Mentions: December 2024
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2024-12-13 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 4 |
Miami Transformer | Miami | Cost $12M In service 6/30/2028 |
| 2024-12-13 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 6 |
Rockford-Roller Creek 69kV Reconductor | Rockford Roller Creek |
Cost 25.00M In service 12-31-2027 |
| 2024-12-13 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 9 |
Change No Load Taps at 6 stations b3914.1 |
Crawford Elmhurst Fisk Skokie Taylor West Loop |
Cost $289 K In service 4/15/2029 |
| 2024-12-13 | SRRTEP Western Item 13 - EKPC Supplemental Projects p. 3 |
Cooper, KY EKPC-2024-004 |
Cooper | Status Engineering Cost $0.656 M In service 06/01/2026 |
| 2024-12-13 | SRRTEP Western Item 13 - EKPC Supplemental Projects p. 5 |
Clay Village, KY EKPC-2023-009 |
Clay Village #2 distribution station New Clay Village distribution substation |
Status Engineering Cost $1.265 M In service 06/01/2026 Load 12 MW |
| 2024-12-13 | SRRTEP Western Item 14 - DEOK Supplemental Projects p. 3 |
Sutton Ridge-Miami Fort DEOK-2024-008 |
Miami Fort Sutton Ridge |
In service 6/1/2032 |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 3 |
New Customer Connection APS-2024-110 |
Dutch Fork Windsor |
In service 1/15/2026 Load 20 MW |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 4 |
Misoperation Relay Projects APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118 |
Back Fork Belmon Bethel Park Substation Brownsville Jct Buckhannon Substation Cecil Charleroi Cherry Run Eastgate Eastgate Tap Eldora Emerald Substation Enlow French Creek Gates Hill Substation Harwick Houseville Substation King Farm Leadsville Substation Loughs Lane Substation Luxor McAlpin McConnellsburg Mitchell Murrycrest Pickens Pruntytown Substation Shepler Hill Jct Smithton Tap Sony Springdale St Clair Stony Road Sunoco Delmont Warfordsburg Weirton Substation White Valley Whitehall Junction Wylie Ridge Substation Yukon |
No figures printed |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 7 |
Arroyo - East Liverpool – Wylie Ridge 138 kV Switch APS-2024-119 |
Arroyo Arroyo Junction East Liverpool South Chester Tap Wylie Ridge Substation |
No figures printed |
| 2024-12-13 | SRRTEP Western Item 16 - ATSI Supplemental projects p. 3 |
Deer Creek – London 138 kV Line ATSI-2024-007 |
Deer Creek London |
No figures printed |
| 2024-12-13 | SRRTEP Western Item 16 - ATSI Supplemental projects p. 5 |
Carlisle – Lorain 138 kV Misoperation Relays ATSI-2024-078 |
Carlisle Lorain Substation National Bronze Tap |
No figures printed |
| 2024-12-13 | SRRTEP Western Item 16 - ATSI Supplemental projects p. 7 |
Cook – Longview 69 kV Line ATSI-2024-079 |
Cook Longview |
No figures printed |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 3 |
AEP Transmission Zone: Supplemental S3441.1 and .4 Scope Change AEP-2021-OH049 & AEP-2023-OH041 · S3441.1 and .4 |
Amlin Celtic New Hayden Hyatt Jerome New Kileville New |
Status Engineering In service Jerome (1/30/2025, partially), Celtic (11/13/2025) Load 461 MW |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 8 |
Hamilton, IN AEP-2024-IM023 |
Auburn Butler |
No figures printed |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 9 |
Maliszewski, OH AEP-2024-OH045 |
Maliszewski | In service 6/1/2026 Load approximately 25 MW |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 10 |
Horizon, OH AEP-2024-OH046 |
Horizon New | In service 7/15/2026 Load approximately 300 MW |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 12 |
Summerhill, OH AEP-2024-OH015 |
Summerhill | Status Scoping (Conceptual) Cost $2.03 M In service 02/01/2027 |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 14 |
New Albany, OH AEP-2024-OH030 |
Souder New | Status Engineering Cost $9.1 M In service 12/24/2025 |
| 2024-12-13 | SRRTEP Western Item 17 - AEP Supplemental Projects p. 16 |
Columbus, Ohio AEP-2023-OH089 |
Cyprus | Status Scoping (Conceptual) Cost $2.635 M In service 10/01/2025 Load 675 MW |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 08 - JCPL Supplemental Projects p. 3 |
Automatic Restoration Projects JCPL-2024-050 and 052 |
