Our tools read far more than they show. A Substation Expansion Tracker entry is one substation named in one deck, but the deck behind it often carries much more: maps of the local system, the reasons a utility gives for the work, and the other projects planned in the same area. Someone looking at one utility's territory can use the whole document, not just the line we took from it.
This page lists those documents in one place. Each row links to the original file on the publisher's site, gives the date it carries, and says what we extracted from it and which of our pages uses it.
Documents, newest first
703 documents
| Date | Document | Operator / utility | What’s in it | Used by |
|---|---|---|---|---|
| 2026-12-01 | Item 02 - JCPL Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-11-23 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's presentation for the JCPL Transmission Zone outlines need JCPL-2026-060 regarding aging oil circuit breakers, circuit switchers, capacitor banks, and terminal equipment limits at the Red Bank Substation. It includes an area map and transformer ratings.‡ Extracted: Names 1 substation: Red Bank. 1 project. |
Substation Expansions: JCPL |
| 2026-12-01 | Item 03 - AEP Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-11-23 |
PJM AEP · American Electric Power |
AEP presents supplemental projects across Carroll County, Mason County, Granger, Flatlick, Boyd County, Franklin Furnace, Putnam County, Lima, Findlay, and Van Wert. Work details include customer service connections, breaker replacements, transmission line rebuilds, new substations, and STATCOM installations, accompanied by area maps, bubble diagrams, cost estimates, and ratings tables.‡ Extracted: Names 37 substations: Althea Station, Baker, Bonzo Switch, Bosc 1A & 1B (CUSTOMER), Bosc 2A & 2B (CUSTOMER), Culloden and 31 more. 8 projects, 5 with a printed cost estimate, 7 with a printed customer load (1,000 MW, 1,080 MW, 852 MW, 1000 MW, …). |
Substation Expansions: AEP |
| 2026-12-01 | Item 04 - EKPC Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-11-23 |
PJM EKPC · East Kentucky Power Cooperative |
The utility's 1, 2026 TEAC presentation presents need EKPC-2026-007 for a new customer load connection in Carroll County, KY, ramping from 7 MW up to 720 MW by 6/2032. The document includes an area map and an M-3 process meeting schedule.‡ Extracted: No substation names extracted. 1 project, 1 with a printed customer load (720 MW). |
Substation Expansions: EKPC |
| 2026-12-01 | Item 05 - PPL Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-11-23 |
PJM PPL · PPL Electric Utilities |
PPL Transmission Zone's presentation outlines supplemental customer service projects near Berwick, PA and Allenwood, PA, alongside the Tamarack 500-230kV Substation and Elimsport 230kV Lines projects. It includes area maps, single-line schematics, switchyard installations, line rebuilds, customer lead lines, ratings, and cost estimates.‡ Extracted: Names 9 substations: Acahela, Big Bass, Elimsport, Orefield, Sandy Run, Sunbury and 3 more. 3 projects, 2 with a printed cost estimate, 3 with a printed customer load (600 MW, 700 MW, 300 MW). |
Substation Expansions: PPL |
| 2026-12-01 | Item 06 - PECO Supplemental Projects Presentation Supplemental projects deck · TEAC · retrieved 2026-11-23 |
PJM PECO · PECO Energy |
PECO's supplemental projects presentation from December 1, 2026, presents an environmental flood risk need at Macdade and proposed solutions including the 220-15 Plymouth Meeting – Whitpain line rebuild and circuit breaker replacements at Trainer and Linton. The document includes area maps, single-line diagrams, ratings comparisons, estimated transmission costs, and project schedules.‡ Extracted: Names 5 substations: Linton, Macdade, Plymouth Meeting, Trainer, Whitpain. 4 projects, 3 with a printed cost estimate. |
Substation Expansions: PECO |
| 2026-12-01 | Item 07 - DOM Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-11-23 |
PJM DOM · Dominion Energy Virginia |
The utility's 1, 2026 Transmission Expansion Advisory Committee presentation covers needs and scope/cost changes across Alexandria County and other areas. It includes transmission line rebuilds, transformer replacement, distribution additions, line extensions, and Do No Harm analysis updates, alongside problem statements, area maps, system diagrams, and cost and schedule estimates.‡ Extracted: Names 9 substations: Davis Drive, Dulles, Global Plaza, Hayfield, Low Moor, North Alexandria substation and 3 more. 4 projects, 1 with a printed cost estimate, 1 with a printed customer load (41 MW). |
Substation Expansions: DOM |
| 2026-11-23† | BPA Interconnection Queue workbook (InterconnectionQueueOutput.xlsx) Queue data file · retrieved 2026-11-23 |
BPA Whole region |
1,010 generation requests in the latest fetch, 314 active. The same workbook lists 464 large-load requests. Workbook refreshed daily. | Queue Wire · BPA Large Load Registry Site Scanner reports |
| 2026-11-23† | PJM Cycle Service Request Status (TC1/TC2/C01 export) Queue data file · retrieved 2026-11-23 |
PJM Whole region |
1,792 projects in the latest fetch, merged with the serial export into 10,138 projects, 2,704 active. Updated continuously; source regenerated on demand. | Queue Wire · PJM Site Scanner reports |
| 2026-11-23† | PJM Serial Service Request Status (queue export, PlanningQueues.xml) Queue data file · retrieved 2026-11-23 |
PJM Whole region |
9,263 projects in the latest fetch, merged with the cycle export into 10,138 projects, 2,704 active. Updated continuously; source regenerated on demand. | Queue Wire · PJM Site Scanner reports |
| 2026-11-13 | Item 01 - SRRTEP West - Reliability Analysis Update Presentation Reliability analysis update · SRRTEP Western · retrieved 2026-11-16 |
PJM AEP · American Electric Power DEOK · Duke Energy Ohio and Kentucky AMPT · AMP Transmission APS · Allegheny Power (FirstEnergy) ATSI · American Transmission Systems (FirstEnergy) EKPC · East Kentucky Power Cooperative |
A committee presentation on baseline reliability and short circuit projects across the AEP, DEOK, AMPT, APS, ATSI, and EKPC zones. Proposed work includes line rebuilds, conductor replacements, capacitor bank installations, a transformer replacement, MOT increase, and circuit breaker replacements, accompanied by problem statements, estimated costs, in-service dates, and area maps.‡ Extracted: Names 51 substations: Athens, Beatty, Bentonville, Bethlen Substation, Bexley, Bockoven Switch and 45 more. 29 projects, 29 with a printed cost estimate. |
Substation Expansions: AEP, DEOK, AMPT, APS, ATSI, EKPC |
| 2026-11-13 | Item 02 - AEP Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-11-09 |
PJM AEP · American Electric Power |
AEP presents supplemental transmission needs and solutions for Wheeling, Coshocton, Pickaway County, and Mason County, covering a canceled relocation need, customer load connections, line rebuilds, station expansions, cost estimates, in-service dates, and bubble diagrams.‡ Extracted: Names 14 substations: Circleville, Endor, Good Hope Switch, Grace, Harrison, Lemaster and 8 more. 6 projects, 2 with a printed cost estimate, 4 with a printed customer load (75 MW, 1,080 MW, 25 MW, 135 MW). |
Substation Expansions: AEP |
| 2026-11-13 | Item 03 - AMPT Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-11-09 |
PJM AMPT · AMP Transmission |
The transmission utility presents solutions for supplemental projects in Edgerton, Genoa, and the Danville area. It details substation expansions, line rebuilds, circuit additions, and terminal work, accompanied by geographic maps, one-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 13 substations: Brantly, Bryan, Danville, E Danville, E Monument, Edgerton and 7 more. 3 projects, 3 with a printed cost estimate, 1 with a printed customer load (6.5 MW). |
Substation Expansions: AMPT |
| 2026-11-13 | Item 04 - APS Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-11-09 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 10 substations: AEC, Donegal, Enlow, Franklin Substation, Gordonsville, North Fayette and 4 more. 6 projects, 2 with a printed cost estimate. | Substation Expansions: APS |
| 2026-11-13 | Item 05 - ATSI Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-11-09 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy's presentation for the ATSI Transmission Zone outlines needs and solutions for the Hamilton-Horizon line, other transmission lines, plus Chittenden and Jordan substations and a Maysville-McDowell line rebuild. The slides detail project drivers, customer connections, conductor upgrades, cost estimates, in-service dates, area maps, and single-line system diagrams.‡ Extracted: Names 17 substations: BP Husky Substation, Chittenden Substation, Fort Industry Substation, Fort Industry Tap Substation, Greenville, Hartstown substations and 11 more. 6 projects, 5 with a printed cost estimate, 2 with a printed customer load (approximately 22 MW, approximately 56 MW). |
Substation Expansions: ATSI |
| 2026-11-13 | Item 06 - DEOK Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-11-09 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio & Kentucky presents M-3 Solutions Meeting proposals for the DEOK transmission zone, covering the retirements of the US_PO_SH and XTEK 69 kV substations and taps in Ohio. The presentation includes problem statements, proposed solutions, estimated costs, proposed in-service dates, geographic maps, and one-line diagrams.‡ Extracted: Names 6 substations: Allen, Kemper, US Postal, US_PO_SH, Wyscarver, Xtek. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: DEOK |
| 2026-11-13 | Item 07 - EKPC Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-11-09 |
PJM EKPC · East Kentucky Power Cooperative |
A presentation addresses load growth and overloads near Lake Cumberland and Russell County, KY. It details proposed new 161/12.47 kV distribution substations and 161 kV tap lines for Eli and Prather Road, providing problem statements, cost estimates, in-service dates, ratings, simplified one-line diagrams, and area maps.‡ Extracted: Names 7 substations: Cooper, Eli, Prather Road, Russell County, Salem, South Oakhill and 1 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (3 MW). |
Substation Expansions: EKPC |
| 2026-11-12 | Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update Presentation Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM BGE · Baltimore Gas and Electric DPL · Delmarva Power Penelec · Penelec (FirstEnergy) JCPL · Jersey Central Power & Light (FirstEnergy) |
An update outlines 2026 RTEP baseline reliability project proposals across the BGE, DPL, Penelec, and JCPL transmission zones, plus a cancellation. The presentation covers line rebuilds, cable reconductoring, bus and switch upgrades, and circuit breaker replacements at Raystown, Manitou, Morris Park, and Newton, accompanied by area maps, cost estimates, and ratings.‡ Extracted: Names 14 substations: Conaway, Concord St, Constitution St, Indian River, Loretto, Manitou and 8 more. 10 projects, 10 with a printed cost estimate. |
Substation Expansions: BGE, DPL, Penelec, JCPL |
| 2026-11-12 | Item 02 - JCPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-09 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's presentation for the JCPL Transmission Zone proposes relocating 0.33 miles of the Jerseyville - Smithburg line structures and 0.28 miles of double circuit line structures along Route 33. The document includes a problem statement, line ratings, cost estimate, projected in-service date, and an area map.‡ Extracted: Names 5 substations: Englishtown, Freneau, Jerseyville, Nestle, Smithburg. 1 project, 1 with a printed cost estimate. |
Substation Expansions: JCPL |
| 2026-11-12 | Item 02 - SRRTEP South - Reliability Analysis Update Presentation Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM DOM · Dominion Energy Virginia |
A committee presentation addresses baseline reliability issues in the transmission zone at Bell Avenue, Farmville – Willis Mt, Gladys Tap, and Trowbridge. It details proposed breaker additions, switch and lead upgrades, tap point relocation, and a capacitor bank installation alongside area maps, violation lists, and estimated costs.‡ Extracted: Names 12 substations: AE2-283 Tap, Altavista, Bakers Pond, Bell Ave, Farmville, Gladys Tap and 6 more. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: DOM |
| 2026-11-12 | Item 03 - JCPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
The utility's transmission zone presentation addresses the need for line structure relocations along the State Route 33 corridor due to NJDOT upgrades. It covers the Jerseyville - Smithburg, Freneau - Jerseyville, and Englishtown - Jerseyville 34.5 kV lines, providing problem descriptions, line ratings, an area map, a one-line diagram, and cost estimates.‡ Extracted: Names 5 substations: Englishtown, Freneau, Jerseyville, Nestle, Smithburg. 1 project, 1 with a printed cost estimate. |
Substation Expansions: JCPL |
| 2026-11-12 | Item 03 - MetEd Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-09 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd Transmission Zone covers an equipment condition need on the South Lebanon - Third and Green 69 kV Line. It also presents proposed solutions for bus conversion at North Boyertown Substation and a new customer connection tapping the Carsonia - Lyons - North Boyertown 69 kV 75 Line, including cost estimates and area maps.‡ Extracted: Names 9 substations: Carsonia, East Topton, Fifth and Green, Lyons, North Boyertown, Ringing Rocks and 3 more. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (13 MW). |
Substation Expansions: Met-Ed |
| 2026-11-12 | Item 04 - MetEd Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd Transmission Zone details need ME-2026-005 for line condition repairs on the South Lebanon - Third and Green 69 kV Line, alongside proposed solutions for breaker conversions at North Boyertown Substation (ME-2024-024) and a customer connection on the Carsonia - Lyons - North Boyertown 69 kV Line (ME-2026-008).‡ Extracted: Names 9 substations: Carsonia, East Topton, Fifth and Green, Lyons, North Boyertown, Ringing Rocks and 3 more. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (13 MW). |
Substation Expansions: Met-Ed |
| 2026-11-12 | Item 04 - PPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-09 |
PJM PPL · PPL Electric Utilities |
PPL's presentation for the committee covers needs and solutions for the Sunbury, Meckesville, Hickory Run, Pocono-Jackson, Twin Lakes, and Varden facilities. Projects include serving customer load, line extensions, pole replacements, reconductoring, and a double-circuit rebuild, supported by area maps, line diagrams, and estimated costs.‡ Extracted: Names 12 substations: Acahela, East Palmerton, Hickory Run, Honesdale, Jackson, Lackawanna and 6 more. 6 projects, 5 with a printed cost estimate, 1 with a printed customer load (125MW). |
Substation Expansions: PPL |
| 2026-11-12 | Item 05 - PPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM PPL · PPL Electric Utilities |
PPL's presentation covers customer service, reliability, and asset condition needs and proposed solutions. It details line tap extensions, line rebuilding to double circuit, and wood pole replacements for Sunbury, Meckesville, Hickory Run, Pocono-Jackson, Twin Lakes, and Varden, accompanied by area maps, line diagrams, costs, and in-service dates.‡ Extracted: Names 11 substations: Acahela, East Palmerton, Hickory Run, Honesdale, Jackson, Lackawanna and 5 more. 6 projects, 5 with a printed cost estimate, 1 with a printed customer load (125 MW). |
Substation Expansions: PPL |
| 2026-11-12 | Item 05 - PSEG Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-09 |
PJM PSEG · PSE&G |
PSE&G's presentation covers supplemental project need PSEG-2026-0003 in the Cherry Hill Area. It details plans to construct a new 69kV substation, reconfigure and build 69kV lines, and replace equipment, accompanied by an aerial map, network diagrams, and cost estimates.‡ Extracted: Names 7 substations: Camden, Cherry Hill Station, Hilltop, Lawnside, Maple Shade, Runnemede Station and 1 more. 1 project, 1 with a printed cost estimate. |
Substation Expansions: PSEG |
| 2026-11-12 | Item 06 - DPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-09 |
PJM DPL · Delmarva Power |
The presentation for the Mid-Atlantic Sub Regional RTEP Committee identifies need DPL-2026-005 regarding aging 69 kV disconnect switches requiring frequent maintenance at West substation. The document includes an area map and an M-3 process schedule table.‡ Extracted: Names 1 substation: West substation. 1 project. |
Substation Expansions: DPL |
| 2026-11-12 | Item 06 - PSEG Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM PSEG · PSE&G |
PSE&G's solutions presentation covers the Cherry Hill Area (Need Number: PSEG-2026-0003). It presents proposals to construct a new 69kV substation, install transformers, and build or reconfigure 69kV lines connecting Camden, Maple Shade, Hilltop, Runnemede Station, Lawnside, and Sharp Rd, supported by an area map, diagram, and cost estimates.‡ Extracted: Names 5 substations: Camden, Cherry Hill Station, Hilltop, Maple Shade, Runnemede Station. 1 project, 1 with a printed cost estimate. |
Substation Expansions: PSEG |
| 2026-11-12 | Item 07 - DPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM DPL · Delmarva Power |
A transmission zone presentation for the Mid-Atlantic Sub Regional RTEP Committee outlines need DPL-2026-005 regarding recurring hotspots on 69 kV disconnect switches at West substation. The document includes a system area map, an M-3 process schedule, and instructions for stakeholder comments.‡ Extracted: Names 1 substation: West substation. 1 project. |
Substation Expansions: DPL |
| 2026-11-12 | Item 07 - PECO Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-09 |
PJM PECO · PECO Energy |
PECO's presentation covers supplemental project solutions for circuit breaker replacement at Master and disconnect switch removal along the 69kV 6610 line between Burholme and Byberry. It includes problem statements, proposed solutions, rating tables, estimated transmission costs, in-service dates, geographic maps, and single-line diagrams.‡ Extracted: Names 3 substations: Burholme, Byberry, Master. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: PECO |
| 2026-11-12 | Item 08 - PECO Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-11-16 |
PJM PECO · PECO Energy |
The utility's 12, 2026 supplemental projects presentation outlines solutions for replacing circuit breaker 825 at Master substation and removing disconnect switches on the 69kV 6610 line between Burholme and Byberry. It includes problem statements, cost estimates, in-service dates, rating tables, area maps, and single-line diagrams.‡ Extracted: Names 3 substations: Burholme, Byberry, Master. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: PECO |
| 2026-11-03 | Item 05 - PPL Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-26 |
PJM PPL · PPL Electric Utilities |
PPL Transmission Zone's presentation details customer-driven supplemental projects in Berwick and Lancaster, PA, alongside a load request for Big Bass / Tamarack. It features proposed solutions including new switchyards, line bifurcations, rebuilds, and breaker replacements, accompanied by geographic maps, one-line diagrams, line ratings, and estimated project costs.‡ Extracted: Names 13 substations: Beach Haven, Engleside, Glen Brook, Greenland, Lampeter, Millwood and 7 more. 3 projects, 2 with a printed cost estimate, 3 with a printed customer load (1,500 MW, 350 MW, 700MW). |
Substation Expansions: PPL |
| 2026-11-03 | Item 06 - BGE Supplemental projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-26 |
PJM BGE · Baltimore Gas and Electric |
A utility presentation for supplemental projects notes the withdrawal of a need for a customer in Calvert County, MD, within the local electric cooperative's service territory requesting 190 MW in 2028 and 880 MW in 2030.‡ Extracted: No substation names extracted. 1 project, 1 with a printed customer load (880 MW). |
Substation Expansions: BGE |
| 2026-11-03 | Item 07 - UGI Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-26 |
PJM UGI · UGI Utilities |
UGI Transmission Zone's presentation for the Transmission Expansion Advisory Committee outlines supplemental project needs for the Mountain #1 and Mountain #2 230kV transformer replacements, along with associated electromechanical relaying, 1972 vintage circuit switchers, and modern oil containment pits. The document includes problem statements and area maps.‡ Extracted: Names 1 substation: Mountain. 2 projects. |
Substation Expansions: UGI |
| 2026-11-03 | Item 08 - DOM Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-26 |
PJM DOM · Dominion Energy Virginia |
Dominion Energy's presentation to the Transmission Expansion Advisory Committee covers King George County, Fredericksburg VA, Spotsylvania County, and Prince William County. It presents cancelled customer load requests, equipment replacements at North Anna Substation, and solutions including GIS design, line rebuilds, and substation tapping, accompanied by geographic maps and one-line diagrams.‡ Extracted: Names 11 substations: Belvedere, Braddock, Freight, Hayfield, Locomotive, North Anna and 5 more. 7 projects, 2 with a printed cost estimate, 5 with a printed customer load (100 MW, 100 MW, 285 MW, 210.0 MW, …). |
Substation Expansions: DOM |
| 2026-11-03 | Item 09 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-11-02 |
PJM PJM · PJM system-wide |
The presentation for the Transmission Expansion Advisory Committee reviews 2026 RTEP Window 1 proposals and cost and schedule updates for Valley Link Transmission's 2024 Window #1 projects. It includes proposal lists, timeline and cost charts, summary tables detailing scope and in-service date revisions, and draft proposal route maps.‡ Extracted: Names 13 substations: Amos, Aspen, Doubs, Goose Creek, Joshua Falls, Morrisville and 7 more. 1 project, 1 with a printed cost estimate. |
Substation Expansions: PJM |
| 2026-11-02 | ERCOT Generation Interconnection Status (GIS) Report Queue data file · retrieved 2026-11-23 |
ERCOT Whole region |
2,068 projects in the latest fetch, 1,798 active. Published monthly; data can be up to ~30 days old. | Queue Wire · ERCOT Site Scanner reports |
| 2026-10-22* | ACE local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-26 |
PJM ACE · Atlantic City Electric |
The utility's presentation for the ACE Transmission Zone presents a supplemental project in the Penns Grove, NJ area. It details customer load connection and load growth needs, a temporary 69kV feed, and a new 69kV ring bus substation bisecting the Beckett – Churchtown line, supported by an area map, phase diagrams, and cost estimates.‡ Extracted: Names 2 substations: Beckett, Churchtown. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (40 MW). |
Substation Expansions: ACE |
| 2026-10-16 | Item 01 - ACE Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
The utility's presentation for the local transmission zone presents an M-3 process need (ACE-2026-004) to address risk of failure from a manufacturing defect on an underground segment of the kV 1401 England – Merion line. The document includes a transmission system map.‡ Extracted: Names 2 substations: England, Merion. 1 project. |
Substation Expansions: ACE |
| 2026-10-16 | Item 01 - APS Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the APS Transmission Zone details supplemental project needs and proposed solutions, including transmission line rebuilds, structure replacements, relay upgrades, and a 200 MW new customer connection. It covers facilities such as Albright, Pruntytown, French Creek, Sutton, Belmont, Long Reach, Burma, Ridgway, and Reid, accompanied by area maps, line diagrams, and cost estimates.‡ Extracted: Names 24 substations: Albright Substation, Bedington, Belmont, Black Oak, Burma, Cecil and 18 more. 10 projects, 3 with a printed cost estimate, 1 with a printed customer load (approximately 200 MW). |
Substation Expansions: APS |
| 2026-10-16 | Item 02 - ATSI Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy's presentation for the ATSI Transmission Zone outlines needs and solutions for the Carlisle-Shinrock, Clark-Greene, and Old Plank 69 kV lines, Westgate Station, and new customer connections near Ontario and Ford Brookpark stations. It details equipment replacements, line additions, new stations, area maps, bubble diagrams, ratings, cost estimates, and projected in-service dates.‡ Extracted: Names 29 substations: Allen Junction Substation, Avon, Carlisle, Cascade, Cedar Street, Clark and 23 more. 6 projects, 4 with a printed cost estimate, 2 with a printed customer load (10 MW, 60 MW). |
Substation Expansions: ATSI |
| 2026-10-16 | Item 02 - DPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
The utility's 15, 2026 presentation for the DPL transmission zone outlines supplemental project needs and solutions, including an additional transformer at Brandywine and relay upgrades at Carrcroft and Oak Hall. The document contains area maps, facility diagrams, estimated costs, in-service dates, and facility rating tables.‡ Extracted: Names 6 substations: Brandywine, Carrcroft, Edgemoor, Oak Hall, Silverside, Tasley. 3 projects, 2 with a printed cost estimate. |
Substation Expansions: DPL |
| 2026-10-16 | Item 03 - AEP Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
AEP presents needs and solutions for the sub-regional transmission planning process, including transmission and distribution delivery points in Franklin Furnace and at Bolton, substation and line rebuild work at Reno Switch - Mill Creek, Pittsburgh Avenue, Reedy Creek, and Salamonie - Burr Oak. Slides include geographic maps, one-line diagrams, cost estimates, and an M-3 process schedule.‡ Extracted: Names 21 substations: Belmont, Bluff Point, Bolton, Burr Oak, Duck Creek, Jay and 15 more. 7 projects, 1 with a printed cost estimate, 1 with a printed customer load (20MW). |
Substation Expansions: AEP |
| 2026-10-16 | Item 03 - PECO Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
The utility's supplemental projects presentation outlines need statements for circuit breaker replacements at Plymouth and Master, as well as disconnect switch work on the line between Burholme and Byberry. The document includes problem drivers and area maps for each project need.‡ Extracted: Names 4 substations: Burholme, Byberry, Master, Plymouth. 3 projects. |
Substation Expansions: PECO |
| 2026-10-16 | Item 04 - BGE Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
A utility presentation for the BGE Transmission Zone addresses the Jennifer Rd to Cedar Park wood pole project (BGE-2025-008). It details rebuilding 1.85 miles of 115 kV circuit 110544 with steel poles and ACSS conductor, including an estimated cost, projected in-service date of 12/31/2027, an alternative considered, and area maps.‡ Extracted: Names 3 substations: Bestgate, Cedar Park, Jennifer Rd. 1 project, 1 with a printed cost estimate. |
Substation Expansions: BGE |
| 2026-10-16 | Item 04 - ComEd Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
A transmission zone presentation details proposed solutions for projects in Butterfield, Glen Ellyn Tap, North Huntley Tap, Algonquin Tap, Mendota, and Burnham. Work covers switch and circuit switcher replacements, circuit breaker additions, and relay upgrades. It includes geographic maps, cost estimates, facility rating tables, and in-service dates.‡ Extracted: Names 6 substations: Algonquin Tap, Burnham, Butterfield, Glen Ellyn Tap, Mendota, North Huntley Tap. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: ComEd |
| 2026-10-16 | Item 05 - DEOK Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio's supplemental projects presentation covers need statements for the Liberty 69 kV Ring Bus, US_PO_SH 69 kV Substation Retirement, Red Bank 138 kV Reliability Upgrade, and customer XTEK retirement. It includes problem statements, driver classifications, area maps, and an M-3 planning schedule.‡ Extracted: Names 8 substations: Allen, Kemper, Liberty, Red Bank, Shaker Run, US_PO_SH and 2 more. 4 projects. |
Substation Expansions: DEOK |
| 2026-10-16 | Item 05 - DOM Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
A committee presentation details a customer service supplemental project (DOM-2026-0029) to connect Cooperative Electric to a 115 kV line for a redundant third feed to the Burlington Delivery Point. The document provides project drivers, problem statements, estimated costs, in-service dates, an area map, and a high-level M-3 meeting schedule.‡ Extracted: Names 1 substation: Burlington Drive DP. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (approximately 30 MW). |
Substation Expansions: DOM |
| 2026-10-16 | Item 05 - DOM Supplemental Projects Presentation Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
A presentation details project DOM-2026-0029 to provide a redundant 3rd 115 kV feed for Mecklenburg Electric Cooperative at the Burlington Delivery Point. It includes an area map, project driver, estimated cost of $0.010 M, and an M-3 process schedule.‡ Extracted: No substation names extracted. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (30 MW). |
Substation Expansions: DOM |
| 2026-10-16 | Item 06 - EKPC Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
The utility's presentation covers supplemental project needs in Eli, southern Russell County near Lake Cumberland, and South Oak Hill. The presentation details customer service and equipment overload issues involving the Salem 69 kV distribution substation and South Oakhill transformer, accompanied by area maps and an M-3 meeting schedule.‡ Extracted: Names 2 substations: Salem, South Oakhill. 2 projects. |
Substation Expansions: EKPC |
| 2026-10-16 | Item 06 - JCPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
A transmission zone presentation covers supplemental project needs and solutions for the Taylor Lane, Wyckoff Street, West Wharton, Melrose, Whitings, and New Providence substations. It includes area maps, transmission line ratings, equipment replacement details, and a $13.03 M cost estimate with a projected in-service date of 05/31/2030.‡ Extracted: Names 18 substations: Air Reduction, EH Werner, Englishtown, Freneau, Gillette, Keyport and 12 more. 6 projects, 1 with a printed cost estimate. |
Substation Expansions: JCPL |
| 2026-10-16 | Item 07 - EKPC Supplemental Projects Presentation Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
EKPC's supplemental project needs presentation for the Western Committee covers low voltage issues and feeder and transformer overloads in Eli, KY (southern Russell County near Lake Cumberland) and South Oak Hill. It includes problem statements, project driver categories, and area maps along with an M-3 process meeting schedule.‡ Extracted: Names 2 substations: Salem, South Oakhill. 2 projects. |
Substation Expansions: EKPC |
| 2026-10-16 | Item 07 - MetEd Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd Transmission Zone details a proposed solution for a ~10 MW customer connection (ME-2026-011) near the Cly - Smith Street 115 kV Line and Cly Substation. It includes problem statements, an area map, a one-line diagram, a $2.25 M cost estimate, and an M-3 process schedule.‡ Extracted: Names 2 substations: Cly, Smith Street. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (approximately 10 MW). |
Substation Expansions: Met-Ed |
| 2026-10-16 | Item 08 - Penelec Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
FirstEnergy's presentation for the Penelec transmission zone details the proposed rebuild of 20.7 miles of the Eagle Valley - Westfall (EVW) 115 kV line and upgrades at Tyrone North Substation. It provides project drivers, structure failure statistics, line ratings, a cost estimate, an area map, and a high-level M-3 meeting schedule.‡ Extracted: Names 3 substations: Eagle Valley, Tyrone North Substation, Westfall. 1 project, 1 with a printed cost estimate. |
