Substation Scout

Morristown Tap

Named in 3 PJM planning documents for 1 project, from March 13, 2025 to October 8, 2025.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone M-3 Process Whippany, NJ/Montville, NJ/Greystone, NJ
JCPL-2019-024 · s3609.1
Not printed $20.1 M 06/11/2027 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $40.2 M → $20.1 M 2025-03-13 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 3
JCPL Transmission Zone M-3 Process Whippany, NJ/Montville, NJ/Greystone, NJ “Replace three existing line switches with 1200A MOAB switches at Morristown Tap”
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 3
JCPL Transmission Zone M-3 Process Whippany, NJ/Montville, NJ/Greystone, NJ “Replace three existing line switches with 1200A MOAB switches at Morristown Tap”
34.5 kV
2025-03-13 SRRTEP Mid-Atlantic
Item 05 - JCPL Supplemental Projects p. 8
JCPL Transmission Zone M-3 Process Whippany, NJ/Montville, NJ/Greystone, NJ “Replace three existing line switches with 1200A MOAB switches at Morristown Tap”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this