Named in 8 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.
Also printed as: North Temple Substation
PJM interconnection queue
A PJM queue substation page has the same name: North Temple (PA) — 6 queue requests filed, 1 active.
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Muhlenberg 69 kV Substation ME-2024-005 · s3976.1 |
Not printed | $29.29M | 10/22/2027 | 33 MW | 2026-10-06 TEAC |
| Hosensack Substation ME-2024-006 |
Conceptual | $39.36 M | 12/31/2030 | Not printed | 2026-10-06 TEAC |
| North Temple – Allentown Cement 69 kV Line Customer Connection ME-2024-010 · s3434.1 |
Not printed | $0.70M | 6/1/2025 | 13 MVA | 2024-10-08 TEAC |
| Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA ME-2024-023 |
Conceptual | $21.57 M | 12/31/2029 | Not printed | 2026-08-13 SRRTEP Mid-Atlantic |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 17 |
Muhlenberg 69 kV Substation | “Revise relay settings at North Temple, Carpenter Technology, and Lucent substations.” |
| 2026-10-06 | TEAC Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 17 |
Muhlenberg 69 kV Substation | “Revise relay settings at North Temple, Carpenter Technology, and Lucent substations” |
| 2026-10-06 | TEAC Item 09 - MetEd Supplemental Projects - Presentation p. 4 |
Hosensack Substation | “At North Temple Substation: Revise relay settings” 230 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 33 |
North Temple – Allentown Cement 69 kV Line Customer Connection | “Modify relay settings at North Temple and Allentown Cement substations” 69 kV |
| 2026-08-13 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 7 |
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA | “At North Temple Substation, replace existing disconnect switches” 69 kV |
| 2026-03-18 | SRRTEP Mid-Atlantic Item 07 - MetEd Supplemental Projects p. 8 |
Muhlenberg 69 kV Substation | “Revise relay settings at North Temple, Carpenter Technology, and Lucent substations.” 69 kV |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 04 - MetEd Supplemental Projects p. 4 |
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA | No role wording 69 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 33 |
North Temple – Allentown Cement 69 kV Line Customer Connection | “Modify relay settings at North Temple and Allentown Cement substations” 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.