Substation Scout

Birdsboro Substation

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
METEDzone
69 kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Birdsboro (PA) — 5 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Birdsboro – Birdsboro Extrusions 69 kV Line
ME-2023-011 · s3289.1
Not printed $2.1M 12/10/2025 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 15
Birdsboro – Birdsboro Extrusions 69 kV Line “At Birdsboro Substation:  Replace 69 kV circuit breaker”
69 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 15
Birdsboro – Birdsboro Extrusions 69 kV Line “At Birdsboro Substation: § Replace 69 kV circuit breaker”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this