Substation Scout

Smith Mountain

Named in 3 PJM planning documents for 3 projects, from November 4, 2025 to September 18, 2026.

Existingdescribed as
AEPzone
138 kVkV as printed
3mentions

PJM interconnection queue

A PJM queue substation page has the same name: Smith Mountain (VA) — 2 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline b4000.201 Scope Change
b4000.201
Not printed 1.4 M 6/1/2029 Not printed 2026-09-18
SRRTEP Western
AEP Transmission Zone: Baseline Cluster AEP-5
b4027.1
Not printed $9.879M 06/01/2029 Not printed 2025-12-08
TEAC
Cluster AEP-5
2025-W1-689
Not printed $9.879M 06/01/2029 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$0.4 M → 1.4 M 2026-09-18 2026-09-18

Every mention

DateDocumentProjectWhat the document says about it
2026-09-18 SRRTEP Western
Item 07 - SRRTEP West - Reliability Analysis Update Presentation p. 3
AEP Transmission Zone: Baseline b4000.201 Scope Change “Smith Mountain 138 kV Upgrade: Replace 795 KCM AAC”
138 kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 18
AEP Transmission Zone: Baseline Cluster AEP-5 “Replace the 2" IPS Sch. 40 conductor with 4" IPS Sch. 40 conductor at Smith Mountain station”
138 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 25
Cluster AEP-5 “Replace station conductor at Smith Mountain station”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.