Substation Scout

Jenkins

Named in 10 PJM planning documents for 7 projects, from November 6, 2024 to October 6, 2026.

Existingdescribed as
PPLzone
230 kV, 230-69kV, 230/69 kV, 230kV, 69kVkV as printed
16mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Baseline MAAC PPL Cluster
b4029.1
Not printed $565.4M 6/1/2030 Not printed 2025-12-08
TEAC
Pocono area Evaluation Progress Not printed $4.93 10/30/2027 Not printed 2024-11-06
TEAC
Big Bass, PA
PPL-2025-0012
Conceptual $186.875 M 05/30/2028 1,500 MW 2026-10-06
TEAC
Bear Creek, PA
PPL-2025-0027
Conceptual $8 M 11/30/2028 Not printed 2026-10-06
TEAC
Dupont Substation Tap
PPL-2026-0019
Conceptual $0.9 M 11/30/2028 Not printed 2026-10-06
TEAC
Jenkins 230-69kV Transformer 4 Replacement
PPL-2026-0023
Conceptual $7.1 M 05/31/2029 Not printed 2026-10-06
TEAC
MAAC PPL Cluster
2025-W1-558
Not printed $565.4M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2025-07-08 2025-09-09
In-service date 11/2028 → 11/30/2028 2025-12-11 2026-02-12
Substations named BEAR CREEK → BEAR CREEK; JENKINS; PALOOKA 2025-12-11 2026-02-12
Substations named DUPONT → DUPONT; JENKINS; SCRANTON 2026-03-18 2026-05-14

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27
Big Bass, PA “Build out bay #2 at Jenkins 230kV yard”
230kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 45
Bear Creek, PA No role wording
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 62
Jenkins 230-69kV Transformer 4 Replacement “The Jenkins substation 230-69kV Transformer 4 is approximately 44 years old”
230-69kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 65
Dupont Substation Tap No role wording
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 27
Big Bass, PA “Build out bay #2 at Jenkins 230kV yard and install one new 230kV breaker, two MODs, and ancillary equipment”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 45
Bear Creek, PA No role wording
69kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 62
Jenkins 230-69kV Transformer 4 Replacement “replacement of the existing 230-69kV Jenkins Transformer 4”
230-69kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 65
Dupont Substation Tap No role wording
69kV
2026-05-14 SRRTEP Mid-Atlantic
Item 08 - PPL Supplemental Projects p. 12
Dupont Substation Tap No role wording
69kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 18
Jenkins 230-69kV Transformer 4 Replacement “in-kind replacement of the existing 230-69kV Jenkins Transformer 4”
230-69kV
2026-04-07 TEAC
Item 05 - PPL Supplemental Projects p. 4
Jenkins 230-69kV Transformer 4 Replacement “The Jenkins substation 230-69kV Transformer 4 is approximately 44 years old”
230-69kV
2026-02-12 SRRTEP Mid-Atlantic
Item 05 - PPL Supplemental Projects p. 12
Bear Creek, PA “Jenkins 69kV Substation”
69kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 28
PPL Transmission Zone: Baseline MAAC PPL Cluster “Station reconfiguration (Jenkins 230/69 kV Substation)”
230/69 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 54
MAAC PPL Cluster “Station reconfiguration (Jenkins 230/69 kV Substation)”
230/69 kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 10
Big Bass, PA “Build out bay #2 at Jenkins 230kV yard”
230kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 49
Pocono area Evaluation Progress No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.