Substation Scout

Watkins Corner

Named in 2 PJM planning documents for 1 project, from April 14, 2026 to September 17, 2026.

Existingdescribed as
DOMzone
115 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk
DOM-2026-0017
Conceptual Not printed Provided in table Not printed 2026-09-17
SRRTEP Southern

Every mention

DateDocumentProjectWhat the document says about it
2026-09-17 SRRTEP Southern
Item 05 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk “Replace the 115 kV cap banks at Chancellor, Lancaster, Chase City, Watkins Corner”
115 kV
2026-04-14 SRRTEP Southern
Item 01 - DOM Supplemental Projects p. 5
Dominion Transmission Zone: Supplemental Equipment Material Condition, Performance Risk “The 115 kV cap banks needing replacement between 2027 and 2028 are located at Chancellor, Lancaster, Chase City, Watkins Corner”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this