Washington CH

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
DAYTONzone
69kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton Transmission Zone M-3 Process Southeast Dayton Zone
Dayton-2021-005 · S3450.1-.7
Conceptual $120.5M 12/1/2030 35MW 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named AIR PARK; COLUMBUS STREET; SABINA; WASHINGTON CH; WEBB ROAD; WILMINGTON → AIR PARK; AIR PARK 69KVSUBSTATION; AIRPARK; CAESARS CREEK; CLINTON; COLUMBUS STREET; SABINA; WASHINGTON CH; WEBB ROAD; WILMINGTON 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
Dayton local plan submission of the supplemental projects for 2024 RTEP p. 6
Dayton Transmission Zone M-3 Process Southeast Dayton Zone “remote ends upgrades at Wilmington and Washington CH substations”
2024-10-08 TEAC
Informational Only - DAYTON Local Plan submission of supplemental project 2024 p. 6
Dayton Transmission Zone M-3 Process Southeast Dayton Zone “remote ends upgrades at Wilmington and Washington CH substations”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.