Substation Expansions: Penelec |
| 2026-10-16 | Item 09 - PPL Supplemental Projects Presentation Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
The utility's presentation to the regional committee details supplemental project needs, including line improvements, substation conversions, and a customer load connection near Allentown, PA. Project need summaries describe equipment conditions and customer service requirements alongside transmission area maps for the Pocono-Jackson, Penns, Twin Lakes, McGovernville, Silver Spring, and Roble Road areas.‡ Extracted: Names 3 substations: McGovernville, Penns, Sliver Spring. 6 projects, 1 with a printed customer load (50MW). |
Substation Expansions: PPL |
| 2026-10-07* | AEP local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
AEP's 2026 Local Plan presents supplemental projects across Indiana, Ohio, and other service areas, including New Haven, Greentown, and Orrville. Projects cover customer load connections, line rebuilds, substation expansions, breaker additions, and scope changes. Slides provide problem statements, proposed solutions, alternatives considered, cost estimates, projected in-service dates, geographic maps, and one-line bubble diagrams.‡ Extracted: Names 139 substations: Abert, Adams, Addison, Allen, Aloe Vera SW, Anchor Hocking and 133 more. 47 projects, 47 with a printed cost estimate, 25 with a printed customer load (1200MW, 437MW, 90 MW, 7.5 MW, …). |
Substation Expansions: AEP |
| 2026-10-07* | Met-Ed local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's 2026 supplemental project submission for the MetEd transmission zone covers line rebuilds, breaker-and-a-half switchyard additions, transformer installations, and a customer connection. Projects involve Round Top, South Reading, West Reading, Gardners, Willis Road, Muhlenberg, Frystown, South Lebanon, Foxhill, and North Hanover substations, accompanied by geographic maps, single-line diagrams, and estimated project costs.‡ Extracted: Names 25 substations: Allen, Campbelltown Substation, Carpenter Technology Substation, Cly, Foxhill Substation, Frystown and 19 more. 12 projects, 12 with a printed cost estimate. |
Substation Expansions: Met-Ed |
| 2026-10-06 | Informational Only - ACE Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
The utility's 2026 supplemental project submission for its service zone outlines plans for the Penns Grove, NJ area. It details a customer load interconnection, a temporary radial 69kV feed, and a new 69kV substation on the Beckett - Churchtown line, supported by an area map, single-line diagrams, and project cost estimates.‡ Extracted: Names 2 substations: Beckett, Churchtown. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (40 MW). |
Substation Expansions: ACE |
| 2026-10-06 | Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
AEP's 2026 Local Plan presents supplemental transmission projects across locations including New Haven, Greentown, New Carlisle, and Elkhart in Indiana; Pax Branch, Trail Fork, and Kenova in the area; and Piketon, East Leipsic, and Canton in Ohio. It covers customer load connections, line rebuilds, station upgrades, and replacements, supported by problem statements, proposed solutions, cost estimates, bubble diagrams, and maps.‡ Extracted: Names 135 substations: Abert, Adams, Addison, Allen, Aloe Vera SW, Anchor Hocking and 129 more. 47 projects, 47 with a printed cost estimate, 26 with a printed customer load (1200MW, 437MW, 90 MW, 5.14 MVA, …). |
Substation Expansions: AEP |
| 2026-10-06 | Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Transmission presents M3 process supplemental projects across the DAY, ATSI, and AEP zones for Versailles, Bowling Green, Orrville, and Niles Central. The slides outline new substations, line construction, line rebuilds, breaker additions, and customer connection work, accompanied by geographic maps, one-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 21 substations: Apple Ave, Baker Road, Cloverdale, East Wooster, Greenlawn, Gypsy Lane and 15 more. 5 projects, 5 with a printed cost estimate, 3 with a printed customer load (16 MW, 60 MW, 63 MW). |
Substation Expansions: AMPT |
| 2026-10-06 | Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy and Duquesne Light present supplemental transmission project submissions for the APS and DLCO zones, including Monroeville and Front Royal. The slides detail customer connections, line rebuilds, relay upgrades, and transformer replacements alongside cancellations, supported by area maps, line ratings, single-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 56 substations: 502 Junction Substation, Armstrong Substation, Belmon, Bethel Park Substation, Beverly Substation, Carroll and 50 more. 36 projects, 34 with a printed cost estimate, 4 with a printed customer load (20 MW, 10 MW, 250 MW, 80 MW). |
Substation Expansions: APS |
| 2026-10-06 | Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
A transmission zone presentation details supplemental project submissions for local plan inclusion across areas including Akron, Summit County, Medina, Seville, Orrville, and Niles. It covers line reconductoring and rebuilds, new ring buses, breaker replacements, and customer connections, featuring area maps, one-line diagrams, and project cost estimates.‡ Extracted: Names 52 substations: Allen Junction Substation, Apple Ave sub, Ashtabula East Substation, Bridge, Bulk Mail Facility, Carlisle and 46 more. 29 projects, 28 with a printed cost estimate, 7 with a printed customer load (16 MW, 69 MW, 45 MW, 135 MW, …). |
Substation Expansions: ATSI |
| 2026-10-06 | Informational Only - BGE Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
BGE's 2026 presentation covers supplemental projects in the BGE Transmission Zone, including circuit breaker replacements at Riverside and Windy Edge, line rebuilds and reconductoring across Finksburg, Westminster, High Ridge, Dorsey Run, Crystal Springs, Perryman, Edgewood, Granite, and Chestnut Hill, and transformer additions and replacements. The presentation includes area maps, problem statements, line diagrams, estimated costs, and ratings tables.‡ Extracted: Names 8 substations: Chestnut Hill, Crystal Springs, Dorsey Run, Finksburg, Granite, Riverside and 2 more. 12 projects, 12 with a printed cost estimate, 1 with a printed customer load (20 MW). |
Substation Expansions: BGE |
| 2026-10-06 | Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
ComEd presents supplemental project submissions for its 2026 Local Plan, addressing areas including Skokie, Chicago, Powerton, Zion, Des Plaines, Channahon, Mazon, Lockport, Plano, and Cherry Valley. It details transformer and circuit breaker replacements, customer expansion, and MISO Tranche 2.1 requests, supported by area maps, rating tables, estimated costs, and project schedules.‡ Extracted: Names 24 substations: Babcock, Channahon, Cherry Valley, Collins, Des Plaines, Electric Junction and 18 more. 8 projects, 7 with a printed cost estimate, 1 with a printed customer load (52 MW). |
Substation Expansions: ComEd |
| 2026-10-06 | Informational Only - Dayton Local Plan Submission of the supplemental projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
AES Ohio and transmission utilities present supplemental projects in the Dayton Transmission Zone for locations including Montgomery, Preble, and Auglaize counties, Lost Creek Township, Versailles, Jeffersonville, and Wilmington. Proposed work covers 69 kV and 345 kV line construction, line rebuilds, substation expansions, and customer interconnections, illustrated with area maps, single-line diagrams, and project cost estimates.‡ Extracted: Names 20 substations: Atlanta, Baker Road, Botkins, Camden, Chippewa, Clinton and 14 more. 6 projects, 6 with a printed cost estimate, 4 with a printed customer load (33MW, ~16MW, 1.5 GW, 16 MW). |
Substation Expansions: Dayton |
| 2026-10-06 | Informational Only - DEOK Local Plan Submission of the supplemental projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio and Kentucky's 2026 local plan presentation covers project submissions in Cincinnati, Trenton in Butler County, and along paths between Wilder and Decoursey, and Sutton Ridge and Miami Fort. It details substation additions, line rebuilds, switch replacements, and customer load additions with facility descriptions, cost and in-service date estimates, single-line schematics, and area maps.‡ Extracted: Names 18 substations: Beaver, Beckjord, Claryville, Decoursey, Finneytown, Front Street and 12 more. 5 projects, 5 with a printed cost estimate, 1 with a printed customer load (300 MW). |
Substation Expansions: DEOK |
| 2026-10-06 | Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
The utility presents supplemental projects for inclusion in the 2026 Local Plan for Brunot Island Substation and Monroeville, Pennsylvania. Project details include replacing a 138 kV breaker, establishing the new McGinley Substation, line looping, and mechanical refrigeration, accompanied by area maps, before-and-after line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 7 substations: Brunot Island, Carson Substation, Cheswick, Huntingdon, McGinley Substation, Springdale and 1 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (250 MW). |
Substation Expansions: DLCO |
| 2026-10-06 | Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Dominion Energy’s 2026 local plan presentation covers projects in Stafford, Greensville, Prince George, Rockbridge, Augusta, Loudoun, Caroline, and Louisa counties, as well as Norfolk, Ashland, and Chesterfield. Work includes new delivery substations, transformer additions and upgrades, circuit switcher installations, line rebuilds, and reconductoring, accompanied by problem statements, project costs, in-service dates, one-line diagrams, and area maps.‡ Extracted: Names 110 substations: Alexander Corner, Allied, Allman, Alto Substation, Aquia Harbor, Auto World and 104 more. 52 projects, 51 with a printed cost estimate, 35 with a printed customer load (213.7 MW, 32 MW, 29.8 MW, 6.5 MW, …). |
Substation Expansions: DOM |
| 2026-10-06 | Informational Only - DPL Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
The utility's supplemental project presentation for the area transmission zone details projects addressing Red Lion, Keeney, Silverside, Cheswold, and Kent facilities. It outlines substation breaker installations, bus conductor upgrades, relay replacements, and terminal reconfigurations, accompanied by geographic maps, one-line system diagrams, facility ratings, estimated costs, and in-service dates.‡ Extracted: Names 8 substations: Carrcroft, Cheswold, Edgemoor, Keeney, Keeney EHV, Kent and 2 more. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: DPL |
| 2026-10-06 | Informational Only - EKPC Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
EKPC's 2026 Local Plan presents supplemental transmission projects in Cynthiana, Renaker, Shelby County, Skaggs, Murphysville, and Owen County, KY. It covers line rebuilds, new switching and distribution stations, and tie-line work driven by equipment condition, customer service, and operational flexibility, including geographic area maps, before-and-after diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 25 substations: Bavarian, Boone County, Clay Village, Cynthiana Junction, Dewey Dam, EK Cynthiana T and 19 more. 5 projects, 5 with a printed cost estimate, 1 with a printed customer load (57 MW). |
Substation Expansions: EKPC |
| 2026-10-06 | Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
The utility's local plan presentation covers projects in Ocean County and near West Wharton, Werner, Belmar, Bradley Beach, Oceanview, Old Bridge, Briant Park, Traynor, Atlantic, Long Branch, Glen Gardner, Englishtown, Martinsville, Readington, Morris Court, Freneau, Keyport, and Manitou. It includes transformer replacements, line rebuilds, submarine cable replacements, and customer connections, with area maps, single-line diagrams, costs, and in-service dates.‡ Extracted: Names 40 substations: Allenhurst Substation, Atlantic, Belmar, Bernardsville, Bradley Beach, Briant Park and 34 more. 24 projects, 24 with a printed cost estimate, 4 with a printed customer load (5 MVA, 10 MW, 10 MW, 52 MW). |
Substation Expansions: JCPL |
| 2026-10-06 | Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
The utility transmission zone local plan submission details supplemental projects addressing Round Top, South Reading, Muhlenberg, Foxhill, and North Hanover substations, plus line rebuilds and customer connections. Project profiles include problem statements, proposed solutions, line ratings, estimated project costs, projected in-service dates, area maps, and one-line diagrams.‡ Extracted: Names 35 substations: Allen, Annville, Campbelltown Substation, Carlisle Pike, Carpenter Technology Substation, Cleona and 29 more. 12 projects, 12 with a printed cost estimate, 5 with a printed customer load (18.8 MW, 60 MW, 33 MW, 50 MW, …). |
Substation Expansions: Met-Ed |
| 2026-10-06 | Informational Only - PECO Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
PECO's 2026 local plan submission outlines supplemental projects in Exton, King of Prussia, and Fairless Hills. It details customer connections, line rebuilds, breaker replacements, and a transformer upgrade, accompanied by need numbers, cost estimates, target in-service dates, line rating tables, area maps, and simplified project diagrams.‡ Extracted: Names 17 substations: Barbadoes, Betzwood, Bradford, Buxmont, Crescentville, Emilie and 11 more. 11 projects, 11 with a printed cost estimate, 2 with a printed customer load (290MW, 600 MW). |
Substation Expansions: PECO |
| 2026-10-06 | Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
The utility's 2026 local plan submission presents transmission line rebuilds, ring bus installations, reconductoring, customer connections, and terminal upgrades across areas including Dubois, Niles Valley, Warren, Carlisle Pike, Lewistown, and Johnstown. It includes project drivers, problem statements, selected solutions, line ratings, estimated project costs, projected in-service dates, geographic maps, and single-line diagrams.‡ Extracted: Names 60 substations: Bethlehem, Blain Substation, Bobik Lane, Carlisle Pike, Carrolltown, Cooper Substation and 54 more. 20 projects, 20 with a printed cost estimate. |
Substation Expansions: Penelec |
| 2026-10-06 | Informational Only - PEPCO Local Plan Submission of Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Pepco's local plan submission presents supplemental projects in the PEPCO Transmission Zone, including replacing oil circuit breakers at Burches Hill and upgrading relays on the Burches Hill – Palmers Corner line. It includes need numbers, problem statements, estimated costs, projected in-service dates, ratings tables, area maps, and single-line diagrams.‡ Extracted: Names 3 substations: Burches Hill, Palmer Corner, Palmers Corner. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: Pepco |
| 2026-10-06 | Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL's 2026 presentation presents supplemental projects for inclusion in the Local Plan across Pennsylvania locations including Rutherford, Frackville, Mount Carmel, Girardville, Muncy, Harwood, Callender Gap, Orefield, and Highspire. Work details customer load connections, line rebuilds, transformer replacements, and switchyard upgrades, accompanied by area maps, one-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 81 substations: Acahela, Allentown, Avoca, Bear Creek, Berks, Big Bass and 75 more. 40 projects, 39 with a printed cost estimate, 8 with a printed customer load (1,980 MW, 500 MW, 1000 MW, 450 MW, …). |
Substation Expansions: PPL |
| 2026-10-06 | Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2026.xlsx Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
PSE&G's 2026 local plan submission details supplemental projects across the Newark Area, Mount Laurel Area, PSE&G Central Territory, and PSE&G Southern Territory. The presentation outlines problem statements, estimated costs, projected in-service dates, aerial maps, and one-line diagrams for new substations, transformer installations, and 69kV circuit rebuilds.‡ Extracted: Names 9 substations: Burlington, Cox’s Corner, Creek Rd, Gloucester, Lawnside, McCarter Switching station and 3 more. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: PSEG |
| 2026-10-06 | Informational Only - UGI Local Plan Submission of the Supplemental Projects for 2026 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
UGI's 2026 local plan submission presents supplemental projects in the UGI Transmission Zone, including replacing direct-buried lattice towers and reconductoring the Plymouth to Palooka line and constructing the new 8th Street Substation. The presentation includes problem descriptions, cost estimates, projected in-service dates, area maps, and one-line diagrams.‡ Extracted: Names 4 substations: 8th Street Substation, Palooka, Plymouth, Swoyersville. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: UGI |
| 2026-10-06 | Item 06 - ATSI Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy's presentation for the ATSI transmission zone covers customer load connections near Hoytdale and Lake Avenue substations, as well as the replacement and reconfiguration of Beaver No. 2 345/138 kV Transformer. It includes need statements, proposed solutions, cost estimates, in-service dates, transmission line ratings, area maps, and single-line system diagrams.‡ Extracted: Names 7 substations: Beaver, Hoytdale, Lake Avenue, Mansfield, McClelland, West Lorain and 1 more. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (500 MW). |
Substation Expansions: ATSI |
| 2026-10-06 | Item 07 - APS Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the APS Transmission Zone outlines a relay scheme need on the Eaglehead - New Market line, substation rebuilds at Elko, a line rebuild for Lime Kiln – Montgomery, a customer connection near Sage Substation, and the cancellation of the Ringgold No. 4 transformer project, supported by area maps, line ratings, and cost estimates.‡ Extracted: Names 15 substations: Carbon Center Substation, Eaglehead Substation, Elko Substation, Lime Kiln, Montgomery, Moshannon and 9 more. 5 projects, 3 with a printed cost estimate, 1 with a printed customer load (165 MW). |
Substation Expansions: APS |
| 2026-10-06 | Item 08 - JCPL Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's solution presentation for the JCPL transmission zone outlines proposed circuit breaker, circuit switcher, conductor, and disconnect switch replacements at Greystone Substation (need JCPL-2026-045). It includes an area map, an electrical diagram, line rating changes, an estimated project cost of $9.71 M, and an M-3 meeting schedule.‡ Extracted: Names 8 substations: Chilcott, Denville, Foll Hill, Greystone, Montville, Morristown and 2 more. 1 project, 1 with a printed cost estimate. |
Substation Expansions: JCPL |
| 2026-10-06 | Item 09 - MetEd Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd Transmission Zone details need ME-2024-006 to expand Hosensack Substation to a double-breaker double-bus configuration, alongside relay revisions at North Boyertown, Albertis, North Temple, and Glendon substations. It features location and network diagrams, transmission line ratings, an M-3 meeting schedule, and an estimated project cost of $39.36 M.‡ Extracted: Names 7 substations: Albertis Substation, Alburtis, Glendon, Hosensack, North Boyertown, North Temple and 1 more. 1 project, 1 with a printed cost estimate. |
Substation Expansions: Met-Ed |
| 2026-10-06 | Item 10 - Penelec Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
FirstEnergy's presentation for the Penelec Transmission Zone details supplemental project solutions, including Shawville and Elko 230 kV terminal upgrades and replacing the Raystown No. 1 230-46 kV transformer. The document includes area maps, project drivers, line and transformer ratings, estimated costs totaling $1.14 M and $7.60 M, and projected in-service dates.‡ Extracted: Names 6 substations: Carbon Center, Elko 230 kV Substation, Quehanna, Raystown, Shawville, Squab Hollow. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: Penelec |
| 2026-10-06 | Item 11 - AEP Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
The utility's presentation for the Transmission Expansion Advisory Committee presents needs and solutions in Waterford, OH, covering conductor issues on the Muskingum River - Kammer line section and a customer connection near Muskingum station. It includes area maps, single-line configurations, project descriptions, cost estimates totaling $20.574 M, and an M-3 process schedule.‡ Extracted: Names 6 substations: Beverly, Holloway, Kammer, Lamping, Muskingum, Muskingum River. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (1200MW). |
Substation Expansions: AEP |
| 2026-10-06 | Item 12 - PPL Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL Transmission Zone supplemental project presentations cover customer service load connections in Mifflinville, Allenwood, and Frackville, PA. The presentations include need descriptions, proposed solutions with line rebuilds and switchyard expansions, ratings, cost estimates totaling $158.5 M and $36.3 M, in-service dates, area maps, and one-line diagrams.‡ Extracted: Names 4 substations: Elimsport, Frackville, Siegfried, Sunbury. 3 projects, 2 with a printed cost estimate, 3 with a printed customer load (250MW, 300 MW, 750 MW). |
Substation Expansions: PPL |
| 2026-10-06 | Item 13 - PSEG Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
PSE&G's presentation for the Farragut – Hudson Area outlines a supplemental project solution (Need Number: PSEG-2026-0004) to remove cables and dielectric fluid from the out-of-service B-3402 and C-3403 underground transmission circuits from Hudson to New York, capping the pipe. It includes geographic maps, circuit diagrams, estimated costs, and projected completion dates.‡ Extracted: Names 1 substation: Hudson. 1 project, 1 with a printed cost estimate. |
Substation Expansions: PSEG |
| 2026-10-06 | Item 14 - DOM Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Dominion Energy's presentation details Do No Harm updates, customer load service, an end-of-life rebuild, and project cancellations in Appomattox, Fairfax County, and Loudoun County. It outlines conductor reconductoring, transformer replacements, line rebuilds, and tap connections, featuring area maps, one-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 20 substations: Anderson Branch, Bremo, Bristers, Carson, CIA, Farmville and 14 more. 6 projects, 4 with a printed cost estimate, 4 with a printed customer load (300 MW, 60MW, 100 MW, 100 MW). |
Substation Expansions: DOM |
| 2026-10-06 | Item 15 - PECO Supplemental Projects - Presentation Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
The utility's presentation for the PECO Transmission Zone outlines supplemental project needs under the M-3 process. It identifies equipment condition and replacement needs for circuit breakers at Trainer and Linton, accompanied by area maps and a high-level M-3 meeting schedule table.‡ Extracted: Names 2 substations: Linton, Trainer. 2 projects. |
Substation Expansions: PECO |
| 2026-10-06 | Item 16 - Reliability Analysis Update - Presentation Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia PJM · PJM system-wide |
The Transmission Expansion Advisory Committee presentation covers the RTEP Window update and scope and cost changes for Dominion, PPL, and Exelon. It features project descriptions, cost summary tables, schedules, driver details, and system area maps illustrating thermal overloads and CapEx units across multiple transmission zones.‡ Extracted: Names 22 substations: Aspen, Bristow, Buttermilk Falls, Conastone, Elmont, Fentress and 16 more. 10 projects, 10 with a printed cost estimate. |
Substation Expansions: DOM, PJM |
| 2026-10-01* | BGE local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
BGE's presentation details supplemental projects for inclusion in its 2026 Local Plan, addressing areas around Finksburg, Westminster, Riverside, Windy Edge, High Ridge, Dorsey Run Tap, and Crystal Springs Tap. It presents circuit breaker replacements, an underground line replacement, and line reconductoring alongside area maps, estimated costs, and projected in-service dates.‡ Extracted: Names 6 substations: Crystal Springs, Dorsey Run, Finksburg, Riverside, Westminster, Windy Edge. 8 projects, 8 with a printed cost estimate. |
Substation Expansions: BGE |
| 2026-10-01* | DPL local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
The utility's transmission zone local plan presentation details supplemental projects near Red Lion and Keeney substations. Work includes installing two 138 kV breakers and upgrading bus conductor from 954 ACSR to 2-954 ACSR. The material includes geographic maps, single-line diagrams, rating tables, estimated costs, and in-service dates.‡ Extracted: Names 3 substations: Keeney, Keeney EHV, Red Lion. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: DPL |
| 2026-10-01* | EKPC local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
EKPC's 2026 Local Plan submission details supplemental projects across Cynthiana, Renaker, Shelby County, Skaggs, Murphysville, and Owen County. The presentation outlines line rebuilds, new distribution stations, tie-line additions, and breaker station construction to address loading and reliability needs, accompanied by geographic maps, one-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 26 substations: AEP Dewey Dam, AEP Thelma, Bavarian, Boone County, Clay Village, Cynthiana Junction and 20 more. 5 projects, 5 with a printed cost estimate, 1 with a printed customer load (57 MW). |
Substation Expansions: EKPC |
| 2026-10-01* | JCPL local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's 2026 local plan submission for the JCPL Transmission Zone presents transformer replacements, line rebuilds, circuit breaker replacements, submarine cable installations, and customer connections in Ocean County and at West Wharton, Glen Gardner, Englishtown, and Traynor substations. Slides provide problem descriptions, scope details, line ratings, geographic maps, one-line diagrams, estimated project costs, and projected in-service dates.‡ Extracted: Names 34 substations: Allenhurst Substation, Atlantic, Belmar, Bradley Beach, Briant Park, Cedar Bridge and 28 more. 24 projects, 24 with a printed cost estimate, 9 with a printed customer load (3 MVA, 1.5 MVA, 8.5 MVA, 6 MVA, …). |
Substation Expansions: JCPL |
| 2026-10-01* | PECO local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
PECO's 2026 local plan presentation outlines supplemental transmission projects in Exton, PA, King of Prussia, PA, Fairless Hills, PA, and North Philadelphia. It details customer connections, new substations, line rebuilds, reconductoring, relay upgrades, and breaker replacements, accompanied by area maps, configuration diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 13 substations: Barbadoes, Betzwood, Bradford, Emilie, Ford Mill, Jenkintown and 7 more. 6 projects, 4 with a printed cost estimate, 2 with a printed customer load (290MW, 600 MW). |
Substation Expansions: PECO |
| 2026-10-01* | Penelec local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
The utility's 2026 local plan submission details proposed line rebuilds, reconductoring, ring bus conversions, equipment upgrades, and a customer connection near Meadville and other substations. Slides provide problem statements, solutions, ratings before and after solutions, estimated costs, projected in-service dates, geographic maps, and single-line diagrams.‡ Extracted: Names 42 substations: Blain Substation, Bobik Lane, Carrolltown, Cooper Substation, Corry East, Dubois and 36 more. 20 projects, 20 with a printed cost estimate, 6 with a printed customer load (30 MW, 43 MW, 67 MW, 27 MW, …). |
Substation Expansions: Penelec |
| 2026-10-01* | PEPCO local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Pepco's presentation for the PEPCO Transmission Zone M-3 Process submits a supplemental project for inclusion in the Local Plan. It details replacing four oil circuit breakers at Burches Hill, accompanied by problem drivers, ratings, estimated cost, in-service date, and area maps.‡ Extracted: Names 1 substation: Burches Hill. 1 project, 1 with a printed cost estimate. |
Substation Expansions: Pepco |
| 2026-09-30* | ComEd local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
ComEd presents supplemental project submissions for its 2026 Local Plan, addressing equipment condition, customer expansion, and MISO Tranche 2.1 requests across Skokie, Chicago, Collins, Powerton, Zion, Des Plaines, Channahon, Mazon, Lockport, Plano, and Cherry Valley. Slides outline transformer, capacitor bank, and breaker replacements, network cut-ins, cost estimates, in-service dates, and area maps.‡ Extracted: Names 23 substations: Babcock, Channahon, Cherry Valley, Collins, Des Plaines, Electric Junction and 17 more. 8 projects, 7 with a printed cost estimate, 1 with a printed customer load (52 MW). |
Substation Expansions: ComEd |
| 2026-09-30* | Datyon local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) AMPT · AMP Transmission |
AES Ohio and the utility transmission present supplemental projects in the Dayton Transmission Zone across Montgomery, Preble, Miami, and Auglaize counties, including Jeffersonville, Wilmington, and Versailles. The plan covers line rebuilds, new lines, substation expansions, reconfigurations, and customer connections, accompanied by cost estimates, project schedules, and area network diagrams.‡ Extracted: Names 29 substations: Amsterdam, Atlanta, Baker Road, Botkins, Camden, Chippewa and 23 more. 6 projects, 6 with a printed cost estimate, 4 with a printed customer load (33MW, ~16MW, 1.5 GW, 16 MW). |
Substation Expansions: Dayton, AMPT |
| 2026-09-30* | DEOK local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio & Kentucky's (DEOK) local plan presentation for the DEOK transmission zone details supplemental projects in Cincinnati, Butler County, and other areas. Work covers a new Front Street substation, Sutton Ridge-Miami Fort and Wilder-Decoursey rebuilds, Mt. Healthy substation rebuild, and customer load additions, supported by area maps, schematics, and estimated costs.‡ Extracted: Names 17 substations: Beaver, Beckjord, Claryville, Decoursey, Finneytown, Front Street and 11 more. 5 projects, 5 with a printed cost estimate, 1 with a printed customer load (300 MW). |
Substation Expansions: DEOK |
| 2026-09-28* | APS local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy and Duquesne Light present supplemental transmission project submissions for the APS and DLCO zones in Monroeville and Front Royal. Projects cover customer connections, relay replacements, line rebuilds, transformer upgrades, and bus reconfigurations, documented with problem statements, proposed solutions, cost estimates, projected in-service dates, ratings tables, area maps, and single-line diagrams.‡ Extracted: Names 56 substations: 502 Junction Substation, Armstrong Substation, Belmon, Bethel Park Substation, Beverly Substation, Carroll and 50 more. 36 projects, 34 with a printed cost estimate, 8 with a printed customer load (20 MW, 22.4 MVA, 35 MVA, 93 MW, …). |
Substation Expansions: APS |
| 2026-09-23* | ATSI local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy and the utility present supplemental projects in the ATSI transmission zone, naming areas including Orrville, Akron/Summit County, and Medina/Seville. The plans feature new customer connections, line rebuilds, bus expansions, equipment replacements, and a project cancellation, accompanied by area maps, single-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 52 substations: Allen Junction Substation, Apple Ave sub, Ashtabula East Substation, Bridge, Bulk Mail Facility, Carlisle and 46 more. 29 projects, 28 with a printed cost estimate, 7 with a printed customer load (80 MVA, 6.5 MVA, 10 MVA, 16 MW, …). |
