Skokie
Named in 9 PJM planning documents for 4 projects, from November 15, 2024 to October 6, 2026.
Existingdescribed as
COMEDzone
138 kV, 338.25 kV, 345/138 kVkV as printed
9mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Change No Load Taps at 6 stations b3914.1 |
Not printed | $289 K | 4/15/2029 | Not printed | 2024-12-13 SRRTEP Western |
| ComEd Transmission Zone: Baseline Change No Load Taps at 6 stations | Not printed | $289 K | 4/15/2029 | Not printed | 2024-11-15 SRRTEP Western |
| Skokie 345/138 kV Transformer 82 ComEd-2024-021 · s3824 |
Engineering | Not printed | Not printed | Not printed | 2026-10-06 TEAC |
| Devon Hardening ComEd-2025-003 · s3726.1 |
Engineering | $ 18.9 M | 12/31/2026 | Not printed | 2025-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 2 |
Skokie 345/138 kV Transformer 82 | “345/138 kV autotransformer 82 at Skokie was installed in 1975” 345/138 kV |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 2 |
Skokie 345/138 kV Transformer 82 | “345/138 kV autotransformer 82 at Skokie was installed in 1975” 345/138 kV |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 28 |
Devon Hardening | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 28 |
Devon Hardening | No role wording 138 kV |
| 2025-08-05 | TEAC Item 08 - ComEd Supplemental Projects p. 4 |
Skokie 345/138 kV Transformer 82 | “Install a new 138 kV, 115.2 MVAR capacitor bank on 138 kV bus 1 at Skokie.” 345/138 kV |
| 2025-03-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 5 |
Devon Hardening | No role wording 138 kV |
| 2025-02-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 3 |
Devon Hardening | No role wording 138 kV |
| 2024-12-13 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 10 |
Change No Load Taps at 6 stations | “Change No-load Tap of 4 Autotransformers at Skokie” 338.25 kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 6 |
ComEd Transmission Zone: Baseline Change No Load Taps at 6 stations | “Change No-load Tap of 4 Autotransformers at Skokie” 338.25 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.