Mentions: March 2025
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-03-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 3 |
AEP Transmission Zone: Baseline B3333 Cancellation B3333 |
Clell SS Clinch River Clinchfield Coal Creek Coronado substation New Garden Creek Horn Mountain SS Knox Creek SS Marvin SS Permac Salmon substation New Skeggs Branch Whetstone Branch Whitewood |
Status Cancelled Cost $40.171 M In service 6/1/2023 |
| 2025-03-14 | SRRTEP Western Item 02 - EKPC Supplemental Projects p. 3 |
Cynthiana, KY/Renaker, KY EKPC-2025-002 |
Cynthiana Junction Renaker |
No figures printed |
| 2025-03-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 3 |
ComEd-2025-004 | None named | Load 52 MW |
| 2025-03-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 5 |
ComEd-2025-003 | Devon Northwest Rosehill Skokie |
Status Engineering Cost $ 18.9 M In service 12/31/2026 |
| 2025-03-14 | SRRTEP Western Item 04 - DLCO Supplemental Project p. 3 |
Carson Substation Breakers DLC-2025-001 |
Carson Substation | Status Planning (Conceptual) Cost $1.6 M In service 12/31/2025 |
| 2025-03-14 | SRRTEP Western Item 04 - DLCO Supplemental Project p. 5 |
Dravosburg Substation Breaker DLC-2025-002 |
Dravosburg Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2025-03-14 | SRRTEP Western Item 04 - DLCO Supplemental Project p. 7 |
Findlay Substation Breaker DLC-2025-003 |
Findlay Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2025-03-14 | SRRTEP Western Item 04 - DLCO Supplemental Project p. 9 |
Neville Substation Breaker DLC-2025-004 |
Neville Substation | Status Planning (Conceptual) Cost $0.8 M In service 12/31/2025 |
| 2025-03-14 | SRRTEP Western Item 05 - ATSI Supplemental Project p. 3 |
Harper - West Akron 138 kV ATSI-2025-002 |
Harper West Akron |
Load 71 MW |
| 2025-03-14 | SRRTEP Western Item 05 - ATSI Supplemental Project p. 4 |
Black River - Johnson West 69 kV Switches ATSI-2025-011 |
Black River Johnson West |
No figures printed |
| 2025-03-14 | SRRTEP Western Item 05 - ATSI Supplemental Project p. 6 |
Bellevue-Groton 69 kV Line ATSI-2023-013 |
Bellevue Groton |
Status Preliminary Engineering Cost $10.1 M In service 06/01/2026 |
| 2025-03-14 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 3 |
Markley DEOK-2024-003 |
Markley | Status Engineering Cost $1,080,019 In service 12/11/2026 |
| 2025-03-14 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 5 |
Turfway DEOK-2024-004 |
Aero Constance Donaldson Limaburg Oakbrook Turfway New Woodspoint |
Status Scoping (Conceptual) Cost $13M In service 07-25-2029 |
| 2025-03-14 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 7 |
Wilder-Decoursey DEOK-2025-001 |
Beaver Claryville Decoursey White Tower Wilder |
Status Engineering Cost $7,210,650 In service 10/19/2027 |
| 2025-03-14 | SRRTEP Western Item 06 - DEOK Supplemental Projects p. 9 |
Sutton Ridge-Miami Fort DEOK-2024-008 |
Greendale Miami Fort Sutton Ridge |
Status Scoping (Conceptual) Cost $5.3M* In service 6/1/2032 |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 3 |
Misoperation Relay Projects APS-2025-006 |
Huntingdon Substation Springdale |
No figures printed |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 5 |
Misoperation Relay Projects APS-2025-007 |
Bedington Marlowe Substation |
No figures printed |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 7 |
Misoperation Relay Projects APS-2025-008 |
Hardy North Petersburg Substation |
No figures printed |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 9 |
Fairview – Whiteley 138 kV Line Switch APS-2025-010 |
Fairview Whiteley |
No figures printed |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 11 |
Black Oak – Junction 138 kV Line APS-2024-056 |
Black Oak Junction Substation |