Substation Expansions: ATSI |
| 2026-09-21* | DLCO local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
The utility presents supplemental projects for its 2026 Local Plan in Monroeville, Pennsylvania and at Brunot Island Substation. The presentation details a 138 kV breaker replacement and a customer load connection involving the new McGinley Substation, along with area maps, a single-line schematic, cost estimates, and projected in-service dates.‡ Extracted: Names 7 substations: Brunot Island, Carson Substation, Cheswick, Huntingdon, McGinley Substation, Springdale and 1 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (250 MW). |
Substation Expansions: DLCO |
| 2026-09-18 | Item 01 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the APS Transmission Zone presents needs and proposed solutions for misoperation relays and terminal equipment upgrades at substations including Springdale, Murrycrest, White Valley, Eldora, McAlpin, Pruntytown, Back Fork, Pickens, Rivesville, Finzel, Frostburg No. 1, Ridgeley, Goff Run, and Glenville. The slides include area maps, line ratings, transmission cost estimates, and single-line diagrams.‡ Extracted: Names 21 substations: Back Fork, Double Toll Gate, Eldora, Finzel, Frostburg No. 1 Substation, Glenville and 15 more. 8 projects, 6 with a printed cost estimate. |
Substation Expansions: APS |
| 2026-09-18 | Item 02 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy's presentation for the ATSI transmission zone reviews customer connection requests near the Longview - Ontario line, Chittenden Substation, and Ford Brookpark Substation. It also details replacing the control building at Highland Station with a package control enclosure, accompanied by area maps, cost estimates, and an M-3 meeting schedule.‡ Extracted: Names 8 substations: Chittenden Substation, Ford Brookpark Substation, Fowles, Fox, Highland, Longview and 2 more. 4 projects, 1 with a printed cost estimate, 3 with a printed customer load (approximately 10 MW, approximately 22 MW, approximately 60 MW). |
Substation Expansions: ATSI |
| 2026-09-18 | Item 03 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
The utility's regional presentation covers needs and solutions for the East Liverpool – North Wellsville, South Cadiz - Robyville 69 kV, Moundsville - Natrium 69 kV, and Coleman - Stone 69 kV lines. It details 69 kV line rebuilds, switch and relay upgrades, geographic overview maps, one-line diagrams, cost estimates, and project schedules.‡ Extracted: Names 15 substations: Barrenshe, Coleman, East Liverpool, McElroy, Moundsville, Natrium and 9 more. 4 projects, 1 with a printed cost estimate. |
Substation Expansions: AEP |
| 2026-09-18 | Item 04 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
A presentation for ComEd covers supplemental project needs and solutions across Mendota, Burnham, Bellwood, LaGrange Park, McCook, Butterfield, Glen Ellyn Tap, North Huntley Tap, Algonquin Tap, Wolfs Crossing, and Montgomery Tap. Work includes circuit switcher and switch replacements, line rebuilding, and relay upgrades, accompanied by area maps, ratings tables, costs, and schedule details.‡ Extracted: Names 14 substations: Algonquin Tap, Bellwood, Burnham, Butterfield, ESSW507 Main Line Tap, Glen Ellyn Tap and 8 more. 7 projects, 2 with a printed cost estimate, 1 with a printed customer load (260 MW). |
Substation Expansions: ComEd |
| 2026-09-18 | Item 05 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio & Kentucky's supplemental presentation details the cancellation of customer service project DEOK-2025-006 for the City of Hamilton due to a withdrawn load request. The presentation includes area maps, single-line diagrams, an M-3 meeting schedule, and canceled scope details covering work at City of Hamilton, Port Union, Fairfield, and Seward substations.‡ Extracted: Names 4 substations: City of Hamilton Substation, Fairfield Substation, Port Union, Seward Substation. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (240 MW). |
Substation Expansions: DEOK |
| 2026-09-18 | Item 06 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
The utility's presentation outlines a proposed solution for need EKPC-2026-001 in Casey Co. It details adding two 161 kV line breakers to address three-terminal line concerns, with a regional location map, single-line diagrams, an estimated cost of $0.998 M, and an M-3 meeting schedule table.‡ Extracted: Names 1 substation: Casey Co. 1 project, 1 with a printed cost estimate. |
Substation Expansions: EKPC |
| 2026-09-18 | Item 07 - SRRTEP West - Reliability Analysis Update Presentation Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
An update for the AEP transmission zone details a scope change for a baseline reliability project, covering the Smith Mountain 138 kV upgrade, conductor replacement, and 138 kV disconnect switch replacements. The presentation provides revised cost estimates, an in-service date of 6/1/2029, a project reason, and an area map.‡ Extracted: Names 1 substation: Smith Mountain. 1 project, 1 with a printed cost estimate. |
Substation Expansions: AEP |
| 2026-09-17 | Item 01 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's presentation for the JCPL Transmission Zone covers needs, solutions, and scope changes across the Mid-Atlantic region. It details line rebuilds, breaker replacements, relay upgrades, and customer connections near substations including Windsor, Phillipsburg, Valley View, Jerseyville, and Lakehurst, accompanied by area maps, single-line schematics, and estimated project costs.‡ Extracted: Names 41 substations: Bernardsville, Bradevelt, Coke, Englishtown, Freneau, Gilbert and 35 more. 13 projects, 10 with a printed cost estimate, 4 with a printed customer load (96 MVA, 16 MW, 11 MW, 0.66 MW). |
Substation Expansions: JCPL |
| 2026-09-17 | Item 02 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd Transmission Zone details need ME-2026-010 addressing aging circuit breakers at Middletown Junction Substation and solution ME-2026-007 for a 25 MW retail customer connection near Taneytown No. 1 Substation involving Germantown Substation. It includes an M-3 process schedule, area maps, network diagrams, and an estimated cost.‡ Extracted: Names 4 substations: Germantown Substation, Middletown Junction, Middletown Substation, Taneytown No.1 Substation. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (25 MW). |
Substation Expansions: Met-Ed |
| 2026-09-17 | Item 03 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
The transmission zone presentation details supplemental project solutions, including a customer connection on the East Towanda - North Meshoppen 115 kV Line, switch replacements on the Glory - Nanty Glo - Spangler 46 kV Line, and the Valley REC Miller - Warrior Ridge 46 kV H Line rebuild. It includes area maps, one-line diagrams, cost estimates, and schedules.‡ Extracted: Names 4 substations: East Towanda, Nicktown, North Meshoppen, Warrior Ridge. 3 projects, 3 with a printed cost estimate. |
Substation Expansions: Penelec |
| 2026-09-17 | Item 04 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
The utility's presentation outlines customer service needs and proposed line tap solutions near Mt. Carmel, Frackville, Covington, and Allentown, PA, as well as at Arrowhead, Lansford, and Jack Frost substations. The document includes problem statements, area maps, conceptual connection diagrams, estimated costs, line ratings, and projected in-service dates.‡ Extracted: Names 9 substations: Acahela, Arrowhead, East Palmerton, Frackville, Jack Frost, Jackson and 3 more. 7 projects, 5 with a printed cost estimate, 4 with a printed customer load (120MW, 50MW, 15 MW, 75MW). |
Substation Expansions: PPL |
| 2026-09-17 | Item 05 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Dominion Energy's presentation details needs and proposed solutions in Shenandoah and Southampton counties, Virginia, covering a new substation, transformer additions, capacitor bank replacements, and transformer replacement at Altavista. It includes project drivers, problem statements, area maps, estimated costs, and in-service schedules.‡ Extracted: Names 13 substations: Altavista, Boykins Substation, Chancellor, Chase City, Dryburg, Guill Town and 7 more. 6 projects, 2 with a printed cost estimate, 2 with a printed customer load (22.4MW, 8.9MW). |
Substation Expansions: DOM |
| 2026-09-17* | PPL local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL's 2026 local plan submission details proposed supplemental projects in Rutherford, Frackville, Mount Carmel, Girardville, Muncy, Harwood, Callender Gap, Orefield, Highspire, Black Creek, and other Pennsylvania areas. Work includes customer interconnections, line rebuilds, transformer replacements, switchyard upgrades, and tap extensions. Project materials include problem statements, proposed solutions, cost estimates, projected in-service dates, area maps, and single-line diagrams.‡ Extracted: Names 83 substations: Acahela, Allentown, Avoca, Bear Creek, Berks, Big Bass and 77 more. 40 projects, 39 with a printed cost estimate, 8 with a printed customer load (1,980 MW, 500 MW, 1000 MW, 450 MW, …). |
Substation Expansions: PPL |
| 2026-09-08* | ACE local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
The utility's 2024 local plan presentation for the ACE Transmission Zone presents supplemental projects across Salem County, NJ, Logan area, Churchtown, Woodstown, Mickleton, and Glassboro NJ region. It outlines a new customer line, substation construction, line rebuilds, and transformer additions and replacements, accompanied by area maps, project diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 9 substations: Beckett, Churchtown, Lamb, Mickleton, Nortonville, Paulsboro and 3 more. 5 projects, 5 with a printed cost estimate. |
Substation Expansions: ACE |
| 2026-09-08* | ACE local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
The utility's 2025 Local Plan presentation details a supplemental project to rebuild the Pine Hill substation as a 7-position GIS facility and split the Sickler-Pine Hill-Stratford line. It includes problem statements, selected solutions, estimated costs, projected in-service dates, and area maps.‡ Extracted: Names 3 substations: Pine Hill, Sickler, Stratford. 1 project, 1 with a printed cost estimate. |
Substation Expansions: ACE |
| 2026-09-08* | AEP local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
AEP Transmission Zone's Local Plan 2024 presentation outlines supplemental project submissions across Indiana, Ohio, Kentucky, and Virginia, including areas like Fort Wayne, New Albany, and Columbus. It details customer connections, line rebuilds, equipment replacements, and substation expansions, accompanied by problem statements, project descriptions, cost estimates, target in-service dates, geographic maps, and network bubble diagrams.‡ Extracted: Names 225 substations: Albion, Amlin, Anchor Hocking, Anguin, Apple Grove, Armory and 219 more. 38 projects, 38 with a printed cost estimate, 17 with a printed customer load (13MW, 12 MW, 760MW, 450 MW, …). |
Substation Expansions: AEP |
| 2026-09-08* | AEP local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
The utility's presentation for the AEP Transmission Zone M-3 Process outlines proposed supplemental projects across Indiana, Ohio, and the area, including line rebuilds, breaker replacements, and customer load interconnections. The document provides project drivers, problem statements, cost estimates, projected in-service dates, alternatives considered, scope changes, area maps, and one-line diagrams.‡ Extracted: Names 52 substations: Aladdin station, Bass, Bellard station, Bexley, Boundary station, Charger Station and 46 more. 15 projects, 15 with a printed cost estimate, 2 with a printed customer load (43 MW, 1100MW). |
Substation Expansions: AEP |
| 2026-09-08* | AMPT local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
AMP Transmission presents supplemental projects in the ATSI and Dayton transmission zones, addressing Pioneer, Tipp City, Piqua, and Napoleon, Ohio, and Miami County. It outlines customer service connections, line rebuilds, substation conversions, and transformer additions, supported by area maps, before-and-after single-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 20 substations: Canal, East Fayette, Enterprise, Hardin, Kessler, Kexon and 14 more. 5 projects, 5 with a printed cost estimate, 4 with a printed customer load (8 MW, 10MW, 43 MW, 40MW). |
Substation Expansions: AMPT |
| 2026-09-08* | AMPT local plan submission of the supplemental projects for 2026 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
A transmission presentation details supplemental projects across the DAY, ATSI, and AEP zones in Versailles, Bowling Green, Orrville, and Niles. It covers new substations, line rebuilds, customer load connections, and breaker additions, with geographic area maps, single-line diagrams, project cost estimates, and projected in-service dates.‡ Extracted: Names 19 substations: Apple Ave, Baker Road, Cloverdale, East Wooster, Greenlawn, Gypsy Lane and 13 more. 5 projects, 5 with a printed cost estimate, 3 with a printed customer load (16 MW, 60 MW, 63 MW). |
Substation Expansions: AMPT |
| 2026-09-08* | APS local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the Subregional RTEP Committee details supplemental projects across the APS transmission zone, including data center and customer connections, relay upgrades, transformer replacements, and line rebuilds. It includes scope summaries, area maps, single-line diagrams, and project tables detailing line ratings, estimated costs, and target in-service dates.‡ Extracted: Names 136 substations: Albright Substation, Allenport, Antietam, Armstrong Substation, Back Fork, Bedington and 130 more. 58 projects, 37 with a printed cost estimate, 16 with a printed customer load (576 MW, 300 MW, 360 MW, 100 MVA, …). |
Substation Expansions: APS |
| 2026-09-08* | APS local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the APS Transmission Zone proposes supplemental projects including relay replacements, line rebuilds, switch upgrades, transformer replacements at Monocacy, Pruntytown, and Wylie Ridge, and a customer connection substation (Quantum 400). Slides include problem statements, scope descriptions, geographic maps, one-line diagrams, line ratings, estimated costs, and target in-service dates.‡ Extracted: Names 62 substations: Albright Substation, Arroyo Junction, Bedington, Bethel Park Substation, Black Oak, Blacksville No. 1 Tap and 56 more. 30 projects, 30 with a printed cost estimate, 3 with a printed customer load (~25 MW, approximately 300 MW, approximately 300 MW). |
Substation Expansions: APS |
| 2026-09-08* | ATSI local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy's presentation presents supplemental projects in the AEP and ATSI transmission zones, including Huron County, Pioneer, Lorain, and East Springfield. It details line rebuilds, breaker and relay replacements, transformer upgrades, and customer connections, accompanied by problem statements, area maps, single-line schematics, line rating tables, and cost estimates.‡ Extracted: Names 78 substations: Abbe, Adams, Andover, Angola, Beaver, Bingham and 72 more. 43 projects, 43 with a printed cost estimate, 19 with a printed customer load (6 MVA, 9.6 MVA, 25 MVA, 200 MVA, …). |
Substation Expansions: ATSI |
| 2026-09-08* | ATSI local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
FirstEnergy's presentation for the ATSI Transmission Zone outlines supplemental projects including customer connections, line reconductoring and rebuilds, substation expansions, breaker replacements, and transformer replacements across locations such as Abbe, Medina, Angola, Midway, Longview, South Akron, Cardington, Beaver, and Ravenna. It contains project drivers, problem statements, line rating changes, estimated costs, in-service dates, area maps, and one-line diagrams.‡ Extracted: Names 57 substations: Abbe, Angola, Avon, Bayshore, Beaver, Beaver Valley and 51 more. 21 projects, 21 with a printed cost estimate, 5 with a printed customer load (11.2 MVA, 6 MVA, 6 MVA, 540 MVA, …). |
Substation Expansions: ATSI |
| 2026-09-08* | BGE local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
BGE's 2024 local plan presentation submits supplemental projects covering circuit breaker replacements at Pumphrey, Waugh Chapel, and Windy Edge substations, as well as rebuilding the Riverside 115kV station into a 12-position GIS breaker-and-a-half substation. The presentation includes need numbers, problem statements, selected solutions, estimated costs, projected in-service dates, and area maps.‡ Extracted: Names 4 substations: Pumphrey, Riverside, Waugh Chapel, Windy Edge. 10 projects, 10 with a printed cost estimate. |
Substation Expansions: BGE |
| 2026-09-08* | BGE local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
BGE's 2025 Local Plan presentation details supplemental project submissions for circuit breaker replacements at Waugh Chapel, Windy Edge, and Granite substations due to deteriorating equipment condition. The presentation includes need numbers, problem statements, area maps, project statuses, estimated costs per project, and projected in-service dates.‡ Extracted: Names 3 substations: Granite, Waugh Chapel, Windy Edge. 9 projects, 9 with a printed cost estimate. |
Substation Expansions: BGE |
| 2026-09-08* | ComEd local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
The utility's 2024 ComEd Transmission Zone M-3 presentation submits supplemental projects addressing Goodings Grove, Kincaid, Pana, State, Wilton Center, Des Plaines, Franklin Park, Natoma, Dekalb, Manteno, Oak Park, Park Forest, Libertyville, South Pecatonica, and Belvidere. It details substation rebuilds, circuit breaker replacements, line rebuilds, transformer installations, and customer connections alongside area maps, ratings tables, costs, and schedules.‡ Extracted: Names 23 substations: Des Plaines, ESSB-427, Fordham, Franklin Park, Freeport, Goodings Grove and 17 more. 14 projects, 14 with a printed cost estimate, 4 with a printed customer load (210 MW, 113 MW, 13 MW, 42 MW). |
Substation Expansions: ComEd |
| 2026-09-08* | ComEd local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
The utility's Local Plan 2025 presentation details supplemental projects across Hoffman Estates, Elk Grove, Elmhurst, Itasca, Burnham, Aurora, Dresden, Devon, and Lombard. The slide deck presents customer service connections, line extensions, circuit breaker replacements, and wave trap upgrades, supported by geographic area maps, single-line schematics, ratings tables, cost estimates, and projected in-service dates.‡ Extracted: Names 23 substations: Bloom, Burnham, Davis Creek, Des Plaines, Devon, Dierking and 17 more. 15 projects, 15 with a printed cost estimate, 8 with a printed customer load (324 MW, 270 MW, 103 MW, 272.7 MW, …). |
Substation Expansions: ComEd |
| 2026-09-08* | Dayton local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
The utility's local plan presentation outlines supplemental transmission projects across the area, Clinton County, Mercer County, Auglaize County, and Miami County. It covers proposed substation rebuilds, expansions, ring bus additions, and line rebuilds to address customer load growth and equipment reliability, supported by problem statements, project scopes, cost estimates, target in-service dates, and system maps.‡ Extracted: Names 30 substations: Air Park, Air Park 69kVSubstation, Airpark, Amsterdam, Caesars Creek, Clinton and 24 more. 5 projects, 4 with a printed cost estimate, 2 with a printed customer load (35MW, 40MW). |
Substation Expansions: Dayton |
| 2026-09-08* | DEOK local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio & Kentucky's 2024 local plan presents supplemental transmission projects at Woodsdale, Port Union, Carlisle, Mitchell, Foster, Merrel, Dayton Technologies, Worthington Steel, Millville, Layhigh, and Evendale. Work covers breaker replacements, line reconductoring, transformer additions, and customer connections, accompanied by area maps, line diagrams, estimated transmission costs, and proposed in-service dates.‡ Extracted: Names 21 substations: Carlisle, Colerain, Dayton Technologies, Evendale, Foster, Kemper and 15 more. 10 projects, 10 with a printed cost estimate, 1 with a printed customer load (15 MW). |
Substation Expansions: DEOK |
| 2026-09-08* | DEOK local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio & Kentucky's 2025 local plan presentation covers line retirement, substation modifications, a new substation, and customer load service across Petersburg, Florence, and Butler County. It details projects for Miami Fort – Clifty Creek, Markley, Turfway, and Trenton, featuring problem statements, proposed solutions, estimated transmission costs, proposed in-service dates, and area maps.‡ Extracted: Names 11 substations: Aero, Clifty Creek, Constance, Donaldson, Limaburg, Markley and 5 more. 4 projects, 4 with a printed cost estimate, 1 with a printed customer load (500 MW). |
Substation Expansions: DEOK |
| 2026-09-08* | DLCO local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
The utility presents supplemental projects for inclusion in the 2024 Local Plan across Pittsburgh and West Mifflin, PA. It covers establishing the new Veterans Bridge Substation for a customer load connection, breaker and relay replacements at Brunot Island Substation, and transformer replacements at Dravosburg Substation, accompanied by area maps, diagrams, costs, and schedules.‡ Extracted: Names 4 substations: Brunot Island, Dravosburg Substation, Forbes, Veterans Bridge Substation. 3 projects, 3 with a printed cost estimate, 1 with a printed customer load (20 MW). |
Substation Expansions: DLCO |
| 2026-09-08* | DLCO local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
The utility's 2025 Local Plan presentation details supplemental projects (DLC-2025-001 through DLC-2025-004) to replace aged 138kV oil breakers at Carson, Dravosburg, Findlay, and Neville substations. It includes problem statements, estimated costs, projected in-service dates, and area maps.‡ Extracted: Names 4 substations: Carson Substation, Dravosburg Substation, Findlay Substation, Neville Substation. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: DLCO |
| 2026-09-08* | Dominion local plan submission of the supplemental projects for 2024 Local plan submission · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Dominion Energy's 2024 Local Plan presents proposed supplemental projects across Prince William County, Loudoun County, Henrico, and Virginia Beach. Work includes line rebuilds, customer delivery point connections, transformer replacements, and series reactor installations, illustrated with problem statements, area maps, single-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 158 substations: Alexander Corner, Alleghany, Allen Creek, Allied, Altair, Anaconda and 152 more. 90 projects, 88 with a printed cost estimate, 58 with a printed customer load (134 MW, 134 MW, 63.3 MW, 147.0 MW, …). |
Substation Expansions: DOM |
| 2026-09-08* | EKPC local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
EKPC's 2024 local plan presents supplemental transmission and distribution projects across areas including Fayette-Baker Lane, North Lebanon, Gordon Lane, Clay Village-New Castle, Big Hill, North Springfield-Loretto, Snow Tap-North Albany, West Shepherdsville, Metts Dr, KU Fawkes-West Berea, Stephensburg-Bonnieville, Green County/Coburg Junction, Elizabethtown, and Windsor-Somerset, featuring line rebuilds, new substations, area maps, and single-line diagrams.‡ Extracted: Names 72 substations: Albany, Avon, Baker Lane, Bass, Big Hill, Bonnieville and 66 more. 16 projects, 16 with a printed cost estimate, 2 with a printed customer load (18 MW, 9 MW). |
Substation Expansions: EKPC |
| 2026-09-08* | EKPC local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
EKPC's 2025 Local Plan presentation details supplemental project submissions and scope changes in Zachariah, Munfordville, Cooper, and Dale Station to Newby. It outlines line rebuilds, new lines, distribution substation work, substation rebuilds, and capacitor bank installation, accompanied by problem statements, project alternatives, cost estimates, in-service dates, area maps, and simplified network diagrams.‡ Extracted: Names 16 substations: Bonnieville, Bowen, Cooper, Crooksville, Cub Run, Dale and 10 more. 5 projects, 5 with a printed cost estimate. |
Substation Expansions: EKPC |
| 2026-09-08 | Item 05 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the APS Transmission Zone covers customer service connection needs and solutions near Sage, Hatfield, Doubs, and Lime Kiln substations. It details requests for 165 MW, 900 MW, 368 MW, and 1000 MW loads, new substation construction, line loops, breaker additions, area maps, schematics, and estimated project costs.‡ Extracted: Names 8 substations: Ballenger Substation, Doubs, Hatfield Substation, Lime Kiln, Quantum 200, Quantum 300 Substation and 2 more. 4 projects, 2 with a printed cost estimate, 4 with a printed customer load (165 MW, 900 MW, 368 MW, 1000 MW). |
Substation Expansions: APS |
| 2026-09-08 | Item 06 - MetEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd transmission zone details need number ME-2026-012 for a new customer connection near Portland Substation requesting 230 kV service for up to 1000 MW. The document includes a project problem statement, a requested in-service date of 01/14/2031, an area map, and a high-level M-3 meeting schedule.‡ Extracted: Names 1 substation: Portland Substation. 1 project, 1 with a printed customer load (1000 MW). |
Substation Expansions: Met-Ed |
| 2026-09-08 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL Transmission Zone supplemental project presentations propose customer-driven solutions near Mt Carmel and Harrisburg, PA. Proposed work includes the Natalie 500-230kV Substation, Bressler 230kV Switchyard, line rebuilds, bifurcations, and switchyard expansions, supported by geographic area maps, single-line network schematics, project cost estimates, ratings tables, and projected in-service dates.‡ Extracted: Names 18 substations: Bressler 230kV Switchyard, Brunner Island, Catawissa, Columbia, Copperstone, Frackville and 12 more. 2 projects, 2 with a printed cost estimate, 2 with a printed customer load (2,000 MW, 900 MW). |
Substation Expansions: PPL |
| 2026-09-08 | Item 08 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Duke Energy Ohio & Kentucky's presentation outlines revised solutions for customer load request DEOK-2025-003 near Trenton in Butler County, OH. It details construction of new Wayne-Madison and Cotton Run substations, 345 kV circuits, and line rebuilds between Port Union, Todhunter, Miami Fort, and Willey, accompanied by area maps, schematics, and cost estimates.‡ Extracted: Names 11 substations: Beckett, Cotton Run, Miami Fort, Millikin, Morgan, Port Union and 5 more. 1 project, 1 with a printed customer load (800 MW). |
Substation Expansions: DEOK |
| 2026-09-08 | Item 09 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
PSE&G's presentation for the Transmission Expansion Advisory Committee outlines a transmission need (PSEG-2026-0004) in the Farragut – Hudson Area regarding the out-of-service B-3402 and C-3403 high pressure fluid-filled transmission circuits. The document includes a problem statement, driver details, and an area map.‡ Extracted: No substation names extracted. 1 project. |
Substation Expansions: PSEG |
| 2026-09-08 | Item 10 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
The utility's supplemental projects presentation covers transmission line rebuilds, capacitor bank replacements, breaker additions, and multiple canceled customer data center load connections across Prince William and Hanover counties. The presentation includes area maps, single-line configuration sketches, and cost and schedule tables for projects involving Line #2035, Line #2117, Line #298, and various substations.‡ Extracted: Names 31 substations: Aphrodite, Artemis, Bremo, Caesar, CIA, Clifton and 25 more. 13 projects, 4 with a printed cost estimate, 9 with a printed customer load (60MW, 47.0 MW, 100 MW, 100 MW, …). |
Substation Expansions: DOM |
| 2026-09-08* | JCPL local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's presentation for the JCPL zone details supplemental projects including line rebuilds, customer connections, relay upgrades, submarine cable replacement, and transformer replacements at Vernon, Franklin, and Cookstown substations. It includes need descriptions, selected solutions, ratings, estimated costs, projected in-service dates, area maps, and single-line schematics.‡ Extracted: Names 86 substations: Air Reduction, Allenhurst Substation, Atlantic, Bernardsville, Bradley Beach, Branchville and 80 more. 70 projects, 67 with a printed cost estimate, 2 with a printed customer load (67 MW, 13.9 MW). |
Substation Expansions: JCPL |
| 2026-09-08* | JCPL local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
The utility's 2025 local plan presents supplemental projects in Whippany, Montville, Greystone, Sayreville, and other areas. Proposed work includes line rebuilds, transformer and breaker replacements, automatic restoration upgrades, and customer connections, accompanied by problem statements, project descriptions, cost estimates, projected in-service dates, one-line diagrams, and area maps.‡ Extracted: Names 33 substations: Alderney, Chester Substation, Coke, Davis, Deep Run Substation, Englishtown and 27 more. 17 projects, 17 with a printed cost estimate, 1 with a printed customer load (13 MW). |
Substation Expansions: JCPL |
| 2026-09-08* | Met-Ed local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy presents supplemental projects for inclusion in the Met-Ed Transmission Zone local plan. It details customer connections, ring bus conversions, line rebuilds, and transformer replacements across substations including South Reading, Hokes, Campbelltown, Smith Street, Northkill, and Violet Hill, supported by geographic maps, one-line diagrams, project cost estimates, and projected in-service dates.‡ Extracted: Names 38 substations: Allentown Cement, Baldy 69 kV Substation, Berks, Bernville, Birdsboro Extrusions Substation, Birdsboro Substation and 32 more. 17 projects, 17 with a printed cost estimate, 3 with a printed customer load (12 MVA, 13 MVA, 22 MVA). |
Substation Expansions: Met-Ed |
| 2026-09-08* | Met-Ed local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
The utility's transmission zone 2025 local plan presentation covers line rebuilds, customer connections, ring bus constructions, and transformer installations at Campbelltown, Middletown Junction, Swatara Hill, Raintree, Cleona, Mountain, North Hershey, and Belfast substations. It includes problem statements, proposed solutions, cost estimates, projected in-service dates, geographic maps, and single-line diagrams.‡ Extracted: Names 20 substations: Alcoa, Belfast, Broad St., Campbelltown Substation, Cleona, Gardners and 14 more. 7 projects, 7 with a printed cost estimate, 3 with a printed customer load (11 MW, 31.8 MW, 78 MW). |
Substation Expansions: Met-Ed |
| 2026-09-08* | ODEC local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ODEC · Old Dominion Electric Cooperative |
The utility's 17, 2024 submission for inclusion in the Local Plan presents supplemental projects in the transmission zone. It details the 20-mile 6750 Kellam-Cheriton 69kV rebuild and the 6745/46 69kV Chincoteague cable replacement, featuring problem statements, proposed solutions, alternatives, estimated costs, projected in-service dates, area maps, and route diagrams.‡ Extracted: Names 7 substations: Bayview, Cheriton, Cheriton/Bayview, Chincoteague station, Kellam, Tasley and 1 more. 2 projects, 2 with a printed cost estimate. |
Substation Expansions |
