woodsdale Substation
PJM interconnection queue
A PJM queue substation page has the same name: Woodsdale (OH) — 8 queue requests filed, 7 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Woodsdale 345 kV Reliability & Reconfigure b3940.1 |
Not printed | $36.818 M | 11/16/2028 | Not printed | 2026-01-06 TEAC |
| Woodsdale 345 kV Reliability & Reconfigure | Not printed | $36.818 M | 11/16/2028 | Not printed | 2025-11-04 TEAC |
| Woodsdale DEOK-2021-002 · s3447.1 |
Engineering | $7,769,972 | 11/12/2027 | Not printed | 2024-10-08 TEAC |
| Trenton Load Request DEOK-2024-006 · s3601.1 |
Conceptual | $36.2M | 03/01/2026 | 500 MW | 2025-10-08 TEAC |
| Customer Load Request DEOK-2025-003 |
Not printed | Not printed | Not printed | 800 MW | 2026-09-08 TEAC |
| Customer Load Request DEOK-2026-004 · s3909.1 - .6 |
Conceptual | $32.8M | 06/01/2029 | 300 MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BECKETT; COTTON RUN; MIAMI FORT; MILLIKIN; PORT UNION; TODHUNTER; WAYNE MADISON; WEST MILTON; WOODSDALE → BECKETT; COTTON RUN; MIAMI FORT; MILLIKIN; MORGAN; PORT UNION; TODHUNTER; WAYNE MADISON; WEST MILTON; WILLEY; WOODSDALE | 2025-07-08 | 2026-09-08 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - DEOK Local Plan Submission of the supplemental projects for 2026 p. 11 |
Customer Load Request | “Install two new 345 kV, 4000 A, 50 kA interrupt circuit breakers in Woodsdale substation” 345 kV |
| 2026-09-30* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2026 RTEP p. 11 |
Customer Load Request | “Install two new 345 kV, 4000 A, 50 kA interrupt circuit breakers in Woodsdale substation” 345 kV |
| 2026-09-08 | TEAC Item 08 - DEOK Supplemental Projects p. 4 |
Customer Load Request | “connect a new circuit to Woodsdale substation” |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2024 RTEP p. 2 |
Woodsdale | “Woodsdale substation has nine 345 kV Cogenel breakers” 345 kV |
| 2026-09-08* | SRRTEP Western DEOK local plan submission of the supplemental projects for 2025 RTEP p. 9 |
Trenton Load Request | “expanding and modifying the Woodsdale ring-bus into a breaker-and-a-half configuration” 345 kV |
| 2026-08-04 | TEAC Item 11 - DEOK Supplemental Projects p. 4 |
Customer Load Request | “Install two new 345 kV, 4000 A, 50 kA interrupt circuit breakers in Woodsdale substation” 345 kV |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 14 |
Woodsdale 345 kV Reliability & Reconfigure | “Woodsdale Substation will be reconfigured” 345 kV |
| 2025-11-04 | TEAC Item 14 - Reliability Analysis Update p. 19 |
Woodsdale 345 kV Reliability & Reconfigure | “The 345 kV ring bus at Woodsdale Substation will be reconfigured into a 345 kV breaker-and-half yard” 345 kV |
| 2025-10-08 | TEAC Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 9 |
Trenton Load Request | “expanding and modifying the Woodsdale” 345 kV |
| 2025-07-08 | TEAC Item 08 - DEOK Supplemental Projects p. 4 |
Customer Load Request | “existing Miami Fort to Woodsdale 345 kV circuit” 345 kV |
| 2024-10-08 | TEAC Informational Only - DEOK Local Plan submission of supplemental project 2024 p. 2 |
Woodsdale | “Woodsdale substation has nine 345 kV Cogenel breakers” 345 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.