Status Conceptual Cost $48.81 M In service 12/14/2029 |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 13 |
Arroyo – East Liverpool – Wylie Ridge 138 kV APS-2024-119 |
Arroyo East Liverpool Wylie Ridge Substation |
Status Engineering Cost $1.1 M In service 05/09/2025 |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 3 |
Trail Fork, WV AEP-2025-AP003 |
None named | In service March 2026 Load 7MW |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 4 |
Badger, OH AEP-2025-OH005 |
Badger | In service July 1, 2026 Load 279 MW |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 5 |
Lazelle, OH/Bush, OH AEP-2025-OH006 |
None named | In service Jan 31, 2026 Load 103 MW |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 7 |
Ormet, OH AEP-2024-OH040 |
Hannibal Kammer Ormet No.1 Stetson Run New |
Status Scoping (Conceptual) Cost $8.59 M In service 06/01/2026 Load 266MW |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 9 |
Kanawha County, WV AEP-2022-AP031, AEP-2023-AP022 |
Turner Station Ward Hollow 46 kV Station |
Status Scoping (Conceptual) Cost $33.1 M In service 08/01/2027 |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 13 |
Horizon, OH AEP-2024-OH046 |
Badger Fiesta Horizon New Jug St |
Status Engineering Cost $18.054 M In service 07/15/2026 Load approximately 300 MW |
| 2025-03-14 | SRRTEP Western Item 08 - AEP Supplemental Projects p. 15 |
Greenbrier County, WV AEP-2023-AP017 |
Glen Lyn Station Grandview Station Hinton Station |
Status Scoping (Conceptual) Cost $7.8 M In service 11/05/2029 |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3 |
DPL Transmission Zone: b3143 Scope and Cost Change b3143 |
Claymont Darley Edge Moor Linwood Naamans Silver Side Rd Silverside |
Status EP Cost $21M In service 10/31/2026 |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 02 - PSEG Supplemental Projects p. 3 |
Kenilworth Data Center, NJ PSEG-2024-0007 |
Galloping Hill Roselle Springfield Road Stanley Terrace Vauxhall |
Status Conceptual Cost $66.8M In service 06/01/2029 Load 60 MW |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 03 - PENELEC Supplemental Projects p. 3 |
SGC Tap - Summit 46 kV Line PN-2024-002 |
Ashville SGC Tap Summit |
Status Conceptual Cost $3.54 M In service 05/29/2026 |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 04 - MetEd Supplemental Projects p. 3 |
Orrtanna, PA/Lincoln, PA ME-2025-001 |
Lincoln Substation Orrtanna Substation |
Load 22 MVA |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 04 - MetEd Supplemental Projects p. 5 |
Middletown Jctn., PA/Campbelltown, PA/Middletown Jctn., PA/Campbelltown, PA ME-2019-009 |
Campbelltown Substation Middletown Junction Swatara Hill |
Status Conceptual Cost $25.4 M In service 12/31/2026 |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 05 - JCPL Supplemental Projects p. 3 |
Raritan River (Sayreville), NJ/Old Bridge, NJ JCPL-2025-001 |
Old Bridge Raritan River Substation |
Load 6 MVA |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 05 - JCPL Supplemental Projects p. 4 |
Traynor, NJ/Briant Park, NJ JCPL-2025-002 |
Briant Park Morris Court Substation Traynor |
Load 5 MVA |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 05 - JCPL Supplemental Projects p. 6 |
Oceanview – Bradley Beach 34.5 kV D130 Line Customer Connection JCPL-2024-046 |
Belmar Bradley Beach Oceanview |
Status Conceptual Cost $1.87 M In service 07/01/2026 Load 8.5 MVA |
| 2025-03-13 | SRRTEP Mid-Atlantic Item 05 - JCPL Supplemental Projects p. 8 |
Whippany, NJ/Montville, NJ/Greystone, NJ JCPL-2019-024 |
Alderney Davis Greystone Montville Morris Plains Morris Plains Tap Morristown Morristown Tap Tabor Tap Whippany |
Status Conceptual Cost $40.2 M In service 06/11/2027 |
| 2025-03-04 | TEAC Item 04 - ATSI Supplemental Project p. 3 |