Ferndale Gilbert Jacksonville Tap Montville |
No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 3 |
North Boyertown Substation ME-2024-024 |
North Boyertown | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 5 |
New Customer Connection ME-2019-053 |
Middletown Junction Raintree Willis Road (Smith Street) Substation |
Status Conceptual Cost $12.5M In service 12/31/2026 |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 09 - MetEd Supplemental Projects p. 7 |
Cleona Substation ME-2023-013 |
Cleona North Lebanon West Lebanon |
Status Conceptual Cost $9.5M In service 6/8/2026 |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 10 - PSEG Supplemental Projects p. 3 |
South Brunswick PSEG-2024-0005 |
None named | In service 06/2026 Load 35 MW |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 10 - PSEG Supplemental Projects p. 4 |
Piscataway PSEG-2024-0006 |
None named | In service 12/2026 Load 90 MW |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 10 - PSEG Supplemental Projects p. 5 |
Kenilworth Area PSEG-2024-0007 |
None named | In service 06/2026 Load 60 MW |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 3 |
Waugh Chapel Circuit Breaker B4 BGE-2024-002 |
Waugh Chapel | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 4 |
Waugh Chapel Circuit Breaker B7 BGE-2024-003 |
Waugh Chapel | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 5 |
Waugh Chapel Circuit Breaker B10 BGE-2024-004 |
Waugh Chapel | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 6 |
Waugh Chapel Circuit Breaker B12 BGE-2024-005 |
Waugh Chapel | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 7 |
Windy Edge Circuit Breaker B3 BGE-2024-006 |
Windy Edge | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 8 |
Windy Edge Circuit Breaker B4 BGE-2024-007 |
Windy Edge | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 9 |
Windy Edge Circuit Breaker B24 BGE-2024-008 |
Windy Edge | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 10 |
Windy Edge Circuit Breaker B28 BGE-2024-009 |
Windy Edge | No figures printed |
| 2024-12-12 | SRRTEP Mid-Atlantic Item 11 - BGE Supplemental Projects p. 11 |
Granite Circuit Breaker B2 BGE-2024-010 |
Granite | No figures printed |
| 2024-12-12 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 3 |
Line #23 Bell Ave to Suffolk 115 kV Partial Rebuild B3759 |
Bell Ave Oak Ridge Poe Suffolk |
Cost $41M In service 6/1/2027 |
| 2024-12-12 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 7 |
Merck #5 to Port Republic 115kV b3921.1 |
Merck #5 substation Port Republic Substation |
Cost $42.33M In service 6/1/2029 |
| 2024-12-12 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 9 |
Line #1031 Pantego to Terra 115kV b3922.1 |
Pantego Terra |
Cost $29.4M In service 6/1/2029 |
| 2024-12-12 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 12 |
Bremo 138/115kV Transformer #8 | Bremo | Status Cancelled Cost $.092M In service 6/1/2029 |
| 2024-12-12 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 14 |
Alta Vista 138/115kV Transformer #3 | Alta Vista | Status Cancelled Cost $5M In service 6/1/2029 |
| 2024-12-12 | SRRTEP Southern Item 03 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2024-0013 |
Ahoskie Substation Earleys Tunis |
Status Conceptual Cost $50M In service 12/31/2028 Load 25.1 MW |
| 2024-12-03 | TEAC Item 04 - APS Supplemental Projects p. 3 |
Ringgold No. 4 230/138 kV Transformer APS-2024-081 |
Ringgold | No figures printed |
| 2024-12-03 | TEAC Item 04 - APS Supplemental Projects p. 4 |
Pruntytown No. 2 500/138 kV Transformer APS-2024-078 |
Pruntytown Substation | No figures printed |
| 2024-12-03 | TEAC Item 04 - APS Supplemental Projects p. 5 |
Pruntytown No. 1 500/138 kV Transformer APS-2024-077 |
Pruntytown Substation | No figures printed |
| 2024-12-03 | TEAC Item 05 - JCPL Supplemental Projects p. 3 |
East Flemington Substation JCPL-2024-051 |
Branchburg East Flemington Pleasant Valley |
Load 31 MW |
| 2024-12-03 | TEAC Item 05 - JCPL Supplemental Projects p. 6 |
Windsor No. 3 230-34.5 kV Transformer JCPL-2024-020 |
Windsor | Status Conceptual Cost $9.7M In service 12/22/2028 |