| 2026-09-08* | PECO local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
PECO's 2024 local plan presents transmission line rebuilds, facility upgrades, and a substation rebuild for the Plymouth Meeting, Flint, Upper Merion, Warrington, Tacony, Planebrook, and Bradford facilities. It includes area maps, simplified connection diagrams, problem statements, ratings tables, estimated costs, and projected in-service dates.‡ Extracted: Names 7 substations: Bradford, Flint, Planebrook, Plymouth Meeting, Tacony, Upper Merion and 1 more. 6 projects, 6 with a printed cost estimate. |
Substation Expansions: PECO |
| 2026-09-08* | PECO local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
PECO's 2025 Local Plan submission details supplemental projects addressing North Philadelphia, Byberry, Neshaminy, and Peach Bottom. It covers transformer additions, circuit breaker replacements, station reconfigurations to ring bus setups, and relay upgrades, providing problem statements, drivers, estimated costs, in-service dates, area maps, and station connection diagrams.‡ Extracted: Names 3 substations: Byberry, Neshaminy, Peach Bottom. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: PECO |
| 2026-09-08* | Penelec local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
FirstEnergy presents supplemental projects for the Penelec transmission zone submitted for inclusion in the Local Plan. Project proposals address Westfall, Yeagertown, Altoona, Hollidaysburg, Niles Valley, Shawville, Homer City, Johnstown, Portage, Dubois, and Erie South facilities, featuring transformer replacements, line taps for new customers, relay upgrades, reconductoring, single-line schematics, area maps, and estimated costs.‡ Extracted: Names 41 substations: Altoona, Belleville, Belleville New Holland, Blairsville East, Carlisle Pike, Dubois and 35 more. 19 projects, 18 with a printed cost estimate, 3 with a printed customer load (30 MW, 22 MW, 23 MW). |
Substation Expansions: Penelec |
| 2026-09-08* | Penelec local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
The utility's local plan presentation covers supplemental projects including line rebuilds, breaker replacements, and terminal upgrades across Pennsylvania locations such as Piney, Grandview, Ashtabula, Erie West, Altoona, Hollidaysburg, and Tyrone North. The material includes geographic area maps, single-line diagrams, scopes of work, and estimated project cost and schedule details.‡ Extracted: Names 24 substations: Altoona, Ashtabula, Ashville, Belsano, Burma, Eclipse Substation and 18 more. 7 projects, 7 with a printed cost estimate. |
Substation Expansions: Penelec |
| 2026-09-08* | PEPCO local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Pepco · Pepco |
PEPCO's 2024 supplemental project submission for the Local Plan presents circuit breaker replacements at the Lanham, Buzzard Point, Bowie, Burches Hill, Morgantown, O Street, and Bells Mill substations. The presentation includes problem statements, estimated costs, projected in-service dates, project statuses, and area maps.‡ Extracted: Names 7 substations: Bells Mill, Bowie, Burches Hill, Buzzard Point, Lanham, Morgantown and 1 more. 15 projects, 15 with a printed cost estimate. |
Substation Expansions: Pepco |
| 2026-09-08* | PEPCO local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Pepco's local plan submission for the PEPCO Transmission Zone covers project PEP-2024-003 at Mt. Zion Substation. It details installing 230kV breakers, replacing disconnect switches with motor-operated disconnects, and adding relays and telecom equipment, accompanied by an area map, and estimated costs.‡ Extracted: Names 1 substation: Mt. Zion Substation. 1 project, 1 with a printed cost estimate. |
Substation Expansions: Pepco |
| 2026-09-08* | PPL local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL Transmission Zone supplemental projects for the 2024 Local Plan present line rebuilds, circuit additions, customer service taps, and substation work across Williamsport, Hazelton, Lock Haven, Frailey, Carlisle, and New Kingston, PA. Slides include problem statements, proposed solutions, alternatives considered, cost estimates, projected in-service dates, geographic maps, and one-line schematics.‡ Extracted: Names 31 substations: Berks, Bernheisel, Buxmont, Carlisle, Cass, Cumberland and 25 more. 14 projects, 14 with a printed cost estimate, 6 with a printed customer load (40-45 MWs, 6.5 MW, 10 MVA, 13-18 MWs, …). |
Substation Expansions: PPL |
| 2026-09-08* | PPL local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL's 2025 local plan presents supplemental transmission projects in areas including Beavertown, Middleburg, Penns, Lancaster, Harwood, Alburtis, Wescosville, Lackawanna, Blooming Grove, Tresckow, Breinigsville, Summit, Old Forge, and Exeter. It covers customer load connections, line rebuilds, switchyard additions, and transformer replacements, featuring problem statements, proposed solutions, cost estimates, target dates, area maps, and one-line diagrams.‡ Extracted: Names 37 substations: Alburtis, Avoca, Beavertown, Blooming Grove, Breinigsville, Dillerville and 31 more. 16 projects, 16 with a printed cost estimate, 6 with a printed customer load (350 MW, 1,000 MW, 1,000 MW, 350 MW, …). |
Substation Expansions: PPL |
| 2026-09-08* | PSEG local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
PSE&G's 2024 local plan submissions present supplemental projects across the East Rutherford, Newark Bay, South Edison, Perth Amboy, Harlingen, Plainfield, and Kenilworth areas. The document includes problem statements, proposed solutions—such as substation upgrades, line additions, cable replacements, and communications upgrades—as well as area maps, single-line diagrams, cost estimates, and projected in-service dates.‡ Extracted: Names 27 substations: Aldene, Bayonne, Bennetts Lane, Deans, E Windsor, East Rutherford and 21 more. 10 projects, 10 with a printed cost estimate, 1 with a printed customer load (8.0MW). |
Substation Expansions: PSEG |
| 2026-09-08* | PSEG local plan submission for 2025 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
PSE&G's 2025 local plan presentation covers projects in Newark Bay, South Brunswick in Middlesex County, Lumberton, East Rutherford, and Kenilworth. Work includes cable replacements, data center connections, a new 230-13kV substation, and transformer replacements, illustrated with aerial maps, single-line diagrams, project drivers, estimated costs, and projected in-service dates.‡ Extracted: Names 11 substations: Bayonne, Cookstown, East Rutherford, Galloping Hill, Lumberton, Pemberton and 5 more. 5 projects, 5 with a printed cost estimate, 2 with a printed customer load (35 MW, 60 MW). |
Substation Expansions: PSEG |
| 2026-09-08* | PSEG local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
PSE&G's 2026 local plan submission presents supplemental projects for the Newark Area, Mount Laurel Area, and other areas. It details new 230-13kV substations and 69kV circuit rebuilds alongside problem statements, aerial maps, one-line diagrams, estimated costs, and projected in-service dates.‡ Extracted: Names 9 substations: Burlington, Cox’s Corner, Creek Rd, Gloucester, Lawnside, McCarter Switching station and 3 more. 4 projects, 4 with a printed cost estimate. |
Substation Expansions: PSEG |
| 2026-09-08* | UGI local plan submission for 2024 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
A utility presentation submits a supplemental project (need UGI-2022-0001) for inclusion in the Local Plan to address Hunlock-Mountain #1 line thermal violations. It details constructing a bus at Hanover Substation and extending the Hanover Tap line to Loomis Substation, supported by area maps, a single-line diagram, costs, and schedules.‡ Extracted: Names 4 substations: Hanover, Hunlock, Loomis Substation, Mountain. 1 project, 1 with a printed cost estimate. |
Substation Expansions: UGI |
| 2026-09-08* | UGI local plan submission for 2026 RTEP Local plan submission · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
UGI's 2026 Local Plan presentation details supplemental projects in the UGI Transmission Zone, including reconductoring and tower replacements on the Plymouth to Palooka line and constructing the new 8th Street Substation near Swoyersville. The document includes problem statements, cost estimates, projected in-service dates, area maps, and simplified connection diagrams.‡ Extracted: Names 4 substations: 8th Street Substation, Palooka, Plymouth, Swoyersville. 2 projects, 2 with a printed cost estimate. |
Substation Expansions: UGI |
| 2026-09-08* | WVPA local plan submission of the supplemental projects for 2024 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM WVPA · Wabash Valley Power Alliance |
The utility's 2024 local plan presentation for the AEP Transmission Zone details project WVPA-2022-001 near Portland, Indiana. It presents a new 69/12kV Mt Zion substation, new 69kV transmission lines, and a 69kV rebuild connecting Burr Oak to Trinity, accompanied by cost estimates, in-service dates, geographic maps, and one-line diagrams.‡ Extracted: Names 9 substations: AEP-Marathon, AES-Marathon, Berne, Burr Oak, Marathon, Mt Zion and 3 more. 1 project, 1 with a printed customer load (14MW). |
Substation Expansions: WVPA |
| 2026-09-08* | WVPA local plan submission of the supplemental projects for 2025 RTEP Local plan submission · SRRTEP Western · retrieved 2026-10-16 |
PJM WVPA · Wabash Valley Power Alliance |
The utility's 2025 local plan presentation covers need WVPA-2025-001 in Elderberry, IN and Stillwell, IN. It proposes constructing 15 miles of new line between the utility's substation and the neighboring utility's substation along with expanding the substation bus, accompanied by an area map, diagram, and cost estimates.‡ Extracted: Names 2 substations: Elderberry Substation, Stillwell substation. 1 project, 1 with a printed cost estimate. |
Substation Expansions: WVPA |
| 2026-08-28 | Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 Tariff · retrieved 2026-10-20 |
PJM Ohio Power Company (AEP Ohio) · OH |
Cited in the Ohio Power Company (AEP Ohio) record (Schedule DCT (Data Center Tariff); Public Utilities Commission of Ohio, docket 24-508-EL-ATA, 26-113-EL-ATA, 25-392-EL-AIR): source of 17 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2026-08-26 | Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) Testimony or other commission document · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280): source of 6 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2026-08-14 | Item 01 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
FirstEnergy's presentation for the APS Transmission Zone covers customer load connections near Cecil Substation and Kearneyville Substation, line condition rebuild needs for the Belmont - Richwood Hill 138 kV Line, and metering upgrades at Joffre 138 kV Substation. It includes problem statements, area maps, line ratings, estimated project costs, and an M-3 meeting schedule.‡ Extracted: Names 5 substations: Belmont, Cecil, Joffre Substation, Kearneyville Substation, Richwood Hill. 4 projects, 1 with a printed cost estimate, 2 with a printed customer load (approximately 29 MW, approximately 250 MW). |
Substation Expansions: APS |
| 2026-08-14 | Item 02 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
The utility's 14, 2026 Subregional RTEP Committee presentation for the ATSI Transmission Zone outlines needs and proposed solutions. It covers settling issues, control house congestion, bus-tie breaker installation, and line reconductoring associated with Babb, Jordan, Star, and Ivy substations, and the Beaver-Henrietta line, supported by area maps, line ratings, and estimated project costs.‡ Extracted: Names 28 substations: Babb Substation, Babcock Wilcox Tap, Barberton, Beaver, Brighton Tap, Clinic Hospital and 22 more. 5 projects, 2 with a printed cost estimate, 2 with a printed customer load (56 MW, 29 MW). |
Substation Expansions: ATSI |
| 2026-08-14 | Item 03 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
The presentation outlines customer load connections and equipment condition needs across Monroe Township in Licking County, Upper Sandusky, and Cadiz, Ohio. It features area maps, one-line diagrams, estimated costs, and schedules for projects including the Kiwi 138kV Delivery Point, Rockhill transformers, and Robb Avenue circuit breakers.‡ Extracted: Names 9 substations: Freebyrd, Gable, Kiwi, Nottingham, Robb Avenue, Rockhill OP and 3 more. 5 projects, 1 with a printed cost estimate, 2 with a printed customer load (690 MW, 140 MW). |
Substation Expansions: AEP |
| 2026-08-14 | Item 04 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
ComEd presents M-3 process needs in the ComEd transmission zone, covering Wolfs Crossing to Montgomery, Bellwood, LaGrange Park, and McCook. Needs identify deteriorating wood poles on lines and outdated Power Line Carrier communication equipment, accompanied by area maps and a high-level meeting schedule.‡ Extracted: Names 5 substations: Bellwood, LaGrange Park, McCook, Montgomery, Wolfs Crossing. 2 projects. |
Substation Expansions: ComEd |
| 2026-08-14 | Item 05 - DLCO Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
The utility's 14, 2026 Subregional RTEP presentation identifies customer service interconnection needs for new data centers in Midland, Rochester, and McKees Rocks, Pennsylvania, requesting up to 500 MW, 300 MW, and 345 MW respectively. It includes problem statements, area maps, and an M-3 meeting schedule table.‡ Extracted: No substation names extracted. 3 projects, 3 with a printed customer load (500 MW, 300 MW, 345 MW). |
Substation Expansions: DLCO |
| 2026-08-14 | Item 06 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
A presentation outlines need EKPC-2026-001 in Casey County, KY, addressing system protection and operational flexibility concerns for ~32 miles of 161 kV transmission line and the 161/69 kV transformer at Casey Co. It contains an area map and an M-3 process schedule.‡ Extracted: Names 1 substation: Casey Co. 1 project. |
Substation Expansions: EKPC |
| 2026-08-13 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
The utility presents needs for supplemental projects in the transmission zone, covering Mecklenburg Electric Cooperative customer load requests at the Burlington Delivery Point and replacement of the Altavista TX#3 transformer bank. The presentation includes area maps, detailed equipment problem statements, an M-3 meeting schedule, and revision history.‡ Extracted: No substation names extracted. 2 projects, 1 with a printed customer load (30 MW). |
Substation Expansions: DOM |
| 2026-08-13 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's presentation for the JCPL Transmission Zone covers need withdrawals, substation breaker replacements, and line rebuilds. It details projects involving Chester, Old Bridge, Riverdale, Gilbert, Rocktown Road, Branchville, and Newton, featuring area maps, line ratings, terminal equipment limitations, estimated costs, and M-3 planning schedules.‡ Extracted: Names 27 substations: Alexauken, Alexauken SW PT, Anheuser Busch, Branchville, Bridgeton, Chester Substation and 21 more. 7 projects, 2 with a printed cost estimate. |
Substation Expansions: JCPL |
| 2026-08-13 | Item 03 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
FirstEnergy's presentation for the MetEd Transmission Zone details customer connection needs on the Carsonia - Lyons - North Boyertown 69 kV 75 Line and the Cly - Smith Street 115 kV Line. It also presents a proposed solution to rebuild the Muhlenberg - North Temple 69 kV 834 Line, accompanied by area maps, ratings, and cost estimates.‡ Extracted: Names 8 substations: Carsonia, Cly, Lyons, Muhlenberg Substation, North Boyertown, North Temple and 2 more. 3 projects, 1 with a printed cost estimate, 2 with a printed customer load (approximately 13 MW, approximately 10 MW). |
Substation Expansions: Met-Ed |
| 2026-08-13 | Item 04 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
FirstEnergy's presentation for the Penelec transmission zone details a proposed supplemental project to rebuild approximately 11.9 miles of the Eagle Valley – Philipsburg 115 kV Line with new conductor and upgrade terminal equipment. It includes a problem statement, line ratings, estimated project costs, an in-service date, and a location map.‡ Extracted: Names 2 substations: Eagle Valley, Philipsburg. 1 project, 1 with a printed cost estimate. |
Substation Expansions: Penelec |
| 2026-08-13 | Item 05 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
The utility's presentation to the Sub-Regional RTEP Committee details supplemental customer service needs and proposed solutions in Northampton, PA, Lansford, Jack Frost, Old Forge, Meckesville, and Hickory Run. It covers line taps, a yard rebuild at Siegfried, and switches, accompanied by area maps, single-line schematics, and cost and schedule estimates.‡ Extracted: Names 9 substations: Hickory Run, Hosensack, Jack Frost, Lansford, Meckesville, Milford and 3 more. 7 projects, 1 with a printed cost estimate, 1 with a printed customer load (299 MW). |
Substation Expansions: PPL |
| 2026-08-05 | PUCO Commission meeting minutes, August 5, 2026 Testimony or other commission document · retrieved 2026-10-20 |
PJM Ohio Power Company (AEP Ohio) · OH |
Cited in the Ohio Power Company (AEP Ohio) record (Schedule DCT (Data Center Tariff); Public Utilities Commission of Ohio, docket 24-508-EL-ATA, 26-113-EL-ATA, 25-392-EL-AIR): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2026-08-04 | Item 04 - ATSI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
The utility's transmission zone presentation reviews supplemental projects, including a customer connection near Lake Avenue Substation, equipment replacements on the Chamberlin-Harding 345 kV S-21 Line, and a scope change involving Dowling, Fulton, and Melbourne substations. It includes need and solution descriptions, cost and in-service estimates, and area maps.‡ Extracted: Names 9 substations: Chamberlin, Delta, Dowling, Fulton, Harding, Lake Avenue and 3 more. 3 projects, 2 with a printed cost estimate. |
Substation Expansions: ATSI |
| 2026-08-04 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
FirstEnergy's presentation for the JCPL Transmission Zone covers needs at the Parlin 230 kV Switching Station and Greystone 230-34.5 kV Substation, plus transformer replacement scope changes for East Flemington. It includes problem statements, line and conductor ratings, estimated project costs, projected in-service dates, geographic maps, and one-line diagrams.‡ Extracted: Names 7 substations: Chilcott, Denville, East Flemington, Foll Hill, Greystone, Parlin and 1 more. 4 projects, 2 with a printed cost estimate. |
Substation Expansions: JCPL |
| 2026-08-04 | Item 06 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
AEP's Transmission Expansion Advisory Committee presentation covers a customer service need for a 1,300 MW load connection at 345 kV south of Maddox Creek station in Van Wert, OH. It includes an area map, project details, and an M-3 meeting schedule table.‡ Extracted: Names 1 substation: Maddox Creek. 1 project, 1 with a printed customer load (1,300 MW). |
Substation Expansions: AEP |
| 2026-08-04 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
PPL Transmission Zone's M-3 process presentation details customer service needs near Frackville, PA, for an approximately 750 MW customer load connection, and near Greenbrier, PA, for a source to a new substation. The slides include problem statements, driver details, requested in-service dates, and area maps.‡ Extracted: No substation names extracted. 2 projects, 2 with a printed customer load (750 MW, 10MW). |
Substation Expansions: PPL |
| 2026-08-04 | Item 08 - ACE Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
A transmission zone presentation to the TEAC outlines the withdrawal of a supplemental need for a 49 MW customer load connection request in Cumberland County, NJ. It includes a project withdrawal table and the high-level M-3 process meeting schedule.‡ Extracted: No substation names extracted. 1 project, 1 with a printed customer load (49 MW). |
Substation Expansions: ACE |
| 2026-08-04 | Item 09 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
PECO's presentation for the August 4, 2026 TEAC Committee covers the withdrawal of a customer load need in Limerick, PA, operational flexibility needs at Richmond Substation, and circuit breaker replacements at Newlinville 230 kV Substation. It includes problem statements, area maps, a single-line schematic, cost estimates, and an M-3 meeting schedule.‡ Extracted: Names 5 substations: Bradford, Mittal Steel, Newlinville, Peach Bottom, Richmond. 3 projects, 1 with a printed cost estimate, 1 with a printed customer load (750 MW). |
Substation Expansions: PECO |
| 2026-08-04 | Item 10 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
ComEd presents an M-3 process solution meeting for the Blue Island Hardening project (need number ComEd-2026-011). The presentation includes replacing 345kV straight buses with ring buses and installing transformer high-side circuit breakers, accompanied by area maps, line rating tables, alternative solutions, and estimated costs.‡ Extracted: Names 1 substation: Blue Island. 1 project, 1 with a printed cost estimate. |
Substation Expansions: ComEd |
| 2026-08-04 | Item 11 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 4 substations: Beckjord, Pierce, Port Union, Woodsdale. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (300 MW). | Substation Expansions: DEOK |
| 2026-08-04 | Item 12 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
The utility's 2026 TEAC update presentation covers a customer load connection in Gainesville under need number DOM-2023-0011. It outlines the proposed Atlas Substation, 230 kV line extensions, and breaker additions at Gemini Substation, supported by an area map, connection schematic, and an updated project cost of $52.9 M.‡ Extracted: Names 4 substations: Atlas, Daves Store, Gemini, Trident. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (100 MW). |
Substation Expansions: DOM |
| 2026-08-04 | Item 13 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PJM · PJM system-wide |
The presentation for the Transmission Expansion Advisory Committee covers the 2026 RTEP Window 1 and 2024W1 scope changes across ComEd, Dominion, AEP, ATSI, and MAAC zones. It includes timeline milestones, area maps, problem statements, and scope and cost revisions for the Joshua Falls – Yeat 765 kV project (2024-W1-820).‡ Extracted: Names 7 substations: Bristers, Cloverdale, Elk Run, Joshua Falls, Meadowbrook, Vint Hill and 1 more. 1 project, 1 with a printed cost estimate. |
Substation Expansions: PJM |
| 2026-07-17 | Item 01 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 2 substations: Genoa South substation, Herbert. 3 projects, 3 with a printed customer load (21 MW, 100 MW, 500 MW). | Substation Expansions: AMPT |
| 2026-07-17 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 3 substations: Brodnax, Clubhouse, Rogers Rd Sub. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (25 MW). | Substation Expansions: DOM |
| 2026-07-17 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 4 substations: Brodnax, Clubhouse, Lewis Drive, Rogers Rd Sub. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (25 MW). | Substation Expansions: DOM |
| 2026-07-17 | Item 02 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 17 substations: Allenport, Armstrong Substation, Belmon, Butler, Charleroi, Iron Bridge and 11 more. 6 projects, 4 with a printed cost estimate, 1 with a printed customer load (10 MW). | Substation Expansions: APS |
| 2026-07-17 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 22 substations: Bernardsville, Captive Place Tap, Clifford Solar Substation, EH Werner, Gillette, Island Heights Tap and 16 more. 4 projects, 3 with a printed cost estimate. | Substation Expansions: JCPL |
| 2026-07-17 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 39 substations: Abbe, Ashtabula, Austinburg, Axtel, Baumhart, Beaver and 33 more. 9 projects, 2 with a printed cost estimate, 1 with a printed customer load (80 MW). | Substation Expansions: ATSI |
| 2026-07-17 | Item 03 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 2 substations: Hill, Jackson. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (approximately 22 MW). | Substation Expansions: Met-Ed |
| 2026-07-17 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 36 substations: Addison, Brody, Carrothers, Chickamauga, Clinton, Corey and 30 more. 9 projects, 5 with a printed cost estimate, 3 with a printed customer load (240 MW, 25 MW, 20 MW). | Substation Expansions: AEP |
| 2026-07-17 | Item 04 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 6 substations: Blain Substation, Dubois, Harvey Run, Reeds Gap Substation, Shade Gap Substation, Whetstone. 2 projects, 2 with a printed cost estimate. | Substation Expansions: Penelec |
| 2026-07-17 | Item 05 - ACE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 1 substation: Court. 1 project. | Substation Expansions: ACE |
| 2026-07-17 | Item 05 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 3 substations: Busse, Des Plaines, Golf Mill Substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: ComEd |
| 2026-07-17 | Item 06 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 5 substations: Chestnut Hill, Dorsey Run, Edgewood, Granite, Perryman. 4 projects, 4 with a printed cost estimate, 1 with a printed customer load (20 MW). | Substation Expansions: BGE |
| 2026-07-17 | Item 07 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 3 substations: Carrcroft, Oak Hall, Tasley. 2 projects. | Substation Expansions: DPL |
| 2026-07-17 | Item 08 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 2 substations: Arrowhead, Varden. 2 projects. | Substation Expansions: PPL |
| 2026-07-17 | Item 09 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 1 substation: Cherry Hill Station. 1 project. | Substation Expansions: PSEG |
| 2026-07-07 | Informational Only - 5034 500 kV Line Cut-in Immediate Need Assessment - Need Statement Immediate need assessment · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 4 substations: Bramah, Conastone, Delta York, Peach Bottom. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-07-07 | Item 03 - 5034 Immediate Need Assessment - Second Read Immediate need assessment · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 5 substations: Bramah, Conastone, Delta York, North Delta, Peach Bottom. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-07-07 | Item 04 - UGI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
Names 2 substations: Mountain, Newport Substation. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (500MW). | Substation Expansions: UGI |
| 2026-07-07 | Item 05 - ATSI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 2 substations: Chamberlin, Harding. 1 project. | Substation Expansions: ATSI |
| 2026-07-07 | Item 06 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 10 substations: Ballenger Substation, Dale Summit, Doubs, Lewistown Substation, Lime Kiln, Rhodes Lane Substation and 4 more. 4 projects, 2 with a printed cost estimate, 3 with a printed customer load (approximately 1000 MW, approximately 368 MW, approximately 82.7 MW). | Substation Expansions: APS |
| 2026-07-07 | Item 07 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 14 substations: Cookstown, Jackson, Lakehurst, Lakewood, Larrabee, Manchester and 8 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: JCPL |
| 2026-07-07 | Item 08 - MetEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 3 substations: Foxhill Substation, Monroe Substation, Shawnee Substation. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (50 MW). | Substation Expansions: Met-Ed |
| 2026-07-07 | Item 09 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 4 substations: Dale Summit, Lewistown, Shawville, Shingletown. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (82.7 MW). | Substation Expansions: Penelec |
| 2026-07-07 | Item 10 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 2 substations: Baker, Hanging Rock. 1 project, 1 with a printed customer load (1000 MW). | Substation Expansions: AEP |
| 2026-07-07 | item 11 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 6 substations: Atlanta, Clay, Clinton, Fayette, Greene, Stuart. 2 projects, 2 with a printed cost estimate, 2 with a printed customer load (1.5 GW, 1300 MW). | Substation Expansions: Dayton |
| 2026-07-07 | Item 12 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 14 substations: Blue Island, Bryon, Burnham, Charter Grove, Grayslake, Hanover Tap Blue and 8 more. 6 projects, 2 with a printed cost estimate, 3 with a printed customer load (612 MW, 860 MW, 1,550 MW). | Substation Expansions: ComEd |
| 2026-07-07 | Item 13 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
No substation names extracted. 1 project, 1 with a printed customer load (300 MW). | Substation Expansions: DEOK |
| 2026-07-07 | Item 14 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 18 substations: Allied, Bermuda Hundred, Bremo, Cannon Branch, Carson, Chickahominy and 12 more. 7 projects, 4 with a printed cost estimate, 2 with a printed customer load (100 MW, 69 MW). | Substation Expansions: DOM |
| 2026-07-07 | Item 15 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G PJM · PJM system-wide |
Names 3 substations: Burnham, Munster, Waldwick. 3 projects, 3 with a printed cost estimate. | Substation Expansions: PSEG, PJM |
| 2026-06-30 | PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted Tariff · retrieved 2026-10-20 |
PJM PPL Electric Utilities Corporation · PA |
Cited in the PPL Electric Utilities Corporation record (Rate Schedule LP-6 – Large Load Interconnections (Electric Pa. P.U.C. No. 202, Supplement No. 2); Pennsylvania Public Utility Commission, docket R-2025-3057164): source of 14 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2026-06-17 | Item 01 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 5 substations: Moore St, Moore Street, Newton Falls, Niles Central, Rock Springs. 6 projects, 5 with a printed customer load (14 MW, 150 MW, 170 MW, 60 MW, …). | Substation Expansions: AMPT |
| 2026-06-17 | Item 02 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 16 substations: Brandt Tap-Allegheny, Brandt Tap-Brandt, Canton Central, Cloverdale, Ingomar, Ingomar-Brandt Tap and 10 more. 3 projects, 2 with a printed customer load (120 MVA, 90 MVA). | Substation Expansions: ATSI |
| 2026-06-17 | Item 03 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 26 substations: Bethel, Burma, Cecil, Clarion Substation, Cumberland, Double Toll Gate and 20 more. 13 projects, 2 with a printed cost estimate, 3 with a printed customer load (2 MW, 25 MW, 29 MW). | Substation Expansions: APS |
| 2026-06-17 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 13 substations: Anchor Hocking, Hillsboro, Kenova, Kenton, Maysville, Memorial Drive and 7 more. 6 projects, 2 with a printed cost estimate, 1 with a printed customer load (324 MW). | Substation Expansions: AEP |
| 2026-06-17 | Item 05 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Des Plaines. 2 projects, 1 with a printed cost estimate. | Substation Expansions: ComEd |
| 2026-06-16 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 3 substations: Moon Corner, Northern Neck, Rappahannock. 1 project. | Substation Expansions: DOM |
| 2026-06-16 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 3 substations: Moon Corner, Northern Neck, Rappahannock. 1 project. | Substation Expansions: DOM |
| 2026-06-16 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 32 substations: Allamuchy, Allenhurst Substation, Bud Lake SW PT, Cookstown, Flanders, Great Adventure and 26 more. 5 projects, 2 with a printed cost estimate. | Substation Expansions: JCPL |
