Substation Scout

Jacksons Ferry

Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to November 15, 2024.

Existingdescribed as
AEPzone
138 kV, 138kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Jacksons Ferry 138kV L Circuit Switcher Replacement
b3895.1
Not printed $1.0M 6/1/2026 Not printed 2024-11-15
SRRTEP Western
AEP Transmission Zone: Baseline Jacksons Ferry 138kV L Circuit Switcher Replacement Not printed $1.0M 6/1/2026 Not printed 2024-10-18
SRRTEP Western
Carroll County, VA
AEP-2021-AP009 · s3134.1-.2
Engineering $20.8 M 11/15/2024 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 43
Carroll County, VA No role wording
138 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 15
AEP Transmission Zone: Baseline Jacksons Ferry 138kV L Circuit Switcher Replacement “Replace over duty Jacksons Ferry 138kV circuit switcher L”
138kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 13
AEP Transmission Zone: Baseline Jacksons Ferry 138kV L Circuit Switcher Replacement “Replace over duty Jacksons Ferry 138kV circuit switcher L”
138kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 43
Carroll County, VA No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this