Haviland
Named in 6 PJM planning documents for 9 projects, from October 8, 2024 to November 14, 2025.
Existingdescribed as
AEPzone
138 kV, 138/69/13 kV, 138kV, 69 kVkV as printed
10mentions
Also printed as: Haviland station · Haviland substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| AEP Transmission Zone: Baseline
Haviland Station Upgrades b3883.1 |
Not printed | $0.8M | 4/1/2029 | Not printed | 2024-11-15 SRRTEP Western |
| Haviland 138 kV Transformer #4 Replacement b3957.1 |
Not printed | $5.87M | 06/01/2030 | Not printed | 2025-11-14 SRRTEP Western |
| 138 kV Haviland Station Bus Upgrades b3971.1 |
Not printed | 1.468 M | 06/01/2030 | Not printed | 2025-11-14 SRRTEP Western |
| East Lima - Haviland 138kV Sag Study b3972.1 |
Not printed | $6.80M | 04/15/2030 | Not printed | 2025-11-14 SRRTEP Western |
| AEP Transmission Zone: Baseline Haviland Station Upgrades | Not printed | $0.8M | 4/1/2029 | Not printed | 2024-10-18 SRRTEP Western |
| 138 kV Haviland Station Bus Upgrades | Not printed | 1.468 M | 06/01/2030 | Not printed | 2025-10-17 SRRTEP Western |
| East Lima - Haviland 138kV Sag Study | Not printed | 6.80M | 04/15/2030 | Not printed | 2025-10-17 SRRTEP Western |
| Haviland 138 kV Transformer #4 Replacement | Not printed | $5.87M | 06/01/2030 | Not printed | 2025-10-17 SRRTEP Western |
| Haviland-Van Wert Rebuild AEP-2022-OH043, AEP-2023-OH065 · s3142.1-.5 |
Conceptual | $32.57M | 1/1/2026 | Not printed | 2024-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 34 |
Haviland-Van Wert Rebuild | “Perform remote end work at Haviland” |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 47 |
Haviland 138 kV Transformer #4 Replacement | “At Haviland substation, replace TR#4 with 138/69/12kV
130MVA bank” 138 kV |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 61 |
138 kV Haviland Station Bus Upgrades | “At Haviland, Reconductor Bus#1 Sub cond 500 MCM CU 37 Str
towards Haviland Bus#2” 138 kV |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 62 |
East Lima - Haviland 138kV Sag Study | No role wording 138kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 41 |
Haviland 138 kV Transformer #4 Replacement | “At Haviland substation, replace TR#4” 138/69/13 kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 55 |
138 kV Haviland Station Bus Upgrades | “138 kV Haviland Station Bus Upgrades” 138 kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 57 |
East Lima - Haviland 138kV Sag Study | No role wording 138kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 37 |
AEP Transmission Zone: Baseline Haviland Station Upgrades | “Replace the 69 kV station equipment, including relays, conductor, and
switches at Haviland station” 69 kV |
| 2024-10-18 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 36 |
AEP Transmission Zone: Baseline Haviland Station Upgrades | “Replace the 69 kV station equipment, including relays, conductor, and
switches at Haviland station” 69 kV |
| 2024-10-08 | TEAC Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 34 |
Haviland-Van Wert Rebuild | “Perform remote end work at Haviland” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.