Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
APSzone
138 kVkV as printed
2mentions

Also printed as: Washington Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Charleroi – Washington 138 kV Line
APS-2024-009, APS-2024-026 · s3459.1, s3460.1
Not printed $4.4M 12/06/2024 16.7 MW 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 109
Charleroi – Washington 138 kV Line “Replace limiting substation conductor and remove line trap at Washington Substation.”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 107
Charleroi – Washington 138 kV Line “Replace limiting substation conductor and remove line trap at Washington Substation.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this