| 2026-06-16 | Item 03 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 9 substations: Cleona, Fredericksburg Tap, Gitts Run, Hunterstown, Jackson, North Hanover and 3 more. 3 projects, 1 with a printed cost estimate, 3 with a printed customer load (16 MW, 25 MW, 59 MW). | Substation Expansions: Met-Ed |
| 2026-06-16 | Item 04 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 13 substations: East Pike, Erie South, French Road, Garman, Glory, Miller REC and 7 more. 5 projects, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2026-06-16 | Item 05 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 6 substations: Acahela, Flemington, Flemington Tap, Jackson, Lock Haven, Renovo. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (290MW). | Substation Expansions: PPL |
| 2026-06-16 | Item 06 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 1 substation: Lawrence. 1 project, 1 with a printed cost estimate. | Substation Expansions: PSEG |
| 2026-06-02 | Informational Only - 5034 500 kV Line Cut-in Immediate Need Assessment - Need Statement Immediate need assessment · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 4 substations: Bramah, Conastone, Delta York, Peach Bottom. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-06-02 | Item 04 - UGI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
No substation names extracted. 1 project, 1 with a printed customer load (500MW). | Substation Expansions: UGI |
| 2026-06-02 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
No substation names extracted. 1 project. | Substation Expansions: JCPL |
| 2026-06-02 | Item 06 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 7 substations: Batesville, Flatlick, Gwynneville, Hanna, Junction Tower, Sunnyside and 1 more. 2 projects, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2026-06-02 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
No substation names extracted. 1 project, 1 with a printed customer load (900 MW). | Substation Expansions: PPL |
| 2026-06-02 | Item 08 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Buckingham, Warrington, Whitpain. 3 projects, 3 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-06-02 | Item 09 - 5034 500 kV Line Cut-in Immediate Need Assessment - First Read Immediate need assessment · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Bramah, Delta York, Peach Bottom. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-06-02 | Item 10 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Burnham. 1 project. | Substation Expansions: ComEd |
| 2026-06-02 | Item 11 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 23 substations: Allman, Bristers, Chancellor, Chickahominy, Elmont, Four Rivers and 17 more. 5 projects, 4 with a printed cost estimate, 2 with a printed customer load (300 MW, 3000 MW). | Substation Expansions: DOM |
| 2026-06-01 | Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) Commission order · retrieved 2026-10-20 |
PJM Appalachian Power Company · VA |
Cited in the Appalachian Power Company record (Large Power Service Rate Schedule (Schedule L.P.S.) — revised Terms and Conditions for Large Load Customers; State Corporation Commission, docket PUR-2025-00057): source of 12 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2026-05-15 | Item 01 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 23 substations: Big Sandy, Botetourt, Busseyville, Conrail SW, East Lynn, Falcon and 17 more. 10 projects, 7 with a printed cost estimate, 5 with a printed customer load (312MW, 300 MW, 240MW, 255 MW, …). | Substation Expansions: AEP |
| 2026-05-15 | Item 02 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 10 substations: Alpine, Bremer, Brewster, Chase Brass, East Leipsic, Harmon and 4 more. 3 projects. | Substation Expansions: AMPT |
| 2026-05-15 | Item 03 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 16 substations: Belmont, Beverly Substation, Beverly Tap, Double Toll Gate, Durbin Substation, Durbin Tap and 10 more. 4 projects, 2 with a printed cost estimate, 2 with a printed customer load (3 MW, 13 MW). | Substation Expansions: APS |
| 2026-05-15 | Item 04 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 21 substations: Ashtabula, Austinburg, Brookside, Bulk Mail Facility, Dixie Substation, Fernway and 15 more. 5 projects, 2 with a printed cost estimate, 2 with a printed customer load (29 MW, 16 MW). | Substation Expansions: ATSI |
| 2026-05-15 | Item 05 - DLCO Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 1 substation: Brunot Island. 1 project, 1 with a printed cost estimate. | Substation Expansions: DLCO |
| 2026-05-15 | Item 06 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 5 substations: Finneytown, Mapleknoll, Mt. Healthy, Terminal, Willey. 1 project, 1 with a printed cost estimate. | Substation Expansions: DEOK |
| 2026-05-15 | Item 07 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Wempletown. 2 projects, 1 with a printed cost estimate. | Substation Expansions: ComEd |
| 2026-05-14 | Item 01 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 5 substations: Chestnut Hill, Dorsey Run, Edgewood, Granite, Perryman. 4 projects, 1 with a printed customer load (20 MW). | Substation Expansions: BGE |
| 2026-05-14 | Item 02 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 2 substations: Cheswold, Kent. 1 project, 1 with a printed cost estimate. | Substation Expansions: DPL |
| 2026-05-14 | Item 03 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 2 substations: Crescentville, Waneeta. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-05-14 | Item 04 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 8 substations: Balcony Falls, Beech Branch, Buena Vista substation, Cool Springs, Cradock Substation, Lexington and 2 more. 3 projects, 3 with a printed cost estimate, 2 with a printed customer load (9.2 MW, 18 MW). | Substation Expansions: DOM |
| 2026-05-14 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 22 substations: Beach Glen, Beaver Brook, Cookstown, Deep Run Substation, Englishtown, Hewlett Packard and 16 more. 7 projects, 2 with a printed cost estimate, 2 with a printed customer load (approximately 11 MW, approximately 25 MW). | Substation Expansions: JCPL |
| 2026-05-14 | Item 06 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 9 substations: Bair T, Frystown, Hamilton 115 kV Substation, Hill, Jackson, JE Baker and 3 more. 3 projects, 1 with a printed cost estimate, 1 with a printed customer load (22 MW). | Substation Expansions: Met-Ed |
| 2026-05-14 | Item 07 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 4 substations: Goudey, Laurel Lake, Tiffany, Warriner Pond. 1 project. | Substation Expansions: Penelec |
| 2026-05-14 | Item 08 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 14 substations: Dupont, Frackville, Hosensack, Jenkins, Lock Haven, Lycoming and 8 more. 10 projects, 7 with a printed cost estimate, 3 with a printed customer load (75MW, 15MW, 100 MW). | Substation Expansions: PPL |
| 2026-05-08 | Item 03 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 4 substations: Altoona, Bear Rock, Marshall, Moshannon. 2 projects. | Substation Expansions: Penelec |
| 2026-05-08 | Item 04 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
No substation names extracted. 1 project, 1 with a printed customer load (1200 MW). | Substation Expansions: AEP |
| 2026-05-08 | item 05 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 7 substations: Brown, Concord, Eldean, Miami, Patina, Shelby and 1 more. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (1400 MW). | Substation Expansions: Dayton |
| 2026-05-08 | Item 06 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 19 substations: Beach Haven, Callender Gap, Glen Brook, Harwood, Hosensack, Hummelstown and 13 more. 9 projects, 9 with a printed cost estimate, 5 with a printed customer load (1000 MW, 1,500 MW, 1,200 MW, 1,500 MW, …). | Substation Expansions: PPL |
| 2026-05-08 | Item 07 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Buckingham, Cromby, Warrington. 2 projects, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-05-08 | Item 08 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Nelson. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (600 MW). | Substation Expansions: ComEd |
| 2026-05-08 | Item 09 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 5 substations: Bremo, Farmville, Lebanon, Stockholm, Thicket. 4 projects, 2 with a printed cost estimate, 3 with a printed customer load (3000 MW, 46.6MW, 300 MW). | Substation Expansions: DOM |
| 2026-05-08 | Item 10 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities DOM · Dominion Energy Virginia JCPL · Jersey Central Power & Light (FirstEnergy) PJM · PJM system-wide PSEG · PSE&G PECO · PECO Energy |
Names 61 substations: Anderson Branch, Aquia Harbor, Atlantic, Bramah, Bristers, Cardiff and 55 more. 13 projects, 3 with a printed cost estimate. | Substation Expansions: PPL, DOM, JCPL, PJM, PSEG, PECO |
| 2026-04-15 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 2 substations: Ironman, Lick. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2026-04-15 | Item 02 - APS Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 16 substations: Cabot, Fawn, French Creek, Hampshire Substation, Heaters Tap, Kiski Valley and 10 more. 6 projects, 1 with a printed cost estimate, 3 with a printed customer load (18 MW, 11 MW, 15.5 MW). | Substation Expansions: APS |
| 2026-04-15 | Item 03 - ATSI Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 28 substations: Aurora, Bowling Green No. 4, Bryan, Cantex, Chamberlin, Chrysler Substation and 22 more. 9 projects, 5 with a printed cost estimate, 4 with a printed customer load (120 MWs, 54 MW, 72 MW, 135 MW). | Substation Expansions: ATSI |
| 2026-04-15 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 26 substations: Canton Central, Coleman, Cyprus, Fiesta, Heath, Kossuth and 20 more. 13 projects, 3 with a printed cost estimate, 11 with a printed customer load (300 MW, 43.2MWs, 244 MW, 50 MW, …). | Substation Expansions: AEP |
| 2026-04-15 | Item 05 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 4 substations: Pierpont Tap, Rockwell, Sabrooke, Wempletown. 3 projects, 2 with a printed cost estimate. | Substation Expansions: ComEd |
| 2026-04-15 | Item 06 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 6 substations: Allen, Finneytown, Liberty, Mapleknoll, Maud, Mt. Healthy. 2 projects. | Substation Expansions: DEOK |
| 2026-04-14 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 8 substations: Chancellor, Chase City, Davis, H&RP, H&RP and Davis Substations, Lancaster and 2 more. 3 projects, 1 with a printed customer load (30 MW). | Substation Expansions: DOM |
| 2026-04-14 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 4 substations: Cozy Lake, Franklin, Montville, Whippany. 2 projects. | Substation Expansions: JCPL |
| 2026-04-14 | Item 03 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 6 substations: Bingen, Elk Mountain, Greenfield, South Allentown, Sullivan Trail, Tinker. 8 projects, 5 with a printed cost estimate, 2 with a printed customer load (100 MW, 60MW). | Substation Expansions: PPL |
| 2026-04-14 | Item 04 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 2 substations: Crescentville, Waneeta. 2 projects, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-04-07 | Item 03 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 3 substations: Carroll, Mount Airy, Mt. Airy. 1 project, 1 with a printed cost estimate. | Substation Expansions: APS |
| 2026-04-07 | Item 04 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 4 substations: Curleys, Don Marquis, Marquis station, Monza. 7 projects, 1 with a printed cost estimate, 7 with a printed customer load (310 MW, 415 MW, 787 MW, 429 MW, …). | Substation Expansions: AEP |
| 2026-04-07 | Item 05 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 4 substations: Hosensack, Hummelstown, Jenkins, Steel City. 7 projects, 3 with a printed customer load (2,000 MW, 300 MW, 300 MW). | Substation Expansions: PPL |
| 2026-04-07 | Item 06 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 2 substations: LaSalle, Nelson. 2 projects. | Substation Expansions: ComEd |
| 2026-04-07 | Item 07 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 3 substations: Burches Hill, Palmer Corner, Palmers Corner. 1 project, 1 with a printed cost estimate. | Substation Expansions: Pepco |
| 2026-04-07 | Item 08 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 15 substations: Bellwether, Chichester, Claymont, Cromby, Edgemoor, Elmwood and 9 more. 6 projects, 1 with a printed cost estimate, 1 with a printed customer load (500 MW). | Substation Expansions: PECO |
| 2026-04-07 | Item 09 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 24 substations: Auto World, Beco, Clarendon, Clifton, Crystal, Darbytown and 18 more. 7 projects, 2 with a printed cost estimate, 5 with a printed customer load (296MW, 90 MW, 120 MW, 282.6 MW, …). | Substation Expansions: DOM |
| 2026-04-07 | Item 11 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities DOM · Dominion Energy Virginia |
Names 25 substations: Bristers, Brunner Island, Chesterfield, Chickahominy, Cunningham, Elk Run and 19 more. 5 projects, 3 with a printed cost estimate. | Substation Expansions: PPL, DOM |
| 2026-03-19 | Item 01 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 9 substations: Bethel Park Substation, Bredinville, Buffalo Junction, Cecil, Kilgo, McCalmont and 3 more. 3 projects, 1 with a printed cost estimate, 2 with a printed customer load (approximately 29 MW, 80 MW). | Substation Expansions: APS |
| 2026-03-19 | Item 02 - ATSI Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 22 substations: Alliance Castings, Barberton, Belle Vista, Bluebell Substation, Boardman, Canton Central and 16 more. 6 projects, 3 with a printed cost estimate, 1 with a printed customer load (310 MW). | Substation Expansions: ATSI |
| 2026-03-19 | Item 03 - DLCO Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 1 substation: Brunot Island. 1 project. | Substation Expansions: DLCO |
| 2026-03-19 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 8 substations: Cyprus, Darden Road, Herlan, Malizsewski, Natrium, Somerton and 2 more. 5 projects, 1 with a printed cost estimate, 2 with a printed customer load (25 MW, 675 MW). | Substation Expansions: AEP |
| 2026-03-19 | Item 06 - Dayton Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 3 substations: Airport Substation, Union, West Milton. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (300 MW). | Substation Expansions: Dayton |
| 2026-03-19 | Item 07 - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 3 substations: College Corner, Hutchings, Trenton. 1 project, 1 with a printed cost estimate. | Substation Expansions: Dayton |
| 2026-03-18 | Item 02 - ACE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 3 substations: Glassboro, Monroe, Rowan. 1 project. | Substation Expansions: ACE |
| 2026-03-18 | Item 03 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Crescentville, Master, Waneeta. 2 projects, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-03-18 | Item 04 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 2 substations: Cheswold, Kent. 1 project. | Substation Expansions: DPL |
| 2026-03-18 | Item 05 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 10 substations: Balcony Falls, Buena Vista substation, Central Substation Tap, Craigsville Substation, Dominion substation, Glasgow substation and 4 more. 7 projects, 4 with a printed cost estimate, 4 with a printed customer load (12.0 MW, 19.0 MW, 25MW, 16.1 MW). | Substation Expansions: DOM |
| 2026-03-18 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 15 substations: Branchville, Clark Street, Cookstown, EH Werner, Feltus St, Freneau and 9 more. 5 projects, 1 with a printed cost estimate, 1 with a printed customer load (30 MW). | Substation Expansions: JCPL |
| 2026-03-18 | Item 07 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 7 substations: Carpenter Technology Substation, Lucent, Muhlenberg Substation, North Temple, South Reading Substation, West Reading and 1 more. 3 projects, 2 with a printed cost estimate, 2 with a printed customer load (23 MW, 33 MW). | Substation Expansions: Met-Ed |
| 2026-03-18 | Item 08 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 10 substations: Corry East, Four Mile Junction, Lewistown, Logan, Molly Substation, Mount Union and 4 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (12 MW). | Substation Expansions: Penelec |
| 2026-03-18 | Item 09 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 17 substations: Berks, Bingen, Cumberland, Dupont, Eldred, Elk Mountain and 11 more. 13 projects, 2 with a printed cost estimate, 2 with a printed customer load (15 MW, 60MW). | Substation Expansions: PPL |
| 2026-03-18 | Item 10 - UGI Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
Names 2 substations: 8th Street Substation, Swoyersville. 1 project, 1 with a printed cost estimate. | Substation Expansions: UGI |
| 2026-03-10 | Item 04 - UGI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
Names 2 substations: Mountain, Newport Substation. 2 projects, 2 with a printed cost estimate, 2 with a printed customer load (384 MW, 200MW). | Substation Expansions: UGI |
| 2026-03-10 | Item 05 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
No substation names extracted. 4 projects, 4 with a printed customer load (1,500 MW, 1,200 MW, 1,500 MW, 1,350 MW). | Substation Expansions: PPL |
| 2026-03-10 | Item 06 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 4 substations: Buxmont, Limerick, Plymouth Meeting, Whitpain. 4 projects, 3 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-03-10 | Item 07 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 2 substations: Burches Hill, Palmers Corner. 1 project. | Substation Expansions: Pepco |
| 2026-03-10 | Item 08 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 8 substations: Beverly Road, Grayslake, Hanover Tap, Kendall County E. C., Libertyville, Silver Lake and 2 more. 3 projects, 2 with a printed cost estimate, 3 with a printed customer load (504 MW, 588 MW, 1,550 MW). | Substation Expansions: ComEd |
| 2026-03-10 | Item 09 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 11 substations: Desper, Four Rivers, Foxbrook Lane substation, Gordonsville, Guss, Hanover and 5 more. 3 projects, 2 with a printed cost estimate, 3 with a printed customer load (259.6 MW, 300MW, 300 MW). | Substation Expansions: DOM |
| 2026-03-10 | Item 11 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PJM · PJM system-wide |
Names 3 substations: Bramah/North Delta, Peach Bottom, Rock Springs. 2 projects, 2 with a printed cost estimate. | Substation Expansions: PJM |
| 2026-02-25 | Order Approving Tariffs, Case No. EO-2025-0154, Tracking Nos. JE-2026-0103, -0104, -0105 Commission order · retrieved 2026-10-20 |
SPP Evergy Missouri West, Inc. d/b/a Evergy Missouri West · MO |
Cited in the Evergy Missouri West, Inc. d/b/a Evergy Missouri West record (Schedule LLPS, Large Load Power Service (EMW P.S.C. MO. No. 1, Sheets 187-193; EMM P.S.C. MO. No. 7, Sheets…; Missouri Public Service Commission, docket EO-2025-0154): source of 3 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2026-02-18 | Staff Recommendation to Approve Tariffs, Case No. EO-2025-0154 Testimony or other commission document · retrieved 2026-10-20 |
SPP Evergy Missouri West, Inc. d/b/a Evergy Missouri West · MO |
Cited in the Evergy Missouri West, Inc. d/b/a Evergy Missouri West record (Schedule LLPS, Large Load Power Service (EMW P.S.C. MO. No. 1, Sheets 187-193; EMM P.S.C. MO. No. 7, Sheets…; Missouri Public Service Commission, docket EO-2025-0154): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2026-02-13 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 2 substations: Avon, Johnson. 2 projects, 2 with a printed cost estimate. | Substation Expansions: ATSI |
| 2026-02-13 | Item 02 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 21 substations: Beatty, Bixby, Clinton, Conant, Cyprus, Dunlap and 15 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (675 MW). | Substation Expansions: AEP |
| 2026-02-13 | Item 03 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 3 substations: Poe Road, Sand Ridge, Tontogany. 1 project, 1 with a printed cost estimate. | Substation Expansions: AMPT |
| 2026-02-13 | Item 04 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 19 substations: Abbe, Avery, Boardman, Carriage, Chrysler Substation, Columbiana and 13 more. 7 projects, 3 with a printed customer load (28 MW, 10 MW, 62 MW). | Substation Expansions: ATSI |
| 2026-02-13 | Item 05 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 3 substations: Belvidere, Chrysler, Marengo. 3 projects, 1 with a printed cost estimate, 1 with a printed customer load (300 MW). | Substation Expansions: ComEd |
| 2026-02-13 | Item 06 - Dayton Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 14 substations: Camden, Creekside, Crystal, East Casstown, Eldean, Germantown and 8 more. 5 projects, 3 with a printed cost estimate, 1 with a printed customer load (33MW). | Substation Expansions: Dayton |
| 2026-02-13 | Item 07 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 4 substations: City of Hamilton Substation, Fairfield Substation, Port Union, Seward Substation. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (240 MW). | Substation Expansions: DEOK |
| 2026-02-12 | Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) DPL · Delmarva Power ACE · Atlantic City Electric |
Names 8 substations: Corson, Court, England, Middle, New Church, Piney and 2 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: Penelec, DPL, ACE |
| 2026-02-12 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 9 substations: Bradevelt, East Flemington, Flemington, Glen Gardner, Jerseyville, Neshanic and 3 more. 2 projects. | Substation Expansions: JCPL |
| 2026-02-12 | Item 03 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 3 substations: Lincoln Substation, Orrtanna Substation, West Gettysburg. 1 project, 1 with a printed cost estimate. | Substation Expansions: Met-Ed |
| 2026-02-12 | Item 04 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 9 substations: Bethlehem, Bethlehem Mine 33, Cambria County Prison, Ebensburg, Nanty Glo, REA Energy Reese and 3 more. 2 projects, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2026-02-12 | Item 05 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 27 substations: Bear Creek, Berks, Clinton, Columbia, Cumberland, Fairfield and 21 more. 13 projects, 8 with a printed cost estimate, 2 with a printed customer load (150MW, 290MW). | Substation Expansions: PPL |
| 2026-02-12 | Item 06 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 2 substations: Lawnside, Nicholson. 1 project, 1 with a printed cost estimate. | Substation Expansions: PSEG |
| 2026-02-12 | Item 07 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 4 substations: Boykins Substation, Plywood, Sedge hill, Trego Substation. 3 projects, 1 with a printed cost estimate, 1 with a printed customer load (8.9MW). | Substation Expansions: DOM |
| 2026-02-12 | Item 08 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 3 substations: Carrcroft, Edgemoor, Silverside. 1 project, 1 with a printed cost estimate. | Substation Expansions: DPL |
| 2026-02-12 | Item 09 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 1 substation: Master. 1 project. | Substation Expansions: PECO |
| 2026-02-12 | Item 10 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 3 substations: Greene St, Port Covington, Westport. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (392MW). | Substation Expansions: BGE |
| 2026-02-03 | Item 04 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 5 substations: Doubs, Lime Kiln, Manor Woods, Quantum 300 Substation, Sage. 1 project, 1 with a printed cost estimate. | Substation Expansions: APS |
| 2026-02-03 | Item 05 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
No substation names extracted. 1 project, 1 with a printed customer load (800 MW). | Substation Expansions: AEP |
| 2026-02-03 | Item 06 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 11 substations: Airport Substation, Darby Substation, Eldean, Flatlick (AEP) Substation, Marysville (AEP), Patina and 5 more. 4 projects, 2 with a printed cost estimate, 4 with a printed customer load (1400 MW, 1300 MW, 800 MW, 300 MW). | Substation Expansions: Dayton |
| 2026-02-03 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 11 substations: Archbald Mountain, Callender Gap, Fox Hill, Hopatcong, Lackawanna, Martins Creek and 5 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (1,000 MW). | Substation Expansions: PPL |
| 2026-02-03 | Item 08 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 1 substation: Lock. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2026-02-03 | Item 09 - BGE Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 4 substations: Calvert Cliffs, Camp Canoy, Chalk Point, Waugh Chapel. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (880 MW). | Substation Expansions: BGE |
| 2026-02-03 | Item 10 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 17 substations: Braidwood, Byron, Charter Grove, Cherry Valley, Coal City, Collins and 11 more. 8 projects, 6 with a printed cost estimate, 8 with a printed customer load (750 MW, 450 MW, 504 MW, 860 MW, …). | Substation Expansions: ComEd |
| 2026-02-03 | Item 11 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
No substation names extracted. 2 projects, 2 with a printed customer load (300 MW, 120MW). | Substation Expansions: PSEG |
| 2026-02-03 | Item 12 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 11 substations: Chesterfield, Cosner, Emy, James Hill, Lee’s Hill, Mudd Tavern and 5 more. 4 projects, 4 with a printed cost estimate, 4 with a printed customer load (300 MW, in excess of 100 MW, 212 MW, 300 MW). | Substation Expansions: DOM |
| 2026-02-03 | Item 13 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PJM · PJM system-wide |
Names 5 substations: Bristers, Elk Run, Meadowbrook, Vint Hill, Yeat. 1 project. | Substation Expansions: PJM |
| 2026-01-28 | IURC Order, Cause No. 46301 (approved Jan 28 2026), I&M generation resource plan settlement Commission order · retrieved 2026-10-20 |
PJM Indiana Michigan Power Company · IN |
Cited in the Indiana Michigan Power Company record (Tariff I.P. (Industrial Power), Terms and Conditions for Customer at or Over 70 MW Individually or 150 MW in…; Indiana Utility Regulatory Commission, docket Cause No. 46097): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2026-01-16 | Item 01 - AEP supplemental projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 8 substations: Adams, Berne, Buchanan South, Busch, Cyprus, Hannibal and 2 more. 7 projects, 4 with a printed cost estimate, 3 with a printed customer load (240MW, 675 MW, 570 MW). | Substation Expansions: AEP |
| 2026-01-16 | Item 02 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 4 substations: Edgerton, McDonald Steel, Niles, Niles Central. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (63 MW). | Substation Expansions: AMPT |
| 2026-01-16 | Item 03 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 15 substations: Allenport, Bredinville, Charleroi, Glenville, Goff Run Substation, Grantsville and 9 more. 6 projects, 2 with a printed cost estimate, 2 with a printed customer load (10 MW, 80 MW). | Substation Expansions: APS |
| 2026-01-16 | Item 04 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 54 substations: Abbe, Bayshore, Benjamin T Branch, Blair Strip Steel, Bowling Green No. 4, Brush Wellman and 48 more. 12 projects, 1 with a printed cost estimate, 4 with a printed customer load (9 MW, 56 MW, 43 MW, 25 MW). | Substation Expansions: ATSI |
| 2026-01-16 | Item 05 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 4 substations: Belvidere, Marengo, State Line, Wolf Lake. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (260 MW). | Substation Expansions: ComEd |
| 2026-01-16 | Item 06 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 2 substations: Catawba, Huntington Court. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2026-01-15 | Item 01 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
No substation names extracted. 1 project, 1 with a printed customer load (150 MW). | Substation Expansions: BGE |
| 2026-01-15 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 3 substations: Briant Park, Morris Court Substation, Traynor. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (approximately 10 MW). | Substation Expansions: JCPL |
| 2026-01-15 | Item 03 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 3 substations: Fairfield, Watson, West Berwick. 3 projects. | Substation Expansions: PPL |
| 2026-01-15 | Item 04 - UGI Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
Names 2 substations: Hunlock Creek Substation, Swoyersville. 2 projects, 1 with a printed customer load (200MW). | Substation Expansions: UGI |
| 2026-01-15 | Item 05 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 8 substations: Alexander Corner, Brown Boveri, Deep Creek, Moon Corner, Northern Neck, Quantico and 2 more. 2 projects, 1 with a printed cost estimate. | Substation Expansions: DOM |
| 2026-01-15 | Item 06 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 2 substations: Cardiff, Lewis. 1 project. | Substation Expansions: ACE |
| 2026-01-15 | KCC Utilities Division Update, Senate Utilities Committee, January 15, 2026 Testimony or other commission document · retrieved 2026-10-20 |
SPP Evergy Kansas Central, Inc. · KS |
Cited in the Evergy Kansas Central, Inc. record (Schedule LLPS, Large Load Power Service (Evergy Kansas Central, Inc. & Evergy Kansas South, Inc., d.b.a.…; Kansas Corporation Commission, docket 25-EKME-315-TAR): source of 2 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2026-01-06 | Item 02 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 1 substation: Yukon. 1 project, 1 with a printed cost estimate. | Substation Expansions: APS |
| 2026-01-06 | Item 03 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 4 substations: Cookstown, Larrabee, Manchester, Whitings. 1 project, 1 with a printed customer load (23 MW). | Substation Expansions: JCPL |
| 2026-01-06 | Item 04 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 1 substation: Keystone. 1 project. | Substation Expansions: Penelec |
| 2026-01-06 | Item 05 - ACE Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
No substation names extracted. 1 project, 1 with a printed customer load (49 MW). | Substation Expansions: ACE |
| 2026-01-06 | Item 06 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Buxmont, Newlinville, Whitpain. 2 projects. | Substation Expansions: PECO |
| 2026-01-06 | Item 07 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 34 substations: Barrister Substation, Bermuda Hundred, Chickahominy, Correctional, Elm Farm Substation, Enon substation and 28 more. 13 projects, 7 with a printed cost estimate, 9 with a printed customer load (100 MW, 69 MW, 290 MW, 30.3 MW, …). | Substation Expansions: DOM |
| 2026-01-06 | Item 09 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky JCPL · Jersey Central Power & Light (FirstEnergy) PPL · PPL Electric Utilities PJM · PJM system-wide Pepco · Pepco DOM · Dominion Energy Virginia AEP · American Electric Power APS · Allegheny Power (FirstEnergy) |
Names 73 substations: 502 Junction, Adkins, Allen, Aspen, Beatty, Bells Mill and 67 more. 10 projects, 10 with a printed cost estimate. | Substation Expansions: DEOK, JCPL, PPL, PJM, Pepco, DOM, AEP, APS |
| 2025-12-12 | Item 12 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
No substation names extracted. 1 project, 1 with a printed customer load (240 MW). | Substation Expansions: DEOK |
| 2025-12-12 | Item 13 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 35 substations: Black River, Bridge, Chrysler Substation, Clark, Collins Park West, Department of Corrections and 29 more. 9 projects, 6 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-12-12 | Item 14 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 10 substations: Catlett Mountain, Grand Point, Greene Substation, Junction Substation, Kelso Gap, Letterkenny Substation and 4 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: APS |
