Warrior Ridge
Named in 5 PJM planning documents for 3 projects, from March 18, 2026 to October 6, 2026.
Existingdescribed as
PENELECzone
46 kVkV as printed
6mentions
Also printed as: Warrior Ridge Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Lewistown Area 46 kV Network PN-2024-023 · s3984.1 |
Not printed | $6.61M | 12/31/2027 | Not printed | 2026-10-06 TEAC |
| Warrior Ridge - Huntingdon - Owens Corning 46 kV Lines PN-2025-003 · s3744.1 |
Not printed | $5.1M | 3/26/2026 | Not printed | 2026-10-06 TEAC |
| Valley REC Miller - Warrior Ridge 46 kV H Line Rebuild PN-2026-010 |
Conceptual | $14.82 M | 12/19/2028 | Not printed | 2026-09-17 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | MILLER REC; VALLEY REC MILLER; WARRIOR RIDGE → WARRIOR RIDGE | 2026-06-16 | 2026-09-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 11 |
Warrior Ridge - Huntingdon - Owens Corning 46 kV Lines | No role wording 46 kV |
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 29 |
Lewistown Area 46 kV Network | “Revise relay settings at Lewistown, Logan, Mount Union, Riverside, Warrior Ridge, and Yeagerstown Substation” |
| 2026-10-01* | SRRTEP Mid-Atlantic Penelec local plan submission for 2026 RTEP p. 29 |
Lewistown Area 46 kV Network | “Revise relay settings at Lewistown, Logan, Mount Union, Riverside, Warrior Ridge” |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 03 - Penelec Supplemental Projects p. 9 |
Valley REC Miller - Warrior Ridge 46 kV H Line Rebuild | “Replace relays, substation conductor, and the 46 kV circuit breaker at Warrior Ridge Substation.” 46 kV |
| 2026-06-16 | SRRTEP Mid-Atlantic Item 04 - Penelec Supplemental Projects p. 8 |
Valley REC Miller - Warrior Ridge 46 kV H Line Rebuild | No role wording 46 kV |
| 2026-03-18 | SRRTEP Mid-Atlantic Item 08 - Penelec Supplemental Projects p. 6 |
Lewistown Area 46 kV Network | “Revise relay settings at Lewistown, Logan, Mount Union, Riverside, Warrior Ridge, and Yeagerstown Substation” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.