Mentions: August 2025
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2025-08-15 | SRRTEP Western Item 01 - AMPT Supplemental Projects p. 3 |
Genoa, OH AMPT-2025-006 |
Cast Genoa Genoa South substation Genoa’s North South |
No figures printed |
| 2025-08-15 | SRRTEP Western Item 01 - AMPT Supplemental Projects p. 5 |
Bowling Green 3, OH AMPT-2025-003 |
Gypsy Lane Gypsy Lane (Sub3) Station Sub #3 Gypsy Lane |
Cost $3.2 M In service 10/30/2027 |
| 2025-08-15 | SRRTEP Western Item 02 - AEP Supplemental Projects p. 3 |
Muskingum River, OH AEP-2025-OH013 |
Muskingum | In service 02/01/2027 Load 200MW |
| 2025-08-15 | SRRTEP Western Item 02 - AEP Supplemental Projects p. 4 |
Flag City, OH AEP-2025-OH017 |
Flag City | In service 9/30/2027 Load 150MW |
| 2025-08-15 | SRRTEP Western Item 02 - AEP Supplemental Projects p. 6 |
Pax Branch, WV AEP-2025-AP004 |
Bradley Kanawha Pax Branch |
Status Engineering Cost 0 In service 11/14/2025 Load 7.5 MW |
| 2025-08-15 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 3 |
Wickliffe, Ohio ATSI-2025-022 |
Kipling Lamont/Liberty Lincoln Lloyd Marble |
No figures printed |
| 2025-08-15 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 5 |
Carlisle-Lorain 138 kV Line Relay Misoperation ATSI-2024-078 |
Carlisle Lorain Substation National Bronze Tap |
Status Conceptual Cost $3.58M In service 12/31/2027 |
| 2025-08-15 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 8 |
Ivanhoe – Packard 138 kV Customer ATSI-2024-047 |
Ivanhoe Packard |
Status Project Development (Conceptual) Cost $1.92M In service 7/28/2028 |
| 2025-08-15 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 10 |
Niles Substation Customer Connection ATSI-2025-019 |
Niles Substation | Status Conceptual Cost $0.09M In service 8/8/2029 |
| 2025-08-15 | SRRTEP Western Item 04 - APS Supplemental Projects p. 3 |
Leadsville – Loughs Lane 138 kV Misoperation Relays APS-2024-112 |
Leadsville Substation Loughs Lane Substation |
Status Conceptual Cost $2.30M In service 9/28/2029 |
| 2025-08-15 | SRRTEP Western Item 04 - APS Supplemental Projects p. 6 |
Weirton - Wylie Ridge 138 kV Misoperation Relays APS-2024-025 |
Weirton Substation Wylie Ridge Substation |
Status Conceptual Cost $4.50M In service 07/20/2029 |
| 2025-08-15 | SRRTEP Western Item 04 - APS Supplemental Projects p. 9 |
Rider – Weston 138 kV Line: Customer Connection APS-2025-011 |
Rider Weston Substation |
Status Conceptual Cost $0.92 M In service 4/29/2028 |
| 2025-08-15 | SRRTEP Western Item 04 - APS Supplemental Projects p. 11 |
Gore - Hampshire 138 kV Line APS-2024-029 |
Gore Substation Hampshire Substation |
Status Conceptual Cost $23.12M In service 12/29/2028 |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 01 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental
Keystone, PA PPL-2025-0016 |
None named | Load 2MVA |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 02 - DPL Supplemental Projects p. 3 |
DPL-2025-001 | Red Lion | No figures printed |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 03 - PECO Supplemental Projects p. 3 |
PE-2025-003 | Waneeta | No figures printed |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 3 |
Windy Edge Circuit Breaker B8 BGE-2025-003 |
Windy Edge | No figures printed |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 4 |
Windy Edge Circuit Breaker B9 BGE-2025-004 |
Windy Edge | No figures printed |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 5 |
Windy Edge Circuit Breaker B22 BGE-2025-005 |
Windy Edge | No figures printed |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects p. 6 |
Windy Edge Circuit Breaker B29 BGE-2025-006 |
Windy Edge | No figures printed |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 05 - MetEd Supplemental Projects p. 3 |
Violet Hill, PA ME-2025-002 |
Mt Rose Queen Street Violet Hill |
Load approximately 42 MW |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 05 - MetEd Supplemental Projects p. 5 |
Round Top Substation ME-2023-020 |
Allen Cly Dillsburg Gardners Newberry Round Top Substation Roundtop Substation |
Status Conceptual Cost $22.1M In service 6/2/2028 Load approximately 18.8 MW |
| 2025-08-14 | SRRTEP Mid-Atlantic Item 05 - MetEd Supplemental Projects p. 7 |
Carlisle Pike – Gardners 115 kV 976 Line ME-2024-008 |
Carlisle Pike Gardners |
Status Conceptual Cost $32.35M In service 12/21/2029 |
| 2025-08-05 | TEAC Item 04 - APS Supplemental Projects p. 3 |
Kammer Substation APS-2025-020 |
502 Junction Substation Kammer Substation |
No figures printed |
| 2025-08-05 | TEAC Item 05 - MetEd Supplemental Projects p. 3 |
South Reading Substation ME-2023-025 |
South Reading Substation | Status Conceptual Cost $20.4M In service 11/15/2027 |
| 2025-08-05 | TEAC Item 06 - Penelec Supplemental Projects p. 3 |
Perry – Ashtabula – Erie West 345 kV Line PN-2023-029 |
Ashtabula Erie West Perry |
Status Conceptual Cost $52.4 M In service 5/31/2027 |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 3 |
Hanging Rock, OH AEP-2025-OH014 |
Hanging Rock | In service 05/01/2029 Load 1000MW |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 4 |
Muskingum River, OH AEP-2025-OH015 |
Muskingum | In service 11/1/2028 Load 1200MW |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 5 |
Maddox Creek, OH/E. Lima, OH AEP-2025-OH016 |
East Lima | In service 12/31/2028 Load 900MW |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 6 |
E. Lima, OH/Fostoria Ctl, OH AEP-2025-OH018 |
East Lima Fostoria Central |
In service 9/30/2028 Load 300 MW |
| 2025-08-05 | TEAC Item 07 - AEP Supplemental Projects p. 7 |
Maddox Creek, OH AEP-2025-OH019 |
Maddox Creek | In service 12/31/2028 Load 500 MW |
| 2025-08-05 | TEAC Item 08