| 2024-12-03 | TEAC Item 06 - Penelec Supplemental Projects p. 3 |
Lewistown – Shingletown 230 kV Line PN-2023-031 |
Lewistown Shingletown |
No figures printed |
| 2024-12-03 | TEAC Item 07 - ComEd Supplemental Projects p. 3 |
ComEd Transmission Zone M-3 Process ComEd-2024-023 |
Collins | In service 6/1/2033 |
| 2024-12-03 | TEAC Item 08 - AEP Supplemental Projects p. 3 |
Fall Creek, IN AEP-2024-IM013 |
Fall Creek | No figures printed |
| 2024-12-03 | TEAC Item 08 - AEP Supplemental Projects p. 4 |
Greentown, IN AEP-2024-IM018 |
Babcock Dresser Fairbanks Green Acres Greentown Gwynneville New Hanna Jefferson Lulu Olive Rockport Sorenson Sullivan Tanners Creek University Park |
In service 06/01/2032 |
| 2024-12-03 | TEAC Item 08 - AEP Supplemental Projects p. 6 |
Western Indiana and Central Ohio AEP-2023-IM015 |
Olive Reynolds |
Cost $452.64 M In service 05/30/2031 |
| 2024-12-03 | TEAC Item 09 - PSEG Supplemental Projects p. 3 |
Lumberton Area PSEG-2023-0011 |
Cookstown Lumberton Pemberton New |
Status Conceptual Cost $64.5M In service 12/2029 |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2024-0086 |
Landstown | No figures printed |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 4 |
Equipment Material Condition, Performance and Risk DOM-2024-0087 |
Landstown | No figures printed |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 6 |
Operational Flexibility and Efficiency DOM-2024-0027 |
Elk Run Loudoun Morrisville Remington CT Rollins Ford |
Status Engineering Cost $4M In service 6/01/2025 |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 8 |
Do No Harm Analysis DOM-2023-0013-DNH |
Dawkins Branch Devlin Gainesville Liberty Pegasus Railroad Rollins Ford Vint Hill |
Status Conceptual Cost $88.0M In service 06/15/2029 Load 300 MW |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 10 |
Pegasus 230kV Delivery – NOVEC DOM-2024-0047 |
Hornbaker Liberty Pegasus New Pioneer |
Status Engineering Cost $28.5M In service 04/14/2027 Load 87.0 MW |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 12 |
Bristow 230kV Delivery – NOVEC DOM-2024-0063 |
Bristow New Hornbaker Nokesville |
Status Engineering Cost $14.0M In service 04/30/2028 Load 213.0 MW |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 14 |
Meadowville 230kV Delivery - DEV DOM-2024-0023 |
Meadowville New Sloan Drive New |
Status Engineering Cost $36.9M In service Q1 2028 Load 300.0 MW |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 16 |
White Mountain 230kV Delivery - DEV DOM-2024-0024 |
Meadowville New Sloan Drive New White Mountain New |
Status Engineering Cost $19.0M In service Q1 2028 Load 100.0 MW |
| 2024-12-03 | TEAC Item 10 - Dominion Supplemental Projects p. 18 |
Customer Load Request DOM-2019-0021, DOM-2024-0022, DOM-2024-0023, DOM-2024-0024 - DNH |
Bermuda Hundred New Chickahominy Enon substation Meadowville New Sycamore Springs New |
Status Engineering Cost $92.7M In service Q4 2028 Load 300MW |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 29 |
Beatty – Adkins 345kV Station Upgrades b3877.1 |
Adkins Beatty Chenoweth |
Cost $5M In service 4/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 31 |
Canal – Gay St. 138kV Rebuild AEP-2023-OH024 |
Canal Gay Mound St |
Cost $15.595 M In service 12/31/2027 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 36 |
Cluster AEP-6 b3913.1 |
Beatty Road Cyprus |
Cost $33.113 M In service 4/30/2028 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 39 |
Delco Tap – Mickleton Facility Upgrades b3867.1 |
Delco Tap Mickleton |
Cost $1.03M In service 06/01/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 40 |
Milford and Cedar Creek Facility Upgrades b3866.1 |
Cedar Creek Milford |
Cost $0.200M In service 12/31/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 41 |
Elroy – Hosensack Facility Upgrades b3862.1 |
Elroy Hosensack |
Cost $1.5M In service 06/01/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 42 |
BGE Local N-1-1 b3906.1 |
Chestnut Hill Frederick Rd. Howard Marley Neck New North East Pumphrey Wagner |
Cost $107.62M In service 06/01/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 44 |
