Lackawanna
Named in 12 PJM planning documents for 8 projects, from October 8, 2024 to October 6, 2026.
Also printed as: Lackawanna substation
PJM interconnection queue
A PJM queue substation page has the same name: Lackawanna (PA) — 7 queue requests filed, 4 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Pocono area Evaluation Progress | Not printed | $4.93 | 10/30/2027 | Not printed | 2024-11-06 TEAC |
| Lackawanna, PA PPL-2024-0015 · s3552 |
Conceptual | $6.3 M | 12/31/2026 | Not printed | 2025-10-08 TEAC |
| Callender Gap, PA PPL-2025-0005 |
Conceptual | $73.5 M | 05/30/2028 | 500 MW | 2026-10-06 TEAC |
| Big Bass, PA PPL-2025-0012 |
Conceptual | $186.875 M | 05/30/2028 | 1,500 MW | 2026-10-06 TEAC |
| Lackawana, PA PPL-2025-0013 |
Conceptual | $74.9 M | 07/30/2028 | 1,400 MW | 2026-10-06 TEAC |
| Archbald Mountain, PA PPL-2025-0014 |
Conceptual | $220 M | 05/30/2028 | 1,000 MW | 2026-02-03 TEAC |
| Callender Gap, PA PPL-2026-0002 |
Conceptual | $76.5 M | 05/30/2029 | 1,200 MW | 2026-05-08 TEAC |
| Tinker Tap Strengthening PPL-2026-0017 |
Conceptual | $34.6 M | 11/30/2029 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 05/2027 → 05/30/2028 | 2025-05-06 | 2025-06-05 |
| Substations named | CALLENDER GAP; HOPATCONG; LACKAWANNA; PAUPACK → CALLENDER GAP; LACKAWANNA; PAUPACK | 2025-06-05 | 2026-10-06 |
| In-service date | 05/2027 → 05/30/2028 | 2025-07-08 | 2025-09-09 |
| In-service date | 07/2028 → 07/30/2028 | 2025-09-09 | 2025-10-08 |
| In-service date | 05/2027 → 05/30/2028 | 2025-09-09 | 2026-02-03 |
| In-service date | 5/2028 → 05/30/2029 | 2026-03-10 | 2026-05-08 |
| Substations named | ELK MOUNTAIN; TINKER → ELK MOUNTAIN; GREENFIELD; TINKER | 2026-03-18 | 2026-04-14 |
| Substations named | ELK MOUNTAIN; GREENFIELD; TINKER → BROOKSIDE; ELK MOUNTAIN; GREENFIELD; LACKAWANNA; TINKER | 2026-04-14 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 15 |
Callender Gap, PA | “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in Bay #1 at Lackawanna 230kV Yard” 230kV |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 23 |
Lackawana, PA | “Replace one 230kV breaker and two MODs in Bay #3 at Lackawanna 230kV” 230kV |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27 |
Big Bass, PA | “Replace two 230kV breakers and four MODs in Bay #3 at Lackawanna 230kV” 230kV |
| 2026-10-06 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 93 |
Tinker Tap Strengthening | No role wording |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 15 |
Callender Gap, PA | “Install one new 230kV breaker, 230kV dead-end, and
ancillary equipment in Bay #1 at Lackawanna 230kV Yard” 230kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 23 |
Lackawana, PA | “Replace one 230kV breaker and two MODs in Bay #3 at
Lackawanna 230kV” 230kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 27 |
Big Bass, PA | “Replace two 230kV breakers and four MODs in Bay #3 at Lackawanna 230kV” 230kV |
| 2026-09-17* | SRRTEP Mid-Atlantic PPL local plan submission for 2026 RTEP p. 93 |
Tinker Tap Strengthening | No role wording 69kV |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 13 |
Lackawanna, PA | “replacement of the existing 230-69kV Lackawanna Transformer 2” 230-69kV |
| 2026-05-08 | TEAC Item 06 - PPL Supplemental Projects p. 10 |
Callender Gap, PA | “Install a +/-200MVAR STATCOM at Lackawanna 230kV yard” 230kV |
| 2026-02-03 | TEAC Item 07 - PPL Supplemental Projects p. 7 |
Archbald Mountain, PA | No role wording 500kV |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 12 |
Lackawanna, PA | “The Lackawanna substation 230/69kV Transformer 2 is about 32 years old and is considered high risk due to its material condition and maintenance history.” 230/69kV |
| 2025-10-08 | TEAC Item 09 - PPL Supplemental Projects p. 4 |
Lackawana, PA | “Replace one 230kV breaker and two MODs in Bay #3 at Lackawanna 230kV” 230kV |
| 2025-09-09 | TEAC Item 09 - PPL Supplemental Projects p. 10 |
Big Bass, PA | “Replace two 230kV breakers and four MODs in Bay #3 at Lackawanna 230kV” 230kV |
| 2025-06-05 | TEAC Item 05 - PPL Supplemental Projects p. 4 |
Callender Gap, PA | “Install one new 230kV breaker, 230kV dead end, and ancillary equipment in Bay #1 at Lackawanna 230kV Yard” 230kV |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 49 |
Pocono area Evaluation Progress | No role wording 500 kV |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 16 |
Lackawanna, PA | “in-kind replacement of the existing 230-69kV Lackawanna Transformer 2” 230-69kV |
| 2024-10-08 | TEAC Item 07 - PPL Supplemental Projects p. 7 |
Lackawanna, PA | No role wording 230/69kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.