Cyprus

Named in 11 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.

Newdescribed as
AEPzone
138 kV, 138kV, 345/138 kVkV as printed
13mentions

Described as new: “new 345 kV ring bus at Cyprus station” — source, page 51

Also printed as: Cyprus station

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cluster AEP-6
b3913.1
Not printed $33.113 M 4/30/2028 Not printed 2024-12-03
TEAC
AEP Transmission Zone: Supplemental s3440.3 Scope Change
AEP-2022-OH071 · s3440.3
Conceptual $77.4M 06/05/2027 675 MW 2026-10-06
TEAC
Columbus, Ohio
AEP-2023-OH089
Conceptual $2.635 M 10/01/2025 675 MW 2024-12-13
SRRTEP Western
Beatty, OH/Cyprus, OH
AEP-2026-OH001 · s3907.1-3
Engineering $5.218 M 09/01/2026 675 MW 2026-10-06
TEAC
Beatty, OH
AEP-2026-OH017
Not printed Not printed Q1 2031 675 MW 2026-04-15
SRRTEP Western
Cluster AEP-6
2024-W1-769
Not printed $33.113 M 4/30/2028 Not printed 2024-11-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$57.5M → $77.4M Not reported Not reported
Cost estimate $57.5M → $77.4M Not reported Not reported
Cost estimate $77.4M → $57.5M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$57.5M → $77.4M 2026-02-13 2026-02-13
Cost estimate $57.5M → $77.4M 2024-10-08 2026-02-13
Cost estimate
prior value printed on the same page
$57.5M → $77.4M 2026-10-06 2026-10-06
Substations named BEATTY; BIXBY; CANAL; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY → BEATTY; BIXBY; CYPRUS; MARION; PARSONS; SAINT CLAIR AVENUE; WAVERLY Not reported Not reported
Substations named BEATTY; BIXBY; CANAL; CYPRUS; MARION; PARSONS; WAVERLY → BEATTY; BIXBY; CANAL; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY 2026-10-06 Not reported
Substations named BEATTY; BIXBY; CANAL; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY → BEATTY; BIXBY; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY 2024-10-08 2026-02-13
Substations named BEATTY; BIXBY; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY → BEATTY; BIXBY; CANAL; CYPRUS; MARION; PARSONS; WAVERLY 2026-02-13 2026-10-06
In-service date Q2 2027 → 09/01/2026 2026-01-16 2026-03-19
Substations named CYPRUS → BEATTY; BIXBY; CYPRUS 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 51
AEP Transmission Zone: Supplemental s3440.3 Scope Change “originally developed (s2526) to serve 675 MW”
345/138 kV
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 57
Beatty, OH/Cyprus, OH “build out the 9th partial string in the breaker and half bus”
138 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 51
AEP Transmission Zone: Supplemental s3440.3 Scope Change “new 345 kV ring bus at Cyprus station”
345/138 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 58
Beatty, OH/Cyprus, OH “build out the 9th partial string in the breaker and half bus, installing 3-138kV circuit breakers”
138 kV
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 108
AEP Transmission Zone: Supplemental s3440.3 Scope Change “new 345 kV ring bus at Cyprus station”
345/138 kV
2026-04-15 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 10
Beatty, OH No role wording
2026-03-19 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 9
Beatty, OH/Cyprus, OH “At Cyprus station, build out the 9th partial string”
138 kV
2026-02-13 SRRTEP Western
Item 02 - AEP Supplemental Projects p. 3
AEP Transmission Zone: Supplemental s3440.3 Scope Change “Cyprus is the station that was originally developed (s2526) to serve 675 MW of demand with room for 345 kV expansion”
345/138 kV
2026-01-16 SRRTEP Western
Item 01 - AEP supplemental projects p. 7
Beatty, OH/Cyprus, OH No role wording
2024-12-13 SRRTEP Western
Item 17 - AEP Supplemental Projects p. 16
Columbus, Ohio “At Cyprus 138kV station”
138kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 38
Cluster AEP-6 “between Beatty Road and Cyprus stations”
138 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 29
Cluster AEP-6 “Reconfigure the 138 kV lines into Cyprus station”
138 kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 108
AEP Transmission Zone: Supplemental s3440.3 Scope Change “to a new 345 kV ring bus at Cyprus station”
345/138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.