| 2025-12-12 | Item 15 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 4 substations: Commerce, Jennings Road Switch, Sharp Rd, Sharp Road. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (12.031 MW). | Substation Expansions: AEP |
| 2025-12-12 | Item 16 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison AEP · American Electric Power |
Names 10 substations: Altavista, Haumesser, Mendota, Mound Street, Otter, Saint Clair and 4 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: ComEd, AEP |
| 2025-12-11 | Item 02 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 5 substations: Central Substation, Craigsville Substation, Glasgow substation, Harmony Village Substation, Jarratt Substation. 6 projects, 2 with a printed cost estimate, 2 with a printed customer load (25 MW, 20.1 MW). | Substation Expansions: DOM |
| 2025-12-11 | Item 03 - SRRTEP South - Reliability Analysis Update Reliability analysis update · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 2 substations: Bremo, Fork Union. 1 project, 1 with a printed cost estimate. | Substation Expansions: DOM |
| 2025-12-11 | Item 08 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 14 substations: Air Reduction, Allenhurst Substation, CSC H Tap, Manitou, Martinsville, Montville and 8 more. 6 projects, 1 with a printed cost estimate, 2 with a printed customer load (10 MW, 10 MW). | Substation Expansions: JCPL |
| 2025-12-11 | Item 09 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 13 substations: Annville, Campbelltown Substation, Carpenter Technology Substation, Cleona, Fairview, Gitts Run and 7 more. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (41 MW). | Substation Expansions: Met-Ed |
| 2025-12-11 | Item 10 - PENELEC Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 15 substations: Bethlehem, Bobik Lane, Ebensburg, Glory, Grand Point, Greene and 9 more. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (11 MW). | Substation Expansions: Penelec |
| 2025-12-11 | Item 11 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 13 substations: Bear Creek, Center Valley, Coopersburg, Derry, Fountain Springs, Hughesville and 7 more. 11 projects, 4 with a printed cost estimate. | Substation Expansions: PPL |
| 2025-12-11 | Item 12 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 7 substations: Brunswick, Gloucester, Harts Lane, Lawnside, Lawrence, Nicholson and 1 more. 5 projects, 2 with a printed cost estimate. | Substation Expansions: PSEG |
| 2025-12-11 | Item 13 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 3 substations: Carrcroft, Edgemoor, Silverside. 1 project. | Substation Expansions: DPL |
| 2025-12-11 | Item 14 - ACE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 2 substations: Beckett, Churchtown. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (40 MW). | Substation Expansions: ACE |
| 2025-12-11 | Item 15 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PJM · PJM system-wide |
Names 3 substations: Cheriton S/S, Kellam, Kellam S/S. 1 project, 1 with a printed cost estimate. | Substation Expansions: PJM |
| 2025-12-08 | Item 04 - ATSI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 7 substations: Allen Junction Substation, Greenfield, Lakeview, Lallendorf Substation, Lemoyne, Morocco and 1 more. 2 projects, 2 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-12-08 | Item 05 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 2 substations: Elko Substation, Yukon. 2 projects, 1 with a printed cost estimate. | Substation Expansions: APS |
| 2025-12-08 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 2 substations: Englishtown, Glen Gardner. 3 projects, 3 with a printed cost estimate. | Substation Expansions: JCPL |
| 2025-12-08 | Item 07 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 1 substation: Burches Hill. 1 project, 1 with a printed cost estimate. | Substation Expansions: Pepco |
| 2025-12-08 | Item 08 - BGE Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
No substation names extracted. 1 project, 1 with a printed customer load (880 MW). | Substation Expansions: BGE |
| 2025-12-08 | Item 09 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 6 substations: Des Plaines, Itasca, Pleasant Prairie, State Line, Waukegan, Zion. 3 projects, 3 with a printed cost estimate. | Substation Expansions: ComEd |
| 2025-12-08 | Item 10 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 4 substations: Cosner, Hibie St, Reeves Ave, Thrasher. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (300 MW, 29.8 MW). | Substation Expansions: DOM |
| 2025-12-08 | Item 11 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power DOM · Dominion Energy Virginia PPL · PPL Electric Utilities PJM · PJM system-wide Pepco · Pepco |
Names 90 substations: Adkins, Allen, Auglaize, Basin, Beatty, Bells Mill and 84 more. 13 projects, 11 with a printed cost estimate. | Substation Expansions: AEP, DOM, PPL, PJM, Pepco |
| 2025-11-25 | Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) Commission order · retrieved 2026-10-20 |
PJM Virginia Electric and Power Company (Dominion Energy Virginia) · VA |
Cited in the Virginia Electric and Power Company (Dominion Energy Virginia) record (Rate Schedule GS-5; State Corporation Commission, docket PUR-2025-00058): source of 19 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2025-11-14 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison AEP · American Electric Power APS · Allegheny Power (FirstEnergy) ATSI · American Transmission Systems (FirstEnergy) DEOK · Duke Energy Ohio and Kentucky |
Names 84 substations: Abbe, Avon, Baileysville, Bedington, Bellevue, Belmont and 78 more. 48 projects, 48 with a printed cost estimate. | Substation Expansions: ComEd, AEP, APS, ATSI, DEOK |
| 2025-11-14 | Item 02 - ATSI Supplemental Projects - Version 2 Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 6 substations: Ashtabula East Substation, Cloverdale, Harmon, London, Tangy, Yager Substation. 7 projects, 4 with a printed cost estimate, 1 with a printed customer load (16 MW). | Substation Expansions: ATSI |
| 2025-11-14 | Item 03 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 17 substations: Abert, Big Sandy, Busseyville, Capital Avenue, Cleveland, East Elkhart and 11 more. 8 projects, 5 with a printed cost estimate, 2 with a printed customer load (140 MW, 13.5MW). | Substation Expansions: AEP |
| 2025-11-14 | Item 04 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 4 substations: Channahon, Cherry Valley, Mazon, Morris CoGen tap. 4 projects, 3 with a printed cost estimate, 1 with a printed customer load (260 MW). | Substation Expansions: ComEd |
| 2025-11-14 | Item 05 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 3 substations: Donaldson, Turfway, Woodspoint. 1 project, 1 with a printed cost estimate. | Substation Expansions: DEOK |
| 2025-11-14 | Item 06 - Dayton Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 2 substations: East Casstown, St. Paris. 1 project. | Substation Expansions: Dayton |
| 2025-11-14 | Item 07 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 21 substations: AEP Thelma, Bavarian, Boone County, Clay Village, Dewey Dam, Dewey Station and 15 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: EKPC |
| 2025-11-13 | Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power PJM · PJM system-wide PSEG · PSE&G BGE · Baltimore Gas and Electric Met-Ed · Met-Ed (FirstEnergy) Penelec · Penelec (FirstEnergy) JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 57 substations: Bath Ave, Belle Haven, Belleville, Blair Road, Cedar Grove, Center Union and 51 more. 18 projects, 17 with a printed cost estimate. | Substation Expansions: DPL, PJM, PSEG, BGE, Met-Ed, Penelec, JCPL |
| 2025-11-13 | Item 02 - SRRTEP South - Reliability Analysis Update Reliability analysis update · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 2 substations: Bremo, Fork Union. 1 project, 1 with a printed cost estimate. | Substation Expansions: DOM |
| 2025-11-13 | Item 03 - BGE Supplemental Projects - Version 3 Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 6 substations: Crystal Springs, Crystal Springs Tap, Dorsey Run, Dorsey Run Tap, High Ridge, Windy Edge. 7 projects, 5 with a printed cost estimate. | Substation Expansions: BGE |
| 2025-11-13 | Item 04 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 2 substations: Martinsville, Readington. 1 project, 1 with a printed customer load (10 MW). | Substation Expansions: JCPL |
| 2025-11-13 | Item 05 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 10 substations: Cooper Substation, East Towanda, Hector, Mansfield, Niles Valley, North Meshoppen and 4 more. 3 projects, 2 with a printed cost estimate, 2 with a printed customer load (approximately 50 MVA, approximately 30 MW). | Substation Expansions: Penelec |
| 2025-11-13 | Item 06 - PSEG Supplemental Projects - Version 2 Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 3 substations: Gloucester, Lawnside, Sand Hills. 2 projects. | Substation Expansions: PSEG |
| 2025-11-13 | Item 07 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 7 substations: Bains Store, Bayside, Burton, Harmony Village Substation, Jarratt Substation, Long Creek and 1 more. 3 projects, 1 with a printed cost estimate, 2 with a printed customer load (33 MW, 159 MW). | Substation Expansions: DOM |
| 2025-11-13 | Report and Order, Case No. EO-2025-0154 (certified copy filed as Commission Exhibit 603 in Case No. ET-2025-0184) Commission order · retrieved 2026-10-20 |
SPP Evergy Missouri West, Inc. d/b/a Evergy Missouri West · MO |
Cited in the Evergy Missouri West, Inc. d/b/a Evergy Missouri West record (Schedule LLPS, Large Load Power Service (EMW P.S.C. MO. No. 1, Sheets 187-193; EMM P.S.C. MO. No. 7, Sheets…; Missouri Public Service Commission, docket EO-2025-0154): source of 3 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2025-11-06 | KCC News Release, November 6, 2025: KCC approves large load rate plan with consumer protections Testimony or other commission document · retrieved 2026-10-20 |
SPP Evergy Kansas Central, Inc. · KS |
Cited in the Evergy Kansas Central, Inc. record (Schedule LLPS, Large Load Power Service (Evergy Kansas Central, Inc. & Evergy Kansas South, Inc., d.b.a.…; Kansas Corporation Commission, docket 25-EKME-315-TAR): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2025-11-04 | Item 04 - APS Supplemental Projects - Version 7 Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 11 substations: Carroll, Doubs, Eaglehead Substation, Lime Kiln, Monocacy Substation, Mt. Airy and 5 more. 5 projects, 4 with a printed cost estimate. | Substation Expansions: APS |
| 2025-11-04 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 6 substations: Andover, Blairstown, East Newton, Englishtown, Kittatinny, Newton. 2 projects, 1 with a printed customer load (35 MW). | Substation Expansions: JCPL |
| 2025-11-04 | Item 06 - PENELEC Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 3 substations: Johnstown, Raystown, Seward. 2 projects, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-11-04 | Item 07 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 4 substations: Hanna, Junction Tower, Sunnyside, Tanners Creek. 2 projects, 1 with a printed customer load (500MW). | Substation Expansions: AEP |
| 2025-11-04 | Item 08 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 6 substations: Alburtis, Allentown, Orefield, Siegfried, Susquehanna, Wescosville. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (1000 MW). | Substation Expansions: PPL |
| 2025-11-04 | Item 09 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 6 substations: Emilie, Ford Mill, Lock, North Philadelphia, Plymouth Meeting, Whitpain. 7 projects, 1 with a printed cost estimate, 3 with a printed customer load (750 MW, 500 MW, 600 MW). | Substation Expansions: PECO |
| 2025-11-04 | Item 10 - BGE Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 3 substations: High Ridge – Crystal Springs, Naval Academy Jct., Riverside. 3 projects, 3 with a printed cost estimate, 1 with a printed customer load (~400MW). | Substation Expansions: BGE |
| 2025-11-04 | Item 11 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 17 substations: Babcock, Collins, Des Plaines, Electric Junction, Green Acres, Katydid and 11 more. 5 projects, 2 with a printed cost estimate. | Substation Expansions: ComEd |
| 2025-11-04 | Item 12 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
No substation names extracted. 1 project, 1 with a printed customer load (300 MW). | Substation Expansions: PSEG |
| 2025-11-04 | Item 13 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 8 substations: Amethyst, Emy, Garnet, Hanover, Hibie St, Powell Creek and 2 more. 7 projects, 5 with a printed customer load (300 MW, 300 MW, 300 MW, 212 MW, …). | Substation Expansions: DOM |
| 2025-11-04 | Item 14 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison APS · Allegheny Power (FirstEnergy) DEOK · Duke Energy Ohio and Kentucky DPL · Delmarva Power PECO · PECO Energy PSEG · PSE&G AEP · American Electric Power JCPL · Jersey Central Power & Light (FirstEnergy) DOM · Dominion Energy Virginia PPL · PPL Electric Utilities |
Names 55 substations: Auglaize, Bartonville, Basin, Bremo, Charlottesville, Chesterfield and 49 more. 14 projects, 14 with a printed cost estimate. | Substation Expansions: ComEd, APS, DEOK, DPL, PECO, PSEG, AEP, JCPL, DOM, PPL |
| 2025-10-17 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) ATSI · American Transmission Systems (FirstEnergy) DEOK · Duke Energy Ohio and Kentucky ComEd · Commonwealth Edison AEP · American Electric Power |
Names 77 substations: Abbe, Avon, Baileysville, Bedington, Bellevue, Belmont and 71 more. 46 projects, 46 with a printed cost estimate. | Substation Expansions: APS, ATSI, DEOK, ComEd, AEP |
| 2025-10-17 | Item 02 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 13 substations: Armstrong Substation, Belmon, Cecil, Charleroi, Enlow, Kiski Valley and 7 more. 5 projects, 5 with a printed cost estimate, 1 with a printed customer load (9.9 MW). | Substation Expansions: APS |
| 2025-10-17 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 5 substations: Carlisle, Fort Industry Substation, Johnson, North Hampton Substation, West Ravenna. 8 projects, 1 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-10-17 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 9 substations: Abert, East Leipsic, Good Hope SW, Lemaster, Lockbourne, Lockwood Road and 3 more. 5 projects, 2 with a printed cost estimate, 1 with a printed customer load (135 MW). | Substation Expansions: AEP |
| 2025-10-17 | Item 05 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 3 substations: Cherry Valley, Sandwich, State Line. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (179.4 MW). | Substation Expansions: ComEd |
| 2025-10-17 | Item 06 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 19 substations: AEP Thelma, Bekaert, Boone County, Budd, Clay Village, Joyes Station and 13 more. 4 projects, 1 with a printed cost estimate, 1 with a printed customer load (48 MW). | Substation Expansions: EKPC |
| 2025-10-16 | Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power PJM · PJM system-wide PSEG · PSE&G BGE · Baltimore Gas and Electric Met-Ed · Met-Ed (FirstEnergy) Penelec · Penelec (FirstEnergy) JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 59 substations: Bath Ave, Belle Haven, Belleville, Bergen, Blair Road, Cedar Grove and 53 more. 19 projects, 19 with a printed cost estimate. | Substation Expansions: DPL, PJM, PSEG, BGE, Met-Ed, Penelec, JCPL |
| 2025-10-16 | Item 03 - ACE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
No substation names extracted. 1 project, 1 with a printed customer load (40 MW). | Substation Expansions: ACE |
| 2025-10-16 | Item 04 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 2 substations: Keeney, Keeney EHV. 1 project, 1 with a printed cost estimate. | Substation Expansions: DPL |
| 2025-10-16 | Item 05 - PENELEC Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 3 substations: Hill Valley, Huntingdon, Raystown. 1 project. | Substation Expansions: Penelec |
| 2025-10-16 | Item 06 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 4 substations: Clinton, Lycoming, Muncy, West Damascus. 2 projects, 1 with a printed cost estimate. | Substation Expansions: PPL |
| 2025-10-16 | Item 07 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
No substation names extracted. 2 projects, 2 with a printed customer load (120 MW, 70 MW). | Substation Expansions: PSEG |
| 2025-10-16 | Item 08 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 12 substations: Bains Store, Bass, Bass DP, Bayside, Burton, Cradock Substation and 6 more. 5 projects, 1 with a printed cost estimate, 3 with a printed customer load (144.5 MW, 18 MW, 6.5 MW). | Substation Expansions: DOM |
| 2025-10-08 | Informational Only - ACE Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 3 substations: Pine Hill, Sickler, Stratford. 1 project, 1 with a printed cost estimate. | Substation Expansions: ACE |
| 2025-10-08 | Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 52 substations: Aladdin station, Bass, Bellard station, Bexley, Boundary station, Charger Station and 46 more. 15 projects, 15 with a printed cost estimate, 2 with a printed customer load (43 MW, 1100MW). | Substation Expansions: AEP |
| 2025-10-08 | Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 62 substations: Albright Substation, Arroyo Junction, Bedington, Bethel Park Substation, Black Oak, Blacksville No. 1 Tap and 56 more. 29 projects, 29 with a printed cost estimate, 2 with a printed customer load (~25 MW, approximately 300 MW). | Substation Expansions: APS |
| 2025-10-08 | Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 55 substations: Abbe, Angola, Avon, Bayshore, Beaver, Beaver Valley and 49 more. 21 projects, 21 with a printed cost estimate, 5 with a printed customer load (38.5 MW, 55 MW, 36 MWs, 19 MW, …). | Substation Expansions: ATSI |
| 2025-10-08 | Informational Only - BGE Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 3 substations: Granite, Waugh Chapel, Windy Edge. 9 projects, 9 with a printed cost estimate. | Substation Expansions: BGE |
| 2025-10-08 | Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 26 substations: Bloom, Burnham, ComEd Dierking, ComEd Elk Grove East, ComEd Itasca, ComEd Pine and 20 more. 15 projects, 15 with a printed cost estimate, 8 with a printed customer load (324 MW, 270 MW, 103 MW, 272.7 MW, …). | Substation Expansions: ComEd |
| 2025-10-08 | Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 11 substations: Aero, Clifty Creek, Constance, Donaldson, Limaburg, Markley and 5 more. 4 projects, 4 with a printed cost estimate, 1 with a printed customer load (500 MW). | Substation Expansions: DEOK |
| 2025-10-08 | Informational Only - DLCO Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 4 substations: Carson Substation, Dravosburg Substation, Findlay Substation, Neville Substation. 4 projects, 4 with a printed cost estimate. | Substation Expansions: DLCO |
| 2025-10-08 | Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 82 substations: Ahoskie Substation, Allman, Aquia Harbour, Bermuda Hundred, Brickyard, Bristow and 76 more. 38 projects, 38 with a printed cost estimate, 29 with a printed customer load (111.0 MW, 136 MW, 87.0 MW, 213.0 MW, …). | Substation Expansions: DOM |
| 2025-10-08 | Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 16 substations: Bonnieville, Bowen, Cooper, Crooksville, Cub Run, Dale and 10 more. 5 projects, 5 with a printed cost estimate. | Substation Expansions: EKPC |
| 2025-10-08 | Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 31 substations: Alderney, Chester Substation, Coke, Davis, Deep Run Substation, Englishtown and 25 more. 17 projects, 17 with a printed cost estimate, 2 with a printed customer load (13 MW, 30 MW). | Substation Expansions: JCPL |
| 2025-10-08 | Informational Only - MetEd Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 21 substations: Alcoa, Belfast, Broad St., Broad Street, Campbelltown Substation, Cleona and 15 more. 7 projects, 7 with a printed cost estimate, 4 with a printed customer load (11 MW, 31.8 MW, 78 MW, 39 MVA). | Substation Expansions: Met-Ed |
| 2025-10-08 | Informational Only - PECO Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Byberry, Neshaminy, Peach Bottom. 4 projects, 4 with a printed cost estimate. | Substation Expansions: PECO |
| 2025-10-08 | Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 13 substations: Altoona, Ashtabula, Eclipse Substation, Erie West, Forest Substation, Glade Substation and 7 more. 7 projects, 7 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-10-08 | Informational Only - PEPCO Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 1 substation: Mt. Zion Substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: Pepco |
| 2025-10-08 | Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 38 substations: Alburtis, ATTR, Avoca, Beavertown, Blooming Grove, Breinigsville and 32 more. 16 projects, 16 with a printed cost estimate, 6 with a printed customer load (350 MW, 1,000 MW, 1,000 MW, 350 MW, …). | Substation Expansions: PPL |
| 2025-10-08 | Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 8 substations: Bayonne, Cookstown, East Rutherford, Lumberton, Pemberton, PVSC and 2 more. 4 projects, 4 with a printed cost estimate, 1 with a printed customer load (35 MW). | Substation Expansions: PSEG |
| 2025-10-08 | Informational Only - WVPA Local Plan Submission of the Supplemental Projects for 2025 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM WVPA · Wabash Valley Power Alliance |
Names 2 substations: Elderberry Substation, Stillwell substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: WVPA |
| 2025-10-08 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 7 substations: Cedar Bridge, Drum Point, Lakewood, Leisure Village, Manitou, Silverton and 1 more. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (52 MW). | Substation Expansions: JCPL |
| 2025-10-08 | Item 06 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 5 substations: Forest Substation, Glade Substation, Johnstown, Seward, Shelocta. 3 projects, 2 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-10-08 | Item 07 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 1 substation: Navistar. 2 projects, 2 with a printed customer load (692MW, 750 MW). | Substation Expansions: AEP |
| 2025-10-08 | Item 08 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 1 substation: Airport Substation. 1 project, 1 with a printed customer load (300 MW). | Substation Expansions: Dayton |
| 2025-10-08 | Item 09 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 9 substations: Callender Gap, Eldred, Frackville, Gordon, Lackawanna, Sturges and 3 more. 2 projects, 2 with a printed cost estimate, 2 with a printed customer load (1,400 MW, 600 MW). | Substation Expansions: PPL |
| 2025-10-08 | Item 10 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 1 substation: North Philadelphia. 2 projects, 1 with a printed customer load (600 MW). | Substation Expansions: PECO |
| 2025-10-08 | Item 11 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 4 substations: Keslinger, Lockport, Lombard, Plano. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (210 MW). | Substation Expansions: ComEd |
| 2025-10-08 | Item 12 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 30 substations: Acadian, Alto Substation, Antique, Aphrodite, Artemis, Atlas and 24 more. 34 projects, 8 with a printed cost estimate, 34 with a printed customer load (300 MW, 100 MW, 202 MW, 300 MW, …). | Substation Expansions: DOM |
| 2025-10-08 | Item 13 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison APS · Allegheny Power (FirstEnergy) DEOK · Duke Energy Ohio and Kentucky DPL · Delmarva Power PECO · PECO Energy PSEG · PSE&G |
Names 22 substations: Bartonville, Chichester, Claymont, College Corner, Collinsville, Deep Creek and 16 more. 7 projects, 7 with a printed cost estimate. | Substation Expansions: ComEd, APS, DEOK, DPL, PECO, PSEG |
| 2025-09-19 | Item 01 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 5 substations: Apple Ave, Apple Ave subs, E. Wooster, East Wooster, Mineral Springs. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (60 MW). | Substation Expansions: AMPT |
| 2025-09-19 | Item 02 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 11 substations: Bethel Park Substation, Glen Falls Substation, Kiski Valley, North Washington, Oak Mound Substation, Price Hill Substation and 5 more. 5 projects, 2 with a printed cost estimate, 1 with a printed customer load (9.9 MW). | Substation Expansions: APS |
| 2025-09-19 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 11 substations: Carlisle, Firestone, Harper, Johnson, Pine, South Akron and 5 more. 4 projects, 2 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-09-19 | Item 04 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 5 substations: Dierking, Elk Grove East, Itasca, Pine, Sandwich. 5 projects, 2 with a printed cost estimate, 4 with a printed customer load (179.4 MW, 300 MW, 250 MW, 113 MW). | Substation Expansions: ComEd |
| 2025-09-19 | Item 05 - Dayton Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 6 substations: Botkins, Chippewa, Indian Lake, Indian Lakesubstation, St. Marys, Wrestle Creek. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (~16MW). | Substation Expansions: Dayton |
| 2025-09-19 | Item 06 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 28 substations: Aloe Vera SW, Baileysville, Busch, Calvin Switch, Canton Central, Carrollton and 22 more. 9 projects, 6 with a printed cost estimate, 6 with a printed customer load (312MW, 300MW, 7MW, 15 MW, …). | Substation Expansions: AEP |
| 2025-09-18 | Item 01 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 3 substations: Hughesville, Rutherford 69-12kV Substation, Rutherford distribution substation. 6 projects, 3 with a printed cost estimate. | Substation Expansions: PPL |
| 2025-09-18 | Item 02 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 7 substations: Cedar Park, Crystal Springs, Crystal Springs Tap, Dorsey Run, Dorsey Tap, High Ridge and 1 more. 2 projects. | Substation Expansions: BGE |
| 2025-09-18 | Item 03 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 1 substation: Waneeta. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2025-09-18 | Item 04 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 3 substations: Keeney, Keeney EHV, Red Lion. 2 projects, 1 with a printed cost estimate. | Substation Expansions: DPL |
| 2025-09-18 | Item 05 - PENELEC Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 11 substations: Carrolltown, Edinboro South, Erie South, Garman, Geneva, Morgan Street and 5 more. 3 projects, 3 with a printed cost estimate, 3 with a printed customer load (43 MW, 67 MW, 27 MW). | Substation Expansions: Penelec |
| 2025-09-18 | Item 06 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 8 substations: Disputanta Substation, Dominion substation, Emporia substation, Island Creek DP, Mayo Dunbar DP, Metcalf and 2 more. 10 projects, 1 with a printed cost estimate, 10 with a printed customer load (51 MW, 9.2 MW, 25 MW, 6.5 MW, …). | Substation Expansions: DOM |
| 2025-09-09 | Item 05 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 4 substations: 502 Junction Substation, Doubs, Kammer Substation, Lime Kiln. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (600 MVA). | Substation Expansions: APS |
| 2025-09-09 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 1 substation: West Wharton. 2 projects, 2 with a printed cost estimate. | Substation Expansions: JCPL |
| 2025-09-09 | Item 07 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 6 substations: Creekside, Darby Substation, Millcreek, Peoria, Shelby, Sidney. 3 projects, 2 with a printed cost estimate, 3 with a printed customer load (800 MW, 135 MW, 400 MW). | Substation Expansions: Dayton |
| 2025-09-09 | Item 08 - DLCO Supplemental Project Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 7 substations: Brunot Island, Carson Substation, Cheswick, Huntingdon, McGinley Substation, Springdale and 1 more. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (up to 250 MW). | Substation Expansions: DLCO |
| 2025-09-09 | Item 09 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 15 substations: Acahela, Big Bass, Callender Gap, Glen Brook, Harwood, Jenkins and 9 more. 5 projects, 2 with a printed cost estimate, 5 with a printed customer load (1,400 MW, 1,000 MW, 600 MW, 1,000 MW, …). | Substation Expansions: PPL |
| 2025-09-09 | Item 10 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Jenkintown, Whitemarsh, Whitpain. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2025-09-09 | Item 11 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 6 substations: Champlain, F street, Georgetown, I street, L street, Takoma. 1 project, 1 with a printed cost estimate. | Substation Expansions: Pepco |
| 2025-09-09 | Item 12 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 8 substations: Beverly Road, LaSalle, Libertyville, Lockport, Plano, Silver Lake and 2 more. 13 projects, 2 with a printed cost estimate, 12 with a printed customer load (600 MW, 504 MW, 860 MW, 1,000 MW, …). | Substation Expansions: ComEd |
| 2025-09-09 | Item 13 - BGE Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 1 substation: Riverside. 2 projects. | Substation Expansions: BGE |
| 2025-09-09 | Item 14 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 16 substations: Azalea Lane, Brambleton, Chesterfield, Chickahominy, Evergreen Mills, Ladysmith and 10 more. 4 projects, 4 with a printed cost estimate, 2 with a printed customer load (300 MW, 67.0 MW). | Substation Expansions: DOM |
| 2025-09-09 | Item 15 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 7 substations: Briggs Rd, Burlington, Cox’s Corner, Creek Rd, Lumberton, Mount Holly and 1 more. 1 project, 1 with a printed cost estimate. | Substation Expansions: PSEG |
| 2025-09-09 | Item 16 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM No single zone |
No substation names extracted. 134 projects. | Substation Expansions |
| 2025-08-15 | Item 01 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 8 substations: Cast, Genoa, Genoa South substation, Genoa’s North, Gypsy Lane, Gypsy Lane (Sub3) Station and 2 more. 2 projects, 1 with a printed cost estimate. | Substation Expansions: AMPT |
| 2025-08-15 | Item 02 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 5 substations: Bradley, Flag City, Kanawha, Muskingum, Pax Branch. 3 projects, 1 with a printed cost estimate, 3 with a printed customer load (200MW, 150MW, 7.5 MW). | Substation Expansions: AEP |
| 2025-08-15 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 11 substations: Carlisle, Ivanhoe, Kipling, Lamont/Liberty, Lincoln, Lloyd and 5 more. 4 projects, 3 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-08-15 | Item 04 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 8 substations: Gore Substation, Hampshire Substation, Leadsville Substation, Loughs Lane Substation, Rider, Weirton Substation and 2 more. 4 projects, 4 with a printed cost estimate. | Substation Expansions: APS |
| 2025-08-14 | Item 01 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
No substation names extracted. 1 project, 1 with a printed customer load (2MVA). | Substation Expansions: PPL |
| 2025-08-14 | Item 02 - DPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 1 substation: Red Lion. 1 project. | Substation Expansions: DPL |
| 2025-08-14 | Item 03 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 1 substation: Waneeta. 1 project. | Substation Expansions: PECO |
| 2025-08-14 | Item 04 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 1 substation: Windy Edge. 4 projects. | Substation Expansions: BGE |
