Named in 2 PJM planning documents for 1 project, on July 7, 2026.

Existingdescribed as
DAYTONzone
345 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton Transmission Zone M-3 Process
Dayton-2025-001, Dayton-2025-002 - UPDATE
Engineering $589.8 M 01/2031 1.5 GW 2026-07-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$480 M → $589.8 M 2026-07-07 2026-07-07
Cost estimate $480 M → $589.8 M 2025-05-06 2026-07-07
In-service date 1/2031 → 01/2031 2025-02-04 2025-04-01
Status conceptual (Conceptual) → engineering (Engineering) 2025-05-06 2026-07-07
Substations named ATLANTA; CLINTON; FAYETTE → ATLANTA; CLAY; CLINTON; FAYETTE; GREENE 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-30* SRRTEP Western
Datyon local plan submission of the supplemental projects for 2026 RTEP p. 13
Dayton Transmission Zone M-3 Process “Relocating the existing Clinton – Greene 345 kV transmission Line”
345 kV
2026-07-07 TEAC
item 11 - Dayton Supplemental Projects p. 6
Dayton Transmission Zone M-3 Process No role wording
345 kV