Substation Scout

North Temple

Named in 8 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
METEDzone
230 kV, 69 kVkV as printed
8mentions

Also printed as: North Temple Substation

PJM interconnection queue

A PJM queue substation page has the same name: North Temple (PA) — 6 queue requests filed, 1 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Muhlenberg 69 kV Substation
ME-2024-005 · s3976.1
Not printed $29.29M 10/22/2027 33 MW 2026-10-06
TEAC
Hosensack Substation
ME-2024-006
Conceptual $39.36 M 12/31/2030 Not printed 2026-10-06
TEAC
North Temple – Allentown Cement 69 kV Line Customer Connection
ME-2024-010 · s3434.1
Not printed $0.70M 6/1/2025 13 MVA 2024-10-08
TEAC
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA
ME-2024-023
Conceptual $21.57 M 12/31/2029 Not printed 2026-08-13
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2026 RTEP p. 17
Muhlenberg 69 kV Substation “Revise relay settings at North Temple, Carpenter Technology, and Lucent substations.”
2026-10-06 TEAC
Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 17
Muhlenberg 69 kV Substation “Revise relay settings at North Temple, Carpenter Technology, and Lucent substations”
2026-10-06 TEAC
Item 09 - MetEd Supplemental Projects - Presentation p. 4
Hosensack Substation “At North Temple Substation: Revise relay settings”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 33
North Temple – Allentown Cement 69 kV Line Customer Connection “Modify relay settings at North Temple and Allentown Cement substations”
69 kV
2026-08-13 SRRTEP Mid-Atlantic
Item 03 - MetEd Supplemental Projects p. 7
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA “At North Temple Substation, replace existing disconnect switches”
69 kV
2026-03-18 SRRTEP Mid-Atlantic
Item 07 - MetEd Supplemental Projects p. 8
Muhlenberg 69 kV Substation “Revise relay settings at North Temple, Carpenter Technology, and Lucent substations.”
69 kV
2024-11-14 SRRTEP Mid-Atlantic
Item 04 - MetEd Supplemental Projects p. 4
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA No role wording
69 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 33
North Temple – Allentown Cement 69 kV Line Customer Connection “Modify relay settings at North Temple and Allentown Cement substations”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.