Substation Scout

Kidston

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to May 15, 2026.

Existingdescribed as
AMPTzone
69 kV, 69kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Pioneer, OH
AMPT-2022-002 · s3117.1 (AMPT); s3117.2 (AMPT), s3117.3 (AMPT), s3117.4 (ATSI); s3117.5 (ATSI), s3117.6 (ATSI)
Not printed $26.5 M 5/31/2027 8 MW 2024-10-08
TEAC
Kexon Tap-Kidston-Chase Brass 69 kV line
AMPT-2026-004
Not printed Not printed Not printed Not printed 2026-05-15
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $26.5 M → $12.6 M Not reported Not reported
Cost estimate $12.6 M → $26.5 M 2024-10-08 Not reported
Cost estimate $26.5 M → $12.6 M 2024-10-08 2024-10-08
Substations named EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER → E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER Not reported Not reported
Substations named E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER → EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER 2024-10-08 Not reported
Substations named EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER → E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER 2024-10-08 2024-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2024 RTEP p. 3
Pioneer, OH “Extend the existing normally open circuit out of AMPT’s Kidston station”
69kV
2026-05-15 SRRTEP Western
Item 02 - AMPT Supplemental Projects p. 5
Kexon Tap-Kidston-Chase Brass 69 kV line No role wording
69 kV
2024-10-08 TEAC
Informational Only - AMPT Local Plan submission of supplemental project 2024 p. 3
Pioneer, OH “Extend the existing normally open circuit out of AMPT’s Kidston station”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.