Haviland

Named in 6 PJM planning documents for 9 projects, from October 8, 2024 to November 14, 2025.

Existingdescribed as
AEPzone
138 kV, 138/69/13 kV, 138kV, 69 kVkV as printed
10mentions

Also printed as: Haviland station · Haviland substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Haviland Station Upgrades
b3883.1
Not printed $0.8M 4/1/2029 Not printed 2024-11-15
SRRTEP Western
Haviland 138 kV Transformer #4 Replacement
b3957.1
Not printed $5.87M 06/01/2030 Not printed 2025-11-14
SRRTEP Western
138 kV Haviland Station Bus Upgrades
b3971.1
Not printed 1.468 M 06/01/2030 Not printed 2025-11-14
SRRTEP Western
East Lima - Haviland 138kV Sag Study
b3972.1
Not printed $6.80M 04/15/2030 Not printed 2025-11-14
SRRTEP Western
AEP Transmission Zone: Baseline Haviland Station Upgrades Not printed $0.8M 4/1/2029 Not printed 2024-10-18
SRRTEP Western
138 kV Haviland Station Bus Upgrades Not printed 1.468 M 06/01/2030 Not printed 2025-10-17
SRRTEP Western
East Lima - Haviland 138kV Sag Study Not printed 6.80M 04/15/2030 Not printed 2025-10-17
SRRTEP Western
Haviland 138 kV Transformer #4 Replacement Not printed $5.87M 06/01/2030 Not printed 2025-10-17
SRRTEP Western
Haviland-Van Wert Rebuild
AEP-2022-OH043, AEP-2023-OH065 · s3142.1-.5
Conceptual $32.57M 1/1/2026 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 34
Haviland-Van Wert Rebuild “Perform remote end work at Haviland”
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 47
Haviland 138 kV Transformer #4 Replacement “At Haviland substation, replace TR#4 with 138/69/12kV 130MVA bank”
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 61
138 kV Haviland Station Bus Upgrades “At Haviland, Reconductor Bus#1 Sub cond 500 MCM CU 37 Str towards Haviland Bus#2”
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 62
East Lima - Haviland 138kV Sag Study No role wording
138kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 41
Haviland 138 kV Transformer #4 Replacement “At Haviland substation, replace TR#4”
138/69/13 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 55
138 kV Haviland Station Bus Upgrades “138 kV Haviland Station Bus Upgrades”
138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 57
East Lima - Haviland 138kV Sag Study No role wording
138kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 37
AEP Transmission Zone: Baseline Haviland Station Upgrades “Replace the 69 kV station equipment, including relays, conductor, and switches at Haviland station”
69 kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 36
AEP Transmission Zone: Baseline Haviland Station Upgrades “Replace the 69 kV station equipment, including relays, conductor, and switches at Haviland station”
69 kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 34
Haviland-Van Wert Rebuild “Perform remote end work at Haviland”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.