Bethel Park Substation

Named in 8 PJM planning documents for 4 projects, from December 13, 2024 to October 6, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
8mentions

Also printed as: Bethel Park

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Projects
APS-2024-098 · s3707.1
Not printed $4.5 7/27/2029 Not printed 2025-10-08
TEAC
Misoperation Relay Projects
APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118
Not printed Not printed Not printed Not printed 2024-12-13
SRRTEP Western
Misoperation Relay Projects
APS-2024-098 to APS-2024-100, APS-2025-015
Conceptual Not printed Not printed Not printed 2025-06-13
SRRTEP Western
Bethel Park, PA
APS-2025-026
Not printed Not printed Not printed Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BETHEL PARK; ST CLAIR → BETHEL PARK 2026-03-19 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 58
Bethel Park, PA “At Bethel Park Substation, the 138 kV breaker on the St. Clair line terminal was manufactured in 1956”
138 kV
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 58
Bethel Park, PA “At Bethel Park Substation, the 138 kV breaker on the St. Clair line terminal was manufactured in 1956”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 53
Misoperation Relay Projects “At Bethel Park Substation, replace circuit breaker”
138 kV
2026-03-19 SRRTEP Western
Item 01 - APS Supplemental Projects p. 8
Bethel Park, PA “At Bethel Park Substation, the 138 kV breaker on the St. Clair line terminal was manufactured in 1956”
138 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 53
Misoperation Relay Projects “At Bethel Park Substation, replace circuit breaker, disconnect switches”
138 kV
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 3
Bethel Park, PA “At Bethel Park Substation, the 138 kV breaker”
138 kV
2025-06-13 SRRTEP Western
Item 06 - APS Supplemental Projects p. 5
Misoperation Relay Projects “At Bethel Park Substation, replace circuit breaker”
138 kV
2024-12-13 SRRTEP Western
Item 15 - APS Supplemental Project p. 5
Misoperation Relay Projects No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.