Lemoyne Substation Upgrades for MISO Tranche 2.1 ATSI-2025-004 |
Lemoyne | Status Conceptual Cost $15.6 M In service 6/1/2032 |
| 2025-03-04 | TEAC Item 04 - ATSI Supplemental Project p. 5 |
Lallendorf Substation Upgrades for MISO Tranche 2.1 ATSI-2025-005 |
Lallendorf Substation | Status Conceptual Cost $5.9 M In service 6/1/2032 |
| 2025-03-04 | TEAC Item 05 - APS Supplemental projects p. 3 |
Eaglehead - Monocacy 230 kV Line APS-2025-003 |
Eaglehead Substation Monocacy Substation |
No figures printed |
| 2025-03-04 | TEAC Item 06 - JCPL Supplemental Projects p. 3 |
Whippany No. 12 230/115 kV Transformer JCPL-2024-019 |
Whippany | Status Conceptual Cost $8.1 M In service 03/07/2030 |
| 2025-03-04 | TEAC Item 06 - JCPL Supplemental Projects p. 5 |
Chester No. 4 230-34.5 kV Transformer JCPL-2024-021 |
Chester Substation | Status Conceptual Cost $7.3 M In service 12/31/2029 |
| 2025-03-04 | TEAC Item 06 - JCPL Supplemental Projects p. 7 |
Chester No. 1 230-34.5 kV Transformer JCPL-2024-003 |
Chester Substation Kittatinny Pohatcong West Wharton |
Status Conceptual Cost $7.3 M In service 11/12/2027 Load 30 MW |
| 2025-03-04 | TEAC Item 07 - Penelec Supplemental Projects p. 3 |
Glade Substation PN-2024-013 |
Forest Substation Glade Substation Lewis Run Substation Warren |
Status Conceptual Cost $12 M In service 12/17/2027 |
| 2025-03-04 | TEAC Item 08 - AEP Supplemental Projects p. 3 |
MISO Tranche 2 Projects AEP-2024-IM018 |
Babcock Batesville Dresser Fairbanks Fall Creek Green Acres Greentown Gwynneville New Hanna Jefferson Lulu Madison County New Olive Pike County New Rockport Sorenson Sullivan Sunnyside Tanners Creek University Park |
Status Scoping (Conceptual) Cost $173M In service 2032-2034 |
| 2025-03-04 | TEAC Item 09 - PPL Supplemental Projects p. 3 |
Hauto, PA PPL-2025-0002 |
None named | In service 05/2027 Load 350 MW |
| 2025-03-04 | TEAC Item 10 - PECO Supplemental Projects p. 3 |
PE-2025-001 | None named | No figures printed |
| 2025-03-04 | TEAC Item 10 - PECO Supplemental Projects p. 5 |
New Business Customer PE-2024-008 |
Bradford Planebrook Tredyffrin Upper Merion |
Status Conceptual Cost $7M In service 12/31/2026 (Phase 1), 12/31/2027 (Phase 2) Load 600MW |
| 2025-03-04 | TEAC Item 11 - ComEd Supplemental Projects p. 3 |
Dresden 345kV BT4-8 CB ComEd-2024-017 |
Dresden | Status Engineering Cost $2.7M In service 12/31/2026 |
| 2025-03-04 | TEAC Item 11 - ComEd Supplemental Projects p. 5 |
Customer in Plano ComEd-2024-015 |
Eldamain New LaSalle Plano |
Status Engineering Cost $40M In service 6/1/2029 Load 600 MW |
| 2025-03-04 | TEAC Item 11 - ComEd Supplemental Projects p. 7 |
MISO Tranche 2.1 Request ComEd 2024-023 |
Babcock Collins Green Acres Katydid Lakeview Nevada Olive Paris Pleasant Prairie Powerton University Park Woodford County New Zion |
Status Conceptual Cost $874.2M* In service 6/1/2034 |
| 2025-03-04 | TEAC Item 12 - Dominion Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0001 |
Trabue Substation | In service January 1, 2026 Load 100 MW |
| 2025-03-04 | TEAC Item 12 - Dominion Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental
Customer Load Request DOM-2025-0010 |
Enon substation | In service 03/01/2028 Load 100MW |
| 2025-03-04 | TEAC Item 12 - Dominion Supplemental Projects p. 6 |
Dominion Transmission Zone: Supplemental
230kV Line 2021 – EOL Rebuild DOM-2024-0025 |
Elizabeth City Shawboro |
Status Engineering Cost $30.6M In service 08/31/2025 |
| 2025-03-04 | TEAC Item 13 - EKPC Supplemental Projects p. 3 |
Mason County, KY EKPC-2025-001 |
None named | Load 2200 MW |
| 2025-03-04 | TEAC Item 14 - WVPA Supplemental Projects p. 3 |
Elderberry, IN/Stillwell, IN WVPA-2025-001 |
Elderberry Substation Stillwell substation |
In service 12/31/2028 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.