PECO Transmission Zone: Baseline b3907.1 |
Master North Philadelphia Richmond Waneeta |
Cost $43.22 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 46 |
Pocono area Evaluation Progress b3908.1 |
Pocono | Cost $4.93M In service 10/30/2027 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 48 |
PPL Transmission Zone: Baseline b3909.1 |
Glen Brook Juniata Susquehanna T10 |
Cost $22.2 M In service 3/30/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 50 |
Wilton Center BT 4-5 CB b3902.1 |
Wilton Center | Cost $2.7 M In service 12/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 52 |
Cluster 1 b3915.1 |
Dresden Mulberry |
Cost $16.27 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 55 |
Cluster 2 ComEd-2024-004 |
Busse Des Plaines Itasca |
Cost $14.31 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 59 |
Kyger Creek Upgrades | Kyger Creek Sporn |
Cost $0.8 M In service 4/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 61 |
Marysville Substation Upgrades | Marysville Sorenson |
Cost $10M In service 4/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 63 |
Clusters AEP- 3, 4, 5 2024-W1-408 |
Bokes Creek Corridor Hyatt Maliszewski Marysville West Millersport |
Cost $145.494 In service 12/31/2028 Load 1115MW |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 70 |
Cluster 2 (ATSI) | Avery Beaver Greenfield Hayes Lakeview Shinrock |
Cost $217.32M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 73 |
500kV Line #579 Rebuild (End of Life Criteria) DOM-O1 |
Septa Suffolk Thrasher Yadkin |
Cost $216.78 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 76 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-967 2024-W1-967 |
Elmont Kraken New Ladysmith North Anna Possum Point Yeat |
Cost $704.25 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 77 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-820 2024-W1-820 |
Bristers Elk Run Joshua Falls Meadowbrook Vint Hill Yeat New |
Cost $1,055.3 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 78 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-708 2024-W1-708 |
502 Jct Amos Aspen Black Oak Doubs Goose Creek Rocky Point New Welton Springs New Woodside |
Cost $1,944.98 M In service 12/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 79 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-551 2024-W1-551 |
Chanceford Doubs Goose Creek Woodside |
Cost $13.97 M In service 12/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 80 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-24 2024-W1-24 |
Anderson Branch Carson Chesterfield Cloud Cloverhill Elmont Gainesville Hornbaker Ladysmith Lakeview Locks Marsh Run Morrisville Nokesville Poe Prince George Raines Remington Sub Thelma Trident Tyler Wheeler |
Cost $672.43 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 83 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-781 2024-W1-781 |
Aspen Brambleton Goose Creek Morrisville Vint Hill Wishing Star |
Cost $34.03 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 84 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-81 2024-W1-81 |
Broadford Claytor Cloverdale Joshua Falls Leesville Otter Roanoke Smith Mountain |
Cost $137.02 M In service 12/31/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 87 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-617 2024-W1-617 |
Cloverdale Joshua Falls |
Cost $2.0 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 88 |
2024W1 – Regional Cluster Preferred Solution: 2024-W1-527 2024-W1-527 |
Brickyard Cloverhill Dave’s Store Dawkins Branch Hornbaker Ladysmith Remington CT Rixlew Spotsylvania Valley |
Cost $159.5 M In service 6/1/2029 |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 89 |
2024W1 – Regional Cluster Preferred Solution: Breaker Upgrades | Ashburn Sub Beaumeade Sub Braddock Sub Brambleton Bristers Bull Run Sub Buttermilk Sub Cabin Run Sub Doubs Evergreen Mills Sub Goose Creek Ladysmith Lockridge Sub Loudoun Sub Marsh Run Morrisville Mosby Sub North Anna Paragon Park Sub Pleasantview Sub Remington Sub Roundtable Yardley Sub |
Cost $88.09 M In service 6/1/2029 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.