Napoleon

Named in 2 PJM planning documents for 3 projects, on October 8, 2024.

Existingdescribed as
ATSIzone
138 kV, 69 kVkV as printed
6mentions

Also printed as: Napoleon Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in ATSI Transmission Zone M3 Process Napoleon, OH
AMPT-2023-005 · s3352.2
Not printed $7.1 M 10/2/2026 43 MW 2024-10-08
TEAC
ATSI Transmission Zone M-3 Process Napoleon – Richland – Stryker 138 kV Line
ATSI-2020-029 · s3371.1
Not printed $12 M 12/31/2026 Not printed 2024-10-08
TEAC
ATSI Transmission Zone M-3 Process Napoleon – Campbell Soup 69 kV Line Customer Connection
ATSI-2023-007 · s3132.1
Not printed $0.0M 3/31/2024 25 MVA 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $18.6 M → $7.1 M Not reported Not reported
Cost estimate $7.1 M → $18.6 M 2024-10-08 Not reported
Cost estimate $18.6 M → $7.1 M 2024-10-08 2024-10-08
In-service date 8/1/2026 (AMPT), 10/02/2026 (FE) → 10/2/2026 Not reported Not reported
In-service date 10/2/2026 → 8/1/2026 (AMPT), 10/02/2026 (FE) 2024-10-08 Not reported
In-service date 8/1/2026 (AMPT), 10/02/2026 (FE) → 10/2/2026 2024-10-08 2024-10-08
Substations named MIDWAY; NAPOLEON; RICHLAND; SULLIVAN → ENTERPRISE; MIDWAY; NAPOLEON; RICHLAND; SULLIVAN 2024-10-08 Not reported
Substations named ENTERPRISE; FE NAPOLEON; MIDWAY; RICHLAND; SULLIVAN → MIDWAY; NAPOLEON; RICHLAND; SULLIVAN 2024-10-08 2024-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 10
ATSI Transmission Zone M-3 Process Napoleon – Campbell Soup 69 kV Line Customer Connection No role wording
69 kV
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 107
AMPT Projects in ATSI Transmission Zone M3 Process Napoleon, OH “Convert the FE Napoleon 69 kV straight bus into a four-breaker ring bus”
69 kV
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 43
ATSI Transmission Zone M-3 Process Napoleon – Richland – Stryker 138 kV Line “Reconductor the Napoleon Muni Northside – Stryker 138 kV Line from Napoleon Substation to the Stryker Substation”
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 10
ATSI Transmission Zone M-3 Process Napoleon – Campbell Soup 69 kV Line Customer Connection No role wording
69 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 106
AMPT Projects in ATSI Transmission Zone M3 Process Napoleon, OH “Convert the FE Napoleon 69 kV straight bus into a four-breaker ring bus”
69 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 43
ATSI Transmission Zone M-3 Process Napoleon – Richland – Stryker 138 kV Line No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this