Substation Scout

Morgantown

Named in 1 PJM planning document for 2 projects, on Not reported.

Existingdescribed as
PEPCOzone
230kVkV as printed
2mentions

Also printed as: Morgantown substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Morgantown 230kV 6B Breaker Replacement
PEP-2023-018 · s3534.1
Engineering $810k 5/3/25 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Morgantown 230kV 6C Breaker Replacement
PEP-2023-019 · s3535.1
Engineering $810k 5/3/25 Not printed 2026-09-08*
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PEPCO local plan submission for 2024 RTEP p. 21
Morgantown 230kV 6B Breaker Replacement “230kV circuit breaker 6B at Morgantown substation was installed in 1967”
230kV
2026-09-08* SRRTEP Mid-Atlantic
PEPCO local plan submission for 2024 RTEP p. 23
Morgantown 230kV 6C Breaker Replacement “230kV circuit breaker 6C at Morgantown substation was installed in 1967”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this