Named in 5 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
230/115/13.2 kV, 230kVkV as printed
5mentions

Also printed as: Farmville Sub

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Replace Farmville TX#5 - DEV
DOM-2022-0023 · s3041
Engineering $6.4 M 12/31/2024 Not printed 2024-10-08
TEAC
Dominion Transmission Zone: Supplemental Zeus 230kV Delivery - DEV
DOM-2025-0020
Engineering $256M Stage1 - Q3 2027, Stage 2 - Q4 2030 300 MW 2026-10-06
TEAC
Equipment Material Condition, Performance and Risk
DOM-2026-0019
Conceptual $96M 07/30/2030 Not printed 2026-09-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date May 2029 → Stage1 - Q3 2027, Stage 2 - Q4 2030 2025-05-06 2026-10-06
Substations named SOUTH CREEK → FARMVILLE; PAMPLIN; SOUTH CREEK; WILLOW BROOK DP; ZEUS 2025-05-06 2026-10-06
Substations named BREMO; FARMVILLE → BREMO; FARMVILLE; FORK UNION 2026-05-08 2026-09-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 14 - DOM Supplemental Projects - Presentation p. 8
Dominion Transmission Zone: Supplemental Zeus 230kV Delivery - DEV “Farmville substation to be expanded”
230kV
2026-09-08 TEAC
Item 10 - DOM Supplemental Projects p. 8
Equipment Material Condition, Performance and Risk “rebuild the existing #298 transmission line from Farmville to Bremo Substation”
2026-09-08* SRRTEP Southern
Dominion p. 30
Replace Farmville TX#5 - DEV “Replace Farmville TX#5 with a new three-phase, 230/115/13.2 kV, 168 MVA unit.”
230/115/13.2 kV
2026-05-08 TEAC
Item 09 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 30
Replace Farmville TX#5 - DEV “Replace Farmville TX#5 with a new three-phase, 230/115/13.2 kV, 168 MVA unit”
230/115/13.2 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.