Substation Scout

Metts Drive

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Newdescribed as
EKPCzone
161-25 kVkV as printed
2mentions

Described as new: “Construct a new Metts Drive 161-25 kV, 12/16/20 MVA distribution substation” — source, page 19

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Metts Dr
EKPC-2023-014 · s3172.0
Engineering $2.95M 7/1/2025 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named LEBANON; METTS DRIVE; SOUTH MARION COUNTY INDUSTRIAL → GREEN COUNTY; KU LEBANON SOUTH; LEBANON; MARION COUNTY; METTS DRIVE; SOUTH MARION COUNTY INDUSTRIAL; TAYLOR COUNTY 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
EKPC local plan submission of the supplemental projects for 2024 RTEP p. 19
Metts Dr “Construct a new Metts Drive 161-25 kV, 12/16/20 MVA distribution substation.”
161-25 kV
2024-10-08 TEAC
Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2024 p. 19
Metts Dr “Construct a new Metts Drive 161-25 kV, 12/16/20 MVA distribution substation”
161-25 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this