Named in 3 PJM planning documents for 3 projects, from October 8, 2024 to April 15, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Projects
APS-2023-075, APS-2023-079 to APS-2023-084, APS-2023-086, APS-2023-087 · s3194.1, s3195.1, s3196.1, s3197.1, s3198.1, s3199.1, s3200.1, s3201.1, s3202.1
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2023-082, APS-2023-083, APS-2023-084 · s3198.1, s3199.1, s3200.1
Not printed Not printed Not printed Not printed 2026-09-08*
SRRTEP Western
Saltsburg 138 kV Substation
APS-2026-009
Not printed Not printed Not printed 11 MW 2026-04-15
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALL LUDLUM 4 JCT; ALLENPORT; ARMSTRONG; BRACKEN JCT; BREDINVILLE; BURMA; BUTLER; CABOT; CABREY JCT; CHARLEROI; DUPONT; EASTGATE T; EDGELAWN; FAIRVIEW; GRANT TOWN; LARKMEAD; LOYALHANNA; LUXOR; RIVESVILLE; SALTSBURG; SPRINGDALE; VANDERGRIFT; YOUNGWOOD; YUKON → BREDINVILLE; BUTLER; CABOT; SPRINGDALE 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 74
Misoperation Relay Projects “At Vandergrift, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying”
138 kV
2026-04-15 SRRTEP Western
Item 02 - APS Supplemental Project p. 4
Saltsburg 138 kV Substation No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 74
Misoperation Relay Projects “At Vandergrift, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying”