Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to August 4, 2026.

Existingdescribed as
ATSIzone
138 kV, 345 kVkV as printed
4mentions

Also printed as: Dowling Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Supplemental s2237.2 Scope Change
ATSI-2019-082 · s2237.2
Conceptual $67M 5/14/2027 Not printed 2026-08-04
TEAC
ATSI Transmission Zone M-3 Process Dowling 138 kV Customer Connection
ATSI-2023-044 · s3361.1
Not printed $10.3M 11/30/2025 220 MW 2024-10-08
TEAC
Chrysler – Dowling 138kV Line
ATSI-2026-016
Not printed Not printed Not printed Not printed 2026-02-13
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 52
ATSI Transmission Zone M-3 Process Dowling 138 kV Customer Connection “Expand the existing Dowling Substation to a 12-breaker, breaker-and-a-half substation.”
138 kV
2026-08-04 TEAC
Item 04 - ATSI Supplemental Projects p. 8
Supplemental s2237.2 Scope Change “Replace the wave trap at Dowling 345 kV line”
345 kV
2026-02-13 SRRTEP Western
Item 04 - ATSI Supplemental Projects p. 4
Chrysler – Dowling 138kV Line No role wording
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 52
ATSI Transmission Zone M-3 Process Dowling 138 kV Customer Connection “Expand the existing Dowling Substation to a 12-breaker, breaker-and-a-half substation.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this