| 2025-08-14 | Item 05 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 11 substations: Allen, Carlisle Pike, Cly, Dillsburg, Gardners, Mt Rose and 5 more. 3 projects, 2 with a printed cost estimate, 2 with a printed customer load (approximately 42 MW, approximately 18.8 MW). | Substation Expansions: Met-Ed |
| 2025-08-05 | Item 04 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 2 substations: 502 Junction Substation, Kammer Substation. 1 project. | Substation Expansions: APS |
| 2025-08-05 | Item 05 - MetEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 1 substation: South Reading Substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: Met-Ed |
| 2025-08-05 | Item 06 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 3 substations: Ashtabula, Erie West, Perry. 1 project, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-08-05 | Item 07 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 5 substations: East Lima, Fostoria Central, Hanging Rock, Maddox Creek, Muskingum. 5 projects, 5 with a printed customer load (1000MW, 1200MW, 900MW, 300 MW, …). | Substation Expansions: AEP |
| 2025-08-05 | Item 08 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Skokie. 1 project, 1 with a printed cost estimate. | Substation Expansions: ComEd |
| 2025-08-05 | Item 09 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 1 substation: Broadford. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-07-18 | Item 01 - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 12 substations: Clell, Clinch River, Clinchfield, Coal Creek, Garden Creek, Horn Mountain and 6 more. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-07-18 | Item 02 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 6 substations: Black Oak, Cherry Run, Cross School, Millville, Morgan, Sleepy Hollow. 3 projects. | Substation Expansions: APS |
| 2025-07-18 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 12 substations: Acme Hill Substation, Crossland, Firestone, Homer, Niles Substation, Rittman and 6 more. 5 projects, 3 with a printed cost estimate, 4 with a printed customer load (300 MVA, 7 MVA, 80 MVA, 6.5 MVA). | Substation Expansions: ATSI |
| 2025-07-18 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 13 substations: Boundary station, Cleveland, East Leipsic, FourFlag station, Ft Steuben, Hammondsville and 7 more. 10 projects, 3 with a printed cost estimate, 5 with a printed customer load (20 MW, 255 MW, 13.5MW, 12.1MW, …). | Substation Expansions: AEP |
| 2025-07-17 | Item 01 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 4 substations: Cleveland, Eldred, Lycoming, Muncy. 2 projects, 1 with a printed cost estimate. | Substation Expansions: PPL |
| 2025-07-11 | Ohio Power Company compliance tariffs (Schedule DCT, P.U.C.O. No. 21) in response to the July 9, 2025 Opinion and Order, Case No. 24-508-EL-ATA (PUCO-docketed filing; copy hosted by Ohio Capital Journal) Tariff · retrieved 2026-10-20 |
PJM Ohio Power Company (AEP Ohio) · OH |
Cited in the Ohio Power Company (AEP Ohio) record (Schedule DCT (Data Center Tariff); Public Utilities Commission of Ohio, docket 24-508-EL-ATA, 26-113-EL-ATA, 25-392-EL-AIR): source of 2 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2025-07-09 | PUCO Commission meeting minutes, July 9, 2025 Testimony or other commission document · retrieved 2026-10-20 |
PJM Ohio Power Company (AEP Ohio) · OH |
Cited in the Ohio Power Company (AEP Ohio) record (Schedule DCT (Data Center Tariff); Public Utilities Commission of Ohio, docket 24-508-EL-ATA, 26-113-EL-ATA, 25-392-EL-AIR): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2025-07-08 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 9 substations: Bayshore, Beaver Valley, Davis Besse, Hanna, Mansfield, Niles Substation and 3 more. 4 projects, 4 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-07-08 | Item 04 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 3 substations: Aladdin station, Desoto, Fall Creek. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-07-08 | Item 05 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 5 substations: Darby Substation, Eldean, Hutchings, Sidney, Urbana Substation. 5 projects, 5 with a printed customer load (135 MW, 180 MW, 400 MW, 300 MW, …). | Substation Expansions: Dayton |
| 2025-07-08 | Item 06 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
No substation names extracted. 1 project, 1 with a printed customer load (1,500 MW). | Substation Expansions: PPL |
| 2025-07-08 | Item 07 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Jenkintown, Whitemarsh, Whitpain. 1 project. | Substation Expansions: PECO |
| 2025-07-08 | Item 08 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 9 substations: Beckett, Cotton Run, Miami Fort, Millikin, Port Union, Todhunter and 3 more. 1 project, 1 with a printed customer load (800 MW). | Substation Expansions: DEOK |
| 2025-07-08 | Item 09 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 2 substations: McCarter Switching station, Newark switching station. 1 project, 1 with a printed cost estimate. | Substation Expansions: PSEG |
| 2025-07-08 | Item 10 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 4 substations: Chesterfield, Lanexa, Providence Forge, Turner. 1 project, 1 with a printed cost estimate. | Substation Expansions: DOM |
| 2025-07-08 | Item 11 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G BGE · Baltimore Gas and Electric PPL · PPL Electric Utilities |
Names 10 substations: Chanceford, Conastone, Conastone, Doubs, Farragut, Hudson and 4 more. 4 projects, 4 with a printed cost estimate. | Substation Expansions: PSEG, BGE, PPL |
| 2025-06-13 | Item 01 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 3 substations: Logistics Dr #2, Shelby Co, Shelby County. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (48 MW, 57 MW). | Substation Expansions: EKPC |
| 2025-06-13 | Item 02 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 3 substations: Badger, Jug St, Mink. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (25 MW, 279 MW). | Substation Expansions: AEP |
| 2025-06-13 | Item 03 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 4 substations: Channahon, Mazon, Morris CoGen tap, station Y764-2. 3 projects, 1 with a printed cost estimate, 1 with a printed customer load (52 MW). | Substation Expansions: ComEd |
| 2025-06-13 | Item 04 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 5 substations: Gypsy Lane, Niles Central, Poe Road, Sub #3 Gypsy Lane, Tontogany. 3 projects, 1 with a printed customer load (63 MW). | Substation Expansions: AMPT |
| 2025-06-13 | Item 05 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 12 substations: Black River, Campbellsport, Collins, Gates, Johnson, Johnson substations and 6 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-06-13 | Item 06 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 10 substations: Bethel Park Substation, Carnegie, Cherry Run, Harwick, Houseville Substation, McConnellsburg and 4 more. 1 project. | Substation Expansions: APS |
| 2025-06-12 | Item 01 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 3 substations: Briant Park, Morris Court Substation, Traynor. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (5 MVA). | Substation Expansions: JCPL |
| 2025-06-12 | Item 02 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 2 substations: Cly, Smith Street. 1 project, 1 with a printed cost estimate. | Substation Expansions: Met-Ed |
| 2025-06-12 | Item 03 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
No substation names extracted. 1 project. | Substation Expansions: Penelec |
| 2025-06-12 | Item 04 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 2 substations: Frackville, Hauto. 2 projects, 1 with a printed customer load (4MVA). | Substation Expansions: PPL |
| 2025-06-05 | Item 04 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 1 substation: Shelocta. 1 project. | Substation Expansions: Penelec |
| 2025-06-05 | Item 05 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 14 substations: Alburtis, Allentown, Callender Gap, Highspire, Hopatcong, Hummelstown and 8 more. 4 projects, 4 with a printed cost estimate, 4 with a printed customer load (500MW, 1000 MW, 450 MW, 500 MW). | Substation Expansions: PPL |
| 2025-06-05 | Item 06 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 3 substations: Barbadoes, Betzwood, Forge Spring Substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2025-06-05 | Item 07 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 4 substations: F street, Georgetown, I street, L street. 1 project. | Substation Expansions: Pepco |
| 2025-06-05 | Item 08 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 20 substations: Chesterfield, Chickahominy, Elmont, Four Rivers, Fredericksburg, Ladysmith and 14 more. 5 projects, 3 with a printed cost estimate, 2 with a printed customer load (108 MW, 162.0 MW). | Substation Expansions: DOM |
| 2025-06-05 | Item 09 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PJM · PJM system-wide |
Names 6 substations: 502 Junction, Amos, Black Oak, Rocky Point, Welton Spring, Woodside. 3 projects, 3 with a printed cost estimate. | Substation Expansions: PJM |
| 2025-05-16 | Item 01 - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 5 substations: Jenny Wiley SS, Kenwood, Prestonsburg, Thelma, Van Lear SS. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-05-16 | Item 02 - Dayton Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 2 substations: AEP Jay Substation, AES Ft Recovery. 1 project, 1 with a printed cost estimate. | Substation Expansions: Dayton |
| 2025-05-16 | Item 03 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 4 substations: Kenwood, Prestonsburg, Thelma, Van Lear SS. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-05-16 | Item 04 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 1 substation: Shelby County. 1 project, 1 with a printed customer load (57 MW). | Substation Expansions: EKPC |
| 2025-05-16 | Item 05 - ATSI Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 5 substations: Brush Wellman, Gates, Genoa, Johnson, Murray. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (20 MWs). | Substation Expansions: ATSI |
| 2025-05-16 | Item 06 - APS Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 12 substations: Bedington, Beverly Tap, Black Oak, Cross School, Durbin Tap, Hardy and 6 more. 5 projects, 3 with a printed cost estimate. | Substation Expansions: APS |
| 2025-05-15 | Item 01 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 2 substations: Finksburg, Westminster. 1 project, 1 with a printed cost estimate. | Substation Expansions: BGE |
| 2025-05-15 | Item 01 - SRRTEP South - Reliability Analysis Update Reliability analysis update · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 2 substations: Balcony Falls, Skimmer. 1 project, 1 with a printed cost estimate. | Substation Expansions: DOM |
| 2025-05-15 | Item 02 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 2 substations: Falconer, Warren. 1 project, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-05-06 | Item 05 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 3 substations: Atlanta, Clinton, Fayette. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (1.5 GW). | Substation Expansions: Dayton |
| 2025-05-06 | Item 06 - EKPC Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 8 substations: Goddard, Mason County 1, Mason County 2, Mason County 3, North Clark, Plumville and 2 more. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (2200 MW). | Substation Expansions: EKPC |
| 2025-05-06 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 7 substations: Glen Brook, Harwood, Nescopeck, Sunbury, Susquehanna, Susquehanna T10 and 1 more. 9 projects, 2 with a printed cost estimate, 9 with a printed customer load (10 MW, 500MW, 1000 MW, 450 MW, …). | Substation Expansions: PPL |
| 2025-05-06 | Item 08 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
No substation names extracted. 1 project, 1 with a printed customer load (800 MW). | Substation Expansions: DEOK |
| 2025-05-06 | Item 09 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 28 substations: Bermuda Hundred, Brickyard, Carson, Chickahominy, Clifton, Cloud and 22 more. 7 projects, 2 with a printed cost estimate, 5 with a printed customer load (300 MW, 100 MW, 78MW, 300MW, …). | Substation Expansions: DOM |
| 2025-05-06 | Item 10 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia AEP · American Electric Power PJM · PJM system-wide DPL · Delmarva Power PECO · PECO Energy |
Names 16 substations: Altavista, Bramah, Cash’s Corner, Cedar Creek, Charlottesville, Chickahominy and 10 more. 8 projects, 7 with a printed cost estimate. | Substation Expansions: DOM, AEP, PJM, DPL, PECO |
| 2025-04-17 | Georgia PSC — Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing, Docket No. 44280 (Word file) Commission order · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2025-04-11 | Item 01 - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 4 substations: Cherry Run, McConnellsburg, Morgan, Warfordsburg. 1 project, 1 with a printed cost estimate. | Substation Expansions: APS |
| 2025-04-11 | Item 02 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 2 substations: Front Street, West End. 1 project, 1 with a printed cost estimate. | Substation Expansions: DEOK |
| 2025-04-11 | Item 03 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 3 substations: Cynthiana Junction, KU’s EK Cynthiana T, Renaker. 1 project, 1 with a printed cost estimate. | Substation Expansions: EKPC |
| 2025-04-11 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 6 substations: Creek Walker, Edison, Fillmore Road, Kalamazoo, Moore Park, Olive. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (13.84MW, 90 MW). | Substation Expansions: AEP |
| 2025-04-11 | Item 05 - ATSI Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 7 substations: Crossland, Grand River, Homer, Leroy Center, Nursery Substation, Sharon and 1 more. 3 projects, 1 with a printed customer load (135 MW). | Substation Expansions: ATSI |
| 2025-04-11 | Item 06 - APS Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 18 substations: Blacksville No. 1 Tap, Brownsville Junction, Carnegie, Charleroi, Dutch Fork, Emerald Substation and 12 more. 6 projects, 3 with a printed cost estimate, 2 with a printed customer load (22 MVA, 20 MW). | Substation Expansions: APS |
| 2025-04-10 | Item 01 - Dominion Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 6 substations: Basin, Disputanta Substation, London Bridge Substation, Manchester, Maury Street substation, Plaza substation. 3 projects, 1 with a printed customer load (4 MW). | Substation Expansions: DOM |
| 2025-04-10 | Item 01 - PENELEC Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 4 substations: Altoona, Hollidaysburg, Tipton Substation, Tyrone North Substation. 2 projects, 2 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-04-10 | Item 02 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 9 substations: Franklin, Jacksonville Tap, Metedeconk, Montville, Old Bridge, Pequest River and 3 more. 6 projects, 5 with a printed cost estimate, 1 with a printed customer load (17 MW). | Substation Expansions: JCPL |
| 2025-04-01 | Item 03 - ATSI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 4 substations: Eastlake, Lloyd, Mayfield, Northfield. 1 project, 1 with a printed customer load (approximately 290 MW). | Substation Expansions: ATSI |
| 2025-04-01 | Item 04 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 5 substations: Elko Substation, Frederick A Substation, Monocacy Substation, Pruntytown Substation, Wylie Ridge Substation. 5 projects, 4 with a printed cost estimate. | Substation Expansions: APS |
| 2025-04-01 | Item 05 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 7 substations: Dumont, Goodings Grove, Green Acres, Navistar, New Prairie, Olive and 1 more. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (437MW). | Substation Expansions: AEP |
| 2025-04-01 | Item 06 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 3 substations: Atlanta, Clinton, Fayette. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (1.5 GW). | Substation Expansions: Dayton |
| 2025-04-01 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 2 substations: Frackville, Tresckow. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (1,440 MW, 350 MW). | Substation Expansions: PPL |
| 2025-04-01 | Item 08 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
No substation names extracted. 1 project, 1 with a printed customer load (1,550 MW). | Substation Expansions: ComEd |
| 2025-04-01 | Item 09 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 6 substations: Beckjord, Gold Finch, Newtown, Pierce, Red Bank, Silver Grove. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (300 MW). | Substation Expansions: DEOK |
| 2025-04-01 | Item 10 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 1 substation: Newark switching station. 1 project. | Substation Expansions: PSEG |
| 2025-04-01 | Item 11 - DOM Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 16 substations: Allman, Carmel Church Sub, Elmont, Enon substation, Four Rivers, Fredericksburg and 10 more. 6 projects, 4 with a printed cost estimate, 6 with a printed customer load (100 MW, 88.9 MW, 300 MW, 125.0 MW, …). | Substation Expansions: DOM |
| 2025-04-01 | Item 12 - WVPA Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM WVPA · Wabash Valley Power Alliance |
Names 2 substations: Elderberry Substation, Stillwell substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: WVPA |
| 2025-04-01 | Item 14 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia APS · Allegheny Power (FirstEnergy) |
Names 8 substations: Doubs, Golden, Lockridge, Loudoun, Mars, Morrisville and 2 more. 4 projects, 4 with a printed cost estimate. | Substation Expansions: DOM, APS |
| 2025-03-14 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 14 substations: Clell SS, Clinch River, Clinchfield, Coal Creek, Coronado substation, Garden Creek and 8 more. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-03-14 | Item 02 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 2 substations: Cynthiana Junction, Renaker. 1 project. | Substation Expansions: EKPC |
| 2025-03-14 | Item 03 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 4 substations: Devon, Northwest, Rosehill, Skokie. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (52 MW). | Substation Expansions: ComEd |
| 2025-03-14 | Item 04 - DLCO Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 4 substations: Carson Substation, Dravosburg Substation, Findlay Substation, Neville Substation. 4 projects, 4 with a printed cost estimate. | Substation Expansions: DLCO |
| 2025-03-14 | Item 05 - ATSI Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 6 substations: Bellevue, Black River, Groton, Harper, Johnson West, West Akron. 3 projects, 1 with a printed cost estimate, 1 with a printed customer load (71 MW). | Substation Expansions: ATSI |
| 2025-03-14 | Item 06 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 16 substations: Aero, Beaver, Claryville, Constance, Decoursey, Donaldson and 10 more. 4 projects, 4 with a printed cost estimate. | Substation Expansions: DEOK |
| 2025-03-14 | Item 07 - APS Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 13 substations: Arroyo, Bedington, Black Oak, East Liverpool, Fairview, Hardy and 7 more. 6 projects, 2 with a printed cost estimate. | Substation Expansions: APS |
| 2025-03-14 | Item 08 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 13 substations: Badger, Fiesta, Glen Lyn Station, Grandview Station, Hannibal, Hinton Station and 7 more. 7 projects, 4 with a printed cost estimate, 5 with a printed customer load (7MW, 279 MW, 103 MW, 266MW, …). | Substation Expansions: AEP |
| 2025-03-13 | Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power |
Names 7 substations: Claymont, Darley, Edge Moor, Linwood, Naamans, Silver Side Rd and 1 more. 1 project, 1 with a printed cost estimate. | Substation Expansions: DPL |
| 2025-03-13 | Item 02 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 5 substations: Galloping Hill, Roselle, Springfield Road, Stanley Terrace, Vauxhall. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (60 MW). | Substation Expansions: PSEG |
| 2025-03-13 | Item 03 - PENELEC Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 3 substations: Ashville, SGC Tap, Summit. 1 project, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-03-13 | Item 04 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 5 substations: Campbelltown Substation, Lincoln Substation, Middletown Junction, Orrtanna Substation, Swatara Hill. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (22 MVA). | Substation Expansions: Met-Ed |
| 2025-03-13 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 18 substations: Alderney, Belmar, Bradley Beach, Briant Park, Davis, Greystone and 12 more. 4 projects, 2 with a printed cost estimate, 3 with a printed customer load (6 MVA, 5 MVA, 8.5 MVA). | Substation Expansions: JCPL |
| 2025-03-04 | Item 04 - ATSI Supplemental Project Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 2 substations: Lallendorf Substation, Lemoyne. 2 projects, 2 with a printed cost estimate. | Substation Expansions: ATSI |
| 2025-03-04 | Item 05 - APS Supplemental projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 2 substations: Eaglehead Substation, Monocacy Substation. 1 project. | Substation Expansions: APS |
| 2025-03-04 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 5 substations: Chester Substation, Kittatinny, Pohatcong, West Wharton, Whippany. 3 projects, 3 with a printed cost estimate, 1 with a printed customer load (30 MW). | Substation Expansions: JCPL |
| 2025-03-04 | Item 07 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 4 substations: Forest Substation, Glade Substation, Lewis Run Substation, Warren. 1 project, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-03-04 | Item 08 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 20 substations: Babcock, Batesville, Dresser, Fairbanks, Fall Creek, Green Acres and 14 more. 1 project, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2025-03-04 | Item 09 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
No substation names extracted. 1 project, 1 with a printed customer load (350 MW). | Substation Expansions: PPL |
| 2025-03-04 | Item 10 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 4 substations: Bradford, Planebrook, Tredyffrin, Upper Merion. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (600MW). | Substation Expansions: PECO |
| 2025-03-04 | Item 11 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 17 substations: Babcock, Collins, Dresden, Eldamain, Green Acres, Katydid and 11 more. 3 projects, 3 with a printed cost estimate, 1 with a printed customer load (600 MW). | Substation Expansions: ComEd |
| 2025-03-04 | Item 12 - Dominion Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 4 substations: Elizabeth City, Enon substation, Shawboro, Trabue Substation. 3 projects, 1 with a printed cost estimate, 2 with a printed customer load (100 MW, 100MW). | Substation Expansions: DOM |
| 2025-03-04 | Item 13 - EKPC Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
No substation names extracted. 1 project, 1 with a printed customer load (2200 MW). | Substation Expansions: EKPC |
| 2025-03-04 | Item 14 - WVPA Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM WVPA · Wabash Valley Power Alliance |
Names 2 substations: Elderberry Substation, Stillwell substation. 1 project. | Substation Expansions: WVPA |
| 2025-02-19 | IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) Commission order · retrieved 2026-10-20 |
PJM Indiana Michigan Power Company · IN |
Cited in the Indiana Michigan Power Company record (Tariff I.P. (Industrial Power), Terms and Conditions for Customer at or Over 70 MW Individually or 150 MW in…; Indiana Utility Regulatory Commission, docket Cause No. 46097): source of 6 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2025-02-14 | Item 01 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 6 substations: Baker Rd, Baker Road, Greenlawn, Russia, Subler Drive, Water Street. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (16 MW). | Substation Expansions: AMPT |
| 2025-02-14 | Item 02 - DLCO Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 4 substations: Carson Substation, Dravosburg Substation, Findlay Substation, Neville Substation. 4 projects. | Substation Expansions: DLCO |
| 2025-02-14 | Item 03 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 9 substations: Aurora, Bilter Road, Devon, Electric Junction, Lisle, Lombard and 3 more. 4 projects, 3 with a printed cost estimate, 1 with a printed customer load (91 MW). | Substation Expansions: ComEd |
| 2025-02-14 | Item 04 - APS Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 10 substations: Albright Substation, Buckhannon Substation, French Creek, Shepherdstown Substation, Sleepy Hollow, Snowy Creek Tap and 4 more. 5 projects, 4 with a printed cost estimate. | Substation Expansions: APS |
| 2025-02-14 | Item 05 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 9 substations: Busch, Elcona, German, Greif, Hannibal, Huntley and 3 more. 8 projects, 1 with a printed cost estimate, 4 with a printed customer load (17MW, 7.5 MW, 17.5 MW, 200 MW). | Substation Expansions: AEP |
| 2025-02-14 | Item 06 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 11 substations: Aero, Beaver, Claryville, Constance, Decoursey, Limaburg and 5 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: DEOK |
| 2025-02-14 | Item 07 - ATSI Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 9 substations: Berlin Lake, Boardman, Canfield Steel Substation, Canfield substation, Ellsworth Substation, Kimberly and 3 more. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (19 MW). | Substation Expansions: ATSI |
| 2025-02-13 | Item 01 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 1 substation: Rutherford. 1 project. | Substation Expansions: PPL |
| 2025-02-13 | Item 02 - ACE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 3 substations: Pine Hill, Sickler, Stratford. 1 project, 1 with a printed cost estimate. | Substation Expansions: ACE |
| 2025-02-13 | Item 03 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 6 substations: Belsano, Glory, Nanty Glo, Spangler, Strongstown, Twin Rocks. 1 project, 1 with a printed cost estimate. | Substation Expansions: Penelec |
| 2025-02-13 | Item 04 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 2 substations: Raritan River Substation, Werner Substation. 2 projects, 2 with a printed cost estimate. | Substation Expansions: JCPL |
| 2025-02-13 | Item 05 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 3 substations: Granite, Waugh Chapel, Windy Edge. 9 projects, 9 with a printed cost estimate. | Substation Expansions: BGE |
| 2025-02-11 | Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) Tariff · retrieved 2026-10-20 |
SPP Evergy Kansas Central, Inc. · KS |
Cited in the Evergy Kansas Central, Inc. record (Schedule LLPS, Large Load Power Service (Evergy Kansas Central, Inc. & Evergy Kansas South, Inc., d.b.a.…; Kansas Corporation Commission, docket 25-EKME-315-TAR): source of 15 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2025-02-04 | Item 04 - ATSI Supplemental Project Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 6 substations: Lallendorf Substation, Laplaisance Creek, Lemoyne, Majestic, Maple, Monroe. 2 projects. | Substation Expansions: ATSI |
| 2025-02-04 | Item 05 - APS Supplemental Project Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 2 substations: Frederick A Substation, Monocacy Substation. 1 project. | Substation Expansions: APS |
| 2025-02-04 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 2 substations: Glen Gardner, Larrabee. 2 projects, 2 with a printed cost estimate. | Substation Expansions: JCPL |
| 2025-02-04 | Item 07 - Dayton Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 2 substations: Clinton, Fayette. 2 projects, 2 with a printed customer load (1.5 GW, 500 MW). | Substation Expansions: Dayton |
| 2025-02-04 | Item 08 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 1 substation: Dauphin Substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: PPL |
| 2025-02-04 | Item 09 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 1 substation: Peach Bottom. 1 project, 1 with a printed cost estimate. | Substation Expansions: PECO |
| 2025-02-04 | Item 10 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 1 substation: Beckjord Power Station. 1 project, 1 with a printed customer load (300 MW). | Substation Expansions: DEOK |
| 2025-02-04 | Item 11 - Dominion Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 17 substations: Chandler Sub, Cirrus, Culpeper, Duval, Kyser, Landstown and 11 more. 9 projects, 9 with a printed cost estimate, 6 with a printed customer load (100 MW, 298 MW, 100 MW, 100 MW, …). | Substation Expansions: DOM |
| 2025-02-04 | Item 12 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G JCPL · Jersey Central Power & Light (FirstEnergy) PJM · PJM system-wide |
Names 23 substations: Batavia Road, Bramah, Brighton, Burchess Hill, Clarksville, Conastone and 17 more. 4 projects, 4 with a printed cost estimate. | Substation Expansions: PSEG, JCPL, PJM |
| 2025-01-28 | Georgia PSC — Order Approving Revisions to Georgia Power Company's Rules and Regulations, Docket No. 44280 (Word file) Commission order · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2025-01-17 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission Dayton · AES Ohio (Dayton Power and Light) |
Names 3 substations: Miami, Rockford, Roller Creek. 2 projects, 2 with a printed cost estimate. | Substation Expansions: AMPT, Dayton |
| 2025-01-17 | Item 02 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 5 substations: Beaver, Claryville, Decoursey, White Tower, Wilder. 1 project. | Substation Expansions: DEOK |
| 2025-01-17 | Item 03 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Lombard. 2 projects. | Substation Expansions: ComEd |
| 2025-01-17 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 10 substations: Anguin, Bass, Industrial Park, Lawton Park, Lawton Switch, NBY-7 and 4 more. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (720 MW). | Substation Expansions: AEP |
| 2025-01-17 | Item 05 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 10 substations: Bogart substation, Chippewa substation, Greenfield, New Castle, Ravenna, Rye Beach and 4 more. 3 projects, 2 with a printed cost estimate, 1 with a printed customer load (approximately 40 MVA). | Substation Expansions: ATSI |
| 2025-01-16 | Item 01 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 4 substations: Belfast, Glendon, North Bangor, Northwood. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (78 MW). | Substation Expansions: Met-Ed |
| 2025-01-16 | Item 02 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 2 substations: Ridge Road Station, West Windsor Station. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (55 MW, 35 MW). | Substation Expansions: PSEG |
| 2025-01-16 | Item 03 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
No substation names extracted. 2 projects, 2 with a printed cost estimate, 2 with a printed customer load (45MW, 50MW). | Substation Expansions: PPL |
| 2025-01-07 | Item 05 - APS Supplemental Project Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 5 substations: Doubs, Lime Kiln, Pruntytown Substation, Quantum 400, Sage. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (300 MW). | Substation Expansions: APS |
| 2025-01-07 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 4 substations: Bridgewater, Gillette, Lake Nelson, Middlesex. 1 project, 1 with a printed cost estimate. | Substation Expansions: JCPL |
| 2025-01-07 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 3 substations: Alburtis, Juniata, New Buffalo. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (1,000 MW). | Substation Expansions: PPL |
| 2025-01-07 | Item 08 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 1 substation: Mt. Zion Substation. 1 project, 1 with a printed cost estimate. | Substation Expansions: Pepco |
| 2025-01-07 | Item 09 - DEOK Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 6 substations: Don Marquis, Hillcrest, Kyger Creek, Pierce, Stuart, Turner. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (2000 MW). | Substation Expansions: DEOK |
| 2025-01-07 | Item 10 - Dominion Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 8 substations: Bunker, Chickahominy, Elmont, Gray Bark, Portugee, Saltwood and 2 more. 4 projects, 4 with a printed cost estimate, 4 with a printed customer load (255.0 MW, 300.0 MW, 104.0 MW, 300.0 MW). | Substation Expansions: DOM |
| 2025-01-07 | Item 12 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM OVEC · Ohio Valley Electric Corporation AEP · American Electric Power ATSI · American Transmission Systems (FirstEnergy) DOM · Dominion Energy Virginia PJM · PJM system-wide |
Names 117 substations: 502 Jct, Altavista, Amos, Anderson, Anderson Branch, Ashburn Sub and 111 more. 17 projects, 17 with a printed cost estimate, 1 with a printed customer load (1.4GW). | Substation Expansions: OVEC, AEP, ATSI, DOM, PJM |
| 2024-12-13 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission Dayton · AES Ohio (Dayton Power and Light) ComEd · Commonwealth Edison |
Names 9 substations: Crawford, Elmhurst, Fisk, Miami, Rockford, Roller Creek and 3 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: AMPT, Dayton, ComEd |
| 2024-12-13 | Item 13 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 3 substations: Clay Village #2 distribution station, Clay Village distribution substation, Cooper. 2 projects, 2 with a printed cost estimate, 1 with a printed customer load (12 MW). | Substation Expansions: EKPC |
| 2024-12-13 | Item 14 - DEOK Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 2 substations: Miami Fort, Sutton Ridge. 1 project. | Substation Expansions: DEOK |
| 2024-12-13 | Item 15 - APS Supplemental Project Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 46 substations: Arroyo, Arroyo Junction, Back Fork, Belmon, Bethel Park Substation, Brownsville Jct and 40 more. 3 projects, 1 with a printed customer load (20 MW). | Substation Expansions: APS |
| 2024-12-13 | Item 16 - ATSI Supplemental projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 7 substations: Carlisle, Cook, Deer Creek, London, Longview, Lorain Substation and 1 more. 3 projects. | Substation Expansions: ATSI |
| 2024-12-13 | Item 17 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 13 substations: Amlin, Auburn, Butler, Celtic, Cyprus, Hayden and 7 more. 7 projects, 3 with a printed cost estimate, 4 with a printed customer load (461 MW, approximately 25 MW, approximately 300 MW, 675 MW). | Substation Expansions: AEP |
| 2024-12-12 | Item 01 - SRRTEP South - Reliability Analysis Update Reliability analysis update · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 10 substations: Alta Vista, Bell Ave, Bremo, Merck #5 substation, Oak Ridge, Pantego and 4 more. 5 projects, 5 with a printed cost estimate. | Substation Expansions: DOM |
| 2024-12-12 | Item 03 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 3 substations: Ahoskie Substation, Earleys, Tunis. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (25.1 MW). | Substation Expansions: DOM |
| 2024-12-12 | Item 08 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 4 substations: Ferndale, Gilbert, Jacksonville Tap, Montville. 1 project. | Substation Expansions: JCPL |
| 2024-12-12 | Item 09 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 7 substations: Cleona, Middletown Junction, North Boyertown, North Lebanon, Raintree, West Lebanon and 1 more. 3 projects, 2 with a printed cost estimate. | Substation Expansions: Met-Ed |
| 2024-12-12 | Item 10 - PSEG Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
No substation names extracted. 3 projects, 3 with a printed customer load (35 MW, 90 MW, 60 MW). | Substation Expansions: PSEG |
| 2024-12-12 | Item 11 - BGE Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 3 substations: Granite, Waugh Chapel, Windy Edge. 9 projects. | Substation Expansions: BGE |
| 2024-12-11 | Georgia Power — Request for Approval of Revisions to Rules and Regulations, Docket No. 44280 (with proposed tariff pages) Application or stipulation · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| 2024-12-03 | Item 04 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 2 substations: Pruntytown Substation, Ringgold. 3 projects. | Substation Expansions: APS |
| 2024-12-03 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 4 substations: Branchburg, East Flemington, Pleasant Valley, Windsor. 2 projects, 1 with a printed cost estimate, 1 with a printed customer load (31 MW). | Substation Expansions: JCPL |
| 2024-12-03 | Item 06 - Penelec Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 2 substations: Lewistown, Shingletown. 1 project. | Substation Expansions: Penelec |
| 2024-12-03 | Item 07 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 1 substation: Collins. 1 project. | Substation Expansions: ComEd |
| 2024-12-03 | Item 08 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 17 substations: Babcock, Dresser, Fairbanks, Fall Creek, Green Acres, Greentown and 11 more. 3 projects, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2024-12-03 | Item 09 - PSEG Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 3 substations: Cookstown, Lumberton, Pemberton. 1 project, 1 with a printed cost estimate. | Substation Expansions: PSEG |
| 2024-12-03 | Item 10 - Dominion Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 24 substations: Bermuda Hundred, Bristow, Chickahominy, Dawkins Branch, Devlin, Elk Run and 18 more. 9 projects, 7 with a printed cost estimate, 6 with a printed customer load (300 MW, 87.0 MW, 213.0 MW, 300.0 MW, …). | Substation Expansions: DOM |
| 2024-12-03 | Item 11 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power ACE · Atlantic City Electric DPL · Delmarva Power PECO · PECO Energy BGE · Baltimore Gas and Electric PPL · PPL Electric Utilities ComEd · Commonwealth Edison OVEC · Ohio Valley Electric Corporation ATSI · American Transmission Systems (FirstEnergy) DOM · Dominion Energy Virginia PJM · PJM system-wide |
Names 125 substations: 502 Jct, Adkins, Amos, Anderson Branch, Ashburn Sub, Aspen and 119 more. 28 projects, 28 with a printed cost estimate, 1 with a printed customer load (1115MW). | Substation Expansions: AEP, ACE, DPL, PECO, BGE, PPL, ComEd, OVEC, ATSI, DOM, PJM |
| 2024-11-19 | Item 1 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power ATSI · American Transmission Systems (FirstEnergy) |
Names 26 substations: Avery, Bay Shore, Bayshore, Beaver, Bokes Creek, Corridor and 20 more. 12 projects, 12 with a printed cost estimate. | Substation Expansions: AEP, ATSI |
| 2024-11-15 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power ComEd · Commonwealth Edison APS · Allegheny Power (FirstEnergy) DLCO · Duquesne Light |
Names 74 substations: Ballah SS, Beatty, Beatty Road, Benwood, Big Darby SS, Big Rock and 68 more. 29 projects, 29 with a printed cost estimate. | Substation Expansions: AEP, ComEd, APS, DLCO |
| 2024-11-15 | Item 02 - AMPT Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 3 substations: Bellevue, Carriage, Herbert. 1 project, 1 with a printed customer load (14 MW). | Substation Expansions: AMPT |
| 2024-11-15 | Item 03 - ComEd Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 2 substations: Aurora, Electric Junction. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (91 MW, 130 MW). | Substation Expansions: ComEd |
| 2024-11-15 | Item 04 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 9 substations: Bexley, Drew station, Fisher Body, Grant station, Hurricane, Ireland Road and 3 more. 4 projects, 1 with a printed cost estimate. | Substation Expansions: AEP |
| 2024-11-15 | Item 05 - APS Supplemental projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 23 substations: Belmont, Charleroi, Delmont Substation, Fairview, Glen Falls Substation, Gordonsville and 17 more. 7 projects, 1 with a printed cost estimate, 1 with a printed customer load (~25 MW). | Substation Expansions: APS |
| 2024-11-14 | Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power Met-Ed · Met-Ed (FirstEnergy) PECO · PECO Energy PSEG · PSE&G JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 19 substations: Bergen, Carlstadt, Chester Substation, Delaware City, East Rutherford, Fairlawn and 13 more. 8 projects, 8 with a printed cost estimate. | Substation Expansions: DPL, Met-Ed, PECO, PSEG, JCPL |
| 2024-11-14 | Item 01 - SRRTEP South - Reliability Analysis Update Reliability analysis update · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 2 substations: Merck #5 substation, Port Republic Substation. 4 projects, 4 with a printed cost estimate. | Substation Expansions: DOM |
| 2024-11-14 | Item 02 - UGI Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM UGI · UGI Utilities |
Names 3 substations: Hanover, Palooka, Plymouth. 1 project, 1 with a printed cost estimate. | Substation Expansions: UGI |
| 2024-11-14 | Item 03 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 3 substations: Beavertown, Middleburg, Sunbury. 3 projects, 1 with a printed cost estimate, 2 with a printed customer load (45MW, 50MW). | Substation Expansions: PPL |
| 2024-11-14 | Item 04 - MetEd Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 5 substations: Frystown, Muhlenberg Substation, North Temple, Rosedale, South Lebanon. 2 projects. | Substation Expansions: Met-Ed |
| 2024-11-14 | Item 05 - PENELEC Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 6 substations: Blairsville East, Cooper Substation, East Pike, Glory, Prospect Substation, Shelocta. 3 projects. | Substation Expansions: Penelec |
| 2024-11-14 | Item 06 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 6 substations: Bradley Beach, Deep Run Substation, Englishtown, Gilbert, Oceanview, Vernon. 5 projects, 4 with a printed cost estimate, 1 with a printed customer load (approximately 8.5 MVA). | Substation Expansions: JCPL |
| 2024-11-06 | Item 04 - APS Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 4 substations: Lime Kiln, Monocacy Substation, Montgomery, Wylie Ridge Substation. 4 projects, 1 with a printed cost estimate. | Substation Expansions: APS |
| 2024-11-06 | Item 05 - JCPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 4 substations: Gilbert, Martins Creek, Morris Park, Pequest River. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (13 MW). | Substation Expansions: JCPL |
| 2024-11-06 | Item 06 - MetEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 1 substation: North Hershey. 1 project, 1 with a printed cost estimate. | Substation Expansions: Met-Ed |
| 2024-11-06 | Item 07 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 6 substations: Allen, East Lima, Robison Park, RP Mone, Sorenson, Zodiac. 3 projects, 1 with a printed cost estimate, 2 with a printed customer load (437MW, 1200MW). | Substation Expansions: AEP |
| 2024-11-06 | Item 08 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 19 substations: Alburtis, Blooming Grove, Dillerville, Engleside, Greenland, Harwood and 13 more. 8 projects, 7 with a printed cost estimate, 4 with a printed customer load (1,000 MW, 350 MW, 350 MW, 1,000 MW). | Substation Expansions: PPL |
| 2024-11-06 | Item 09 - PECO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
No substation names extracted. 2 projects, 1 with a printed customer load (600MW). | Substation Expansions: PECO |
| 2024-11-06 | Item 10 - PEPCO Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM Pepco · Pepco |
Names 1 substation: Mt. Zion Substation. 1 project. | Substation Expansions: Pepco |
| 2024-11-06 | Item 11 - ComEd Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 5 substations: Bloom, Burnham, Davis Creek, Sheffield, State Line. 3 projects, 3 with a printed cost estimate. | Substation Expansions: ComEd |
| 2024-11-06 | Item 12 - Dominion Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 23 substations: Chandler Sub, Churchland, Dulles, Executive, Export, Global Plaza and 17 more. 17 projects, 5 with a printed cost estimate, 15 with a printed customer load (300 MW, 295 MW, 247.2 MW, in excess of 100 MW, …). | Substation Expansions: DOM |
| 2024-11-06 | Item 13 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric AEP · American Electric Power ComEd · Commonwealth Edison ACE · Atlantic City Electric DPL · Delmarva Power PECO · PECO Energy PPL · PPL Electric Utilities ATSI · American Transmission Systems (FirstEnergy) |
Names 80 substations: Acahela, Adkins, Avery, Bay Shore, Bayshore, Beatty and 74 more. 17 projects, 13 with a printed cost estimate. | Substation Expansions: BGE, AEP, ComEd, ACE, DPL, PECO, PPL, ATSI |
| 2024-10-23 | Joint Stipulation and Recommendation, PUCO Case No. 24-508-EL-ATA (Oct. 23, 2024), as filed as Exhibit JP-1S in Utah PSC Docket 24-035-04 Application or stipulation · retrieved 2026-10-20 |
PJM Ohio Power Company (AEP Ohio) · OH |
Cited in the Ohio Power Company (AEP Ohio) record (Schedule DCT (Data Center Tariff); Public Utilities Commission of Ohio, docket 24-508-EL-ATA, 26-113-EL-ATA, 25-392-EL-AIR): source of 2 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| 2024-10-18 | Item 01 - SRRTEP West - Reliability Analysis Update Reliability analysis update · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) DLCO · Duquesne Light AEP · American Electric Power ComEd · Commonwealth Edison |
Names 59 substations: AE2-072 (Lammer), Ballah SS, Beatty, Beatty Road, Benwood, Big Darby SS and 53 more. 27 projects, 27 with a printed cost estimate. | Substation Expansions: APS, DLCO, AEP, ComEd |
| 2024-10-18 | Item 02 - DLCO Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
No substation names extracted. 1 project, 1 with a printed customer load (250 MW). | Substation Expansions: DLCO |
| 2024-10-18 | Item 03 - APS Supplemental projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 8 substations: Junction Substation, North Shenandoah Substation, Oak Mound Substation, Page, Parr Run, Quiet Dell Substation and 2 more. 1 project. | Substation Expansions: APS |
| 2024-10-18 | Item 04 - ATSI Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 13 substations: Axtel, Baumhart, Bingham, Black River, Cook, Dale and 7 more. 3 projects, 1 with a printed cost estimate. | Substation Expansions: ATSI |
| 2024-10-18 | Item 05 - EKPC Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 6 substations: Bonnieville, Cub Run, Dale, Munfordville, Newby, Newby Distribution. 5 projects, 4 with a printed cost estimate. | Substation Expansions: EKPC |
| 2024-10-18 | Item 06 - AEP Supplemental Projects Supplemental projects deck · SRRTEP Western · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 26 substations: Bellard station, Bexley, Charger Station, East Lancaster, Etna Road, Green Chapel and 20 more. 8 projects, 5 with a printed cost estimate, 2 with a printed customer load (200 MW, 43 MW). | Substation Expansions: AEP |
| 2024-10-17 | Item 01 - DOM Supplemental Projects Supplemental projects deck · SRRTEP Southern · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 2 substations: Ahoskie Substation, Earleys. 1 project. | Substation Expansions: DOM |
| 2024-10-17 | Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update Reliability analysis update · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM DPL · Delmarva Power Met-Ed · Met-Ed (FirstEnergy) PECO · PECO Energy PSEG · PSE&G JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 11 substations: Chester Substation, Delaware City, Glades Substation, Kingsland 69kV Switch, Reybold Substation, Richmond and 5 more. 8 projects, 8 with a printed cost estimate. | Substation Expansions: DPL, Met-Ed, PECO, PSEG, JCPL |
| 2024-10-17 | Item 02 - PECO Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 2 substations: Byberry, Neshaminy. 3 projects, 3 with a printed cost estimate. | Substation Expansions: PECO |
| 2024-10-17 | Item 03 - PPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 3 substations: Beavertown, Grand Landmark, Palooka. 2 projects, 1 with a printed cost estimate. | Substation Expansions: PPL |
| 2024-10-17 | Item 04 - JCPL Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 6 substations: Coke, Island Heights, McGraw Hill, Ortley Beach, Windsor, Wyckoff Street. 2 projects, 1 with a printed cost estimate. | Substation Expansions: JCPL |
| 2024-10-17 | Item 05 - MetEd supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 2 substations: Carpenter Technology Substation, Riverview. 1 project. | Substation Expansions: Met-Ed |
| 2024-10-17 | Item 06 - Penelec Supplemental Projects Supplemental projects deck · SRRTEP Mid-Atlantic · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 6 substations: Belsano, Glory, Nanty Glo, Spangler, Strongstown, Twin Rocks. 1 project. | Substation Expansions: Penelec |
| 2024-10-08 | Informational Only - ACE Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ACE · Atlantic City Electric |
Names 7 substations: Beckett, Churchtown, Nortonville, Paulsboro, Quinton, Woodstown and 1 more. 3 projects, 3 with a printed cost estimate. | Substation Expansions: ACE |
| 2024-10-08 | Informational Only - AEP Local Plan submission of supplemental projects 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 218 substations: Albion, Anchor Hocking, Anguin, Apple Grove, Armory, Arroyo and 212 more. 38 projects, 38 with a printed cost estimate, 16 with a printed customer load (13MW, 12 MW, 450 MW, 28MW, …). | Substation Expansions: AEP |
| 2024-10-08 | Informational Only - AMPT Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM AMPT · AMP Transmission |
Names 20 substations: AES Tipp City sub, Canal, East Fayette, Enterprise, FE Napoleon, Hardin and 14 more. 5 projects, 5 with a printed cost estimate, 4 with a printed customer load (8 MW, 10MW, 43 MW, 40MW). | Substation Expansions: AMPT |
| 2024-10-08 | Informational Only - APS Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM APS · Allegheny Power (FirstEnergy) |
Names 159 substations: Albright Substation, All Ludlum 4 JCT, Allenport, Antietam, Antrim, Armstrong Substation and 153 more. 66 projects, 46 with a printed cost estimate, 11 with a printed customer load (576 MW, 300 MW, 360 MW, 5 MW, …). | Substation Expansions: APS |
| 2024-10-08 | Informational Only - ATSI Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 76 substations: Abbe, Adams, Andover, Angola, Beaver, Bingham and 70 more. 42 projects, 42 with a printed cost estimate, 19 with a printed customer load (6 MVA, 9.6 MVA, 25 MVA, 200 MVA, …). | Substation Expansions: ATSI |
| 2024-10-08 | Informational Only - BGE Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 4 substations: Pumphrey, Riverside, Waugh Chapel, Windy Edge. 10 projects, 10 with a printed cost estimate. | Substation Expansions: BGE |
| 2024-10-08 | Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ComEd · Commonwealth Edison |
Names 22 substations: Des Plaines, ESSB-427, Fordham, Franklin Park, Freeport, Goodings Grove and 16 more. 14 projects, 14 with a printed cost estimate, 4 with a printed customer load (210 MW, 113 MW, 13 MW, 42 MW). | Substation Expansions: ComEd |
| 2024-10-08 | Informational Only - DAYTON Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Dayton · AES Ohio (Dayton Power and Light) |
Names 18 substations: Air Park, Coldwater, Columbus Street, Eaker Substation, Fort Recovery, Kettlersville and 12 more. 5 projects, 4 with a printed cost estimate, 2 with a printed customer load (35MW, 35MW). | Substation Expansions: Dayton |
| 2024-10-08 | Informational Only - DEOK Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DEOK · Duke Energy Ohio and Kentucky |
Names 21 substations: Carlisle, Colerain, Dayton Technologies, Evendale, Foster, Kemper and 15 more. 10 projects, 10 with a printed cost estimate, 1 with a printed customer load (15 MW). | Substation Expansions: DEOK |
| 2024-10-08 | Informational Only - DLCO Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DLCO · Duquesne Light |
Names 4 substations: Brunot Island, Dravosburg Substation, Forbes, Veterans Bridge Substation. 3 projects, 3 with a printed cost estimate, 1 with a printed customer load (20 MW). | Substation Expansions: DLCO |
| 2024-10-08 | Informational Only - DOM Local Plan submission of supplemental projects 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 158 substations: Alexander Corner, Alleghany, Allen Creek, Allied, Altair, Anaconda and 152 more. 89 projects, 89 with a printed cost estimate, 58 with a printed customer load (134 MW, 134 MW, 63.3 MW, 147.0 MW, …). | Substation Expansions: DOM |
| 2024-10-08 | Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM EKPC · East Kentucky Power Cooperative |
Names 16 substations: Big Hill, Campbellsville, Coburg Junction, Green County, Hickory Plains, Holloway and 10 more. 16 projects, 16 with a printed cost estimate, 2 with a printed customer load (18 MW, 9 MW). | Substation Expansions: EKPC |
| 2024-10-08 | Informational Only - JCPL Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM JCPL · Jersey Central Power & Light (FirstEnergy) |
Names 60 substations: Allenhurst Substation, Atlantic, Bernardsville, Bradley Beach, Cheesequake, Chester Substation and 54 more. 68 projects, 67 with a printed cost estimate, 1 with a printed customer load (67 MW). | Substation Expansions: JCPL |
| 2024-10-08 | Informational Only - METED Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Met-Ed · Met-Ed (FirstEnergy) |
Names 38 substations: Allentown Cement, Baldy 69 kV Substation, Berks, Bernville, Birdsboro Extrusions Substation, Birdsboro Substation and 32 more. 17 projects, 17 with a printed cost estimate, 3 with a printed customer load (12 MVA, 13 MVA, 22 MVA). | Substation Expansions: Met-Ed |
| 2024-10-08 | Informational Only - ODEC Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM ODEC · Old Dominion Electric Cooperative |
Names 7 substations: Bayview, Cheriton, Cheriton/Bayview, Chincoteague station, Kellam, Tasley and 1 more. 2 projects, 2 with a printed cost estimate. | Substation Expansions |
| 2024-10-08 | Informational Only - PECO Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PECO · PECO Energy |
Names 12 substations: Bradford, Eddington, Flint, Holmesburg, Jarrett, Planebrook and 6 more. 6 projects, 6 with a printed cost estimate. | Substation Expansions: PECO |
| 2024-10-08 | Informational Only - PENELEC Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM Penelec · Penelec (FirstEnergy) |
Names 37 substations: Altoona, Blairsville East, Carlisle Pike, Dubois, East Sayre, East Towanda and 31 more. 17 projects, 16 with a printed cost estimate, 2 with a printed customer load (30 MW, 22 MW). | Substation Expansions: Penelec |
| 2024-10-08 | Informational Only - PSEG Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM PSEG · PSE&G |
Names 25 substations: Bayonne, Bennetts Lane, Deans, E Windsor, East Rutherford, Elizabeth and 19 more. 9 projects, 9 with a printed cost estimate, 1 with a printed customer load (8.0MW). | Substation Expansions: PSEG |
| 2024-10-08 | Informational Only - WVPA Local Plan submission of supplemental project 2024 Local plan submission · TEAC · retrieved 2026-10-16 |
PJM WVPA · Wabash Valley Power Alliance |
Names 9 substations: AEP-Marathon, AES-Marathon, Berne, Burr Oak, Macedon, Marathon and 3 more. 1 project, 1 with a printed customer load (14MW). | Substation Expansions: WVPA |
| 2024-10-08 | Item 05 - ATSI Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM ATSI · American Transmission Systems (FirstEnergy) |
Names 2 substations: Beaver, West Lorain Generation. 1 project, 1 with a printed cost estimate. | Substation Expansions: ATSI |
| 2024-10-08 | Item 06 - AEP Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM AEP · American Electric Power |
Names 6 substations: Dumont, Elderberry station, Larrison Drive, New Prairie, Olive, Sorenson. 2 projects, 1 with a printed cost estimate, 2 with a printed customer load (1000MW, 1100MW). | Substation Expansions: AEP |
| 2024-10-08 | Item 07 - PPL Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM PPL · PPL Electric Utilities |
Names 8 substations: Alburtis, Blooming Grove, East Palmerton, Harwood, Lackawanna, Siegfried and 2 more. 7 projects, 1 with a printed cost estimate, 3 with a printed customer load (350 MW, 1000MW, 1,000 MW). | Substation Expansions: PPL |
| 2024-10-08 | Item 08 - Dominion Supplemental Projects Supplemental projects deck · TEAC · retrieved 2026-10-16 |
PJM DOM · Dominion Energy Virginia |
Names 1 substation: Cloverhill Substation. 1 project, 1 with a printed cost estimate, 1 with a printed customer load (191.3 MW). | Substation Expansions: DOM |
| 2024-10-08 | Item 09 - Reliability Analysis Update Reliability analysis update · TEAC · retrieved 2026-10-16 |
PJM BGE · Baltimore Gas and Electric |
Names 1 substation: Conastone. 1 project, 1 with a printed cost estimate. | Substation Expansions: BGE |
| No date printed | Appalachian Power VA S.C.C. Tariff No. 28 (standard rate schedules, September 24, 2026 update), utility-hosted Tariff · retrieved 2026-10-20 |
PJM Appalachian Power Company · VA |
Cited in the Appalachian Power Company record (Large Power Service Rate Schedule (Schedule L.P.S.) — revised Terms and Conditions for Large Load Customers; State Corporation Commission, docket PUR-2025-00057): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| No date printed | Direct Testimony of William K. Castle for APCo, Case No. PUR-2026-00044 (SCC document control no. 260610077) Testimony or other commission document · retrieved 2026-10-20 |
PJM Appalachian Power Company · VA |
Cited in the Appalachian Power Company record (Large Power Service Rate Schedule (Schedule L.P.S.) — revised Terms and Conditions for Large Load Customers; State Corporation Commission, docket PUR-2025-00057): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| No date printed | Dominion Energy Virginia business rates and tariffs index (retrieved to check for a posted Schedule GS-5) Testimony or other commission document · retrieved 2026-10-20 |
PJM Virginia Electric and Power Company (Dominion Energy Virginia) · VA |
Cited in the Virginia Electric and Power Company (Dominion Energy Virginia) record (Rate Schedule GS-5; State Corporation Commission, docket PUR-2025-00058): source of 1 quoted term. | Large-Load Tariff Records Site Scanner reports |
| No date printed | Evergy Missouri Metro Schedule LLPS tariff sheets, P.S.C. MO. No. 7, Sheets 76-82 (and related riders), filed in EO-2025-0154 Tariff · retrieved 2026-10-20 |
SPP Evergy Missouri West, Inc. d/b/a Evergy Missouri West · MO |
Cited in the Evergy Missouri West, Inc. d/b/a Evergy Missouri West record (Schedule LLPS, Large Load Power Service (EMW P.S.C. MO. No. 1, Sheets 187-193; EMM P.S.C. MO. No. 7, Sheets…; Missouri Public Service Commission, docket EO-2025-0154). | Large-Load Tariff Records Site Scanner reports |
| No date printed | Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) Tariff · retrieved 2026-10-20 |
SPP Evergy Missouri West, Inc. d/b/a Evergy Missouri West · MO |
Cited in the Evergy Missouri West, Inc. d/b/a Evergy Missouri West record (Schedule LLPS, Large Load Power Service (EMW P.S.C. MO. No. 1, Sheets 187-193; EMM P.S.C. MO. No. 7, Sheets…; Missouri Public Service Commission, docket EO-2025-0154): source of 13 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| No date printed | Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) Tariff · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280): source of 7 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| No date printed | Georgia Power Electric Service Tariff — Time of Use - Supplier Choice, Schedule TOU-SC-16 (utility-hosted) Tariff · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280): source of 3 quoted terms. | Large-Load Tariff Records Site Scanner reports |
| No date printed | Georgia PSC — Order on Tariff Compliance Filing, Docket No. 44280 (signed scanned PDF of the same order; no text layer, no quotes drawn from it) Commission order · retrieved 2026-10-20 |
Not in an RTO Georgia Power Company · GA |
Cited in the Georgia Power Company record (Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission…; Georgia Public Service Commission, docket 44280). | Large-Load Tariff Records Site Scanner reports |
| No date printed | Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) Tariff · retrieved 2026-10-20 |
PJM Indiana Michigan Power Company · IN |
Cited in the Indiana Michigan Power Company record (Tariff I.P. (Industrial Power), Terms and Conditions for Customer at or Over 70 MW Individually or 150 MW in…; Indiana Utility Regulatory Commission, docket Cause No. 46097): source of 13 quoted terms. | Large-Load Tariff Records Site Scanner reports |
No documents match these filters.
* A PJM local plan posting carries no meeting date; the date shown is when pjm.com last modified the file. † The source publishes no date for the file; the date shown is when our weekly scan fetched it. ‡ Written by a language model that read the whole PDF; every name and number in it is printed in the PDF text, and a summary that failed that check is not shown. Not reviewed by a person.
What a summary contains
Summaries are built from what our pipelines already extracted, not written about the document. For a PJM deck that means the substations it names, the number of projects it lists, and how many of those print a cost estimate or a customer load. For a tariff document it is the record that cites it and how many of that record's quoted terms come from it. For a queue file it is the number of projects in the latest fetch.
That kind of summary is exact, but it is thin. It cannot say that a deck carries area maps, or what kind of work it describes. So the most recent PJM documents also have a written summary, marked ‡, from a language model that read the whole PDF, maps included. A written summary may say a deck has maps, but it may not name a place that is printed only on one: every name and number in it must appear in the PDF's text, or the summary is not shown. The extracted line stays underneath it.
Either way, a summary says what a document contains. It says nothing about capacity at any location.
Dates
A PJM meeting deck is dated by its meeting. A local plan posting has no meeting date, so it shows the date pjm.com last modified the file, marked as such. Tariff documents show the filing date they print; a tariff book with no printed date is listed last. Queue files show the date the source published them, or the date our weekly scan fetched them.
What is not here
Documents we use but do not read ourselves. The local moratoria dataset in the Site Scanner cites news stories and ordinances for each row, but that dataset is compiled by a third party, so its sources are not listed here.
Our base layers, such as HIFLD substations and EIA pipelines. Those are datasets, not documents, and each is cited where it is used.
Caveats carried with the data
- Summaries are built from what our pipelines extracted from each document: names and counts it prints. They do not describe maps, diagrams or narrative, and they say what a document contains, not what it shows about any site.
- Some recent PJM documents also carry a written summary from a language model that read the whole PDF. Every name and number in it was checked to be printed in the PDF text; a summary that failed the check is not shown. None has been reviewed by a person.
- PJM substation names are machine-extracted and each was checked to be printed in the PDF text; names that appear only on maps or diagrams are not counted.
- For PJM decks, the utility shown is the transmission zone and the company that zone is named for, not the retail utility serving an area.
- Third-party sources we use but do not read ourselves (such as the local moratoria dataset) are not listed.
Sources: PJM TEAC and SRRTEP meeting materials (670) · Documents cited by the large-load tariff records (29) · Interconnection queue files fetched by the weekly scan (4) · exported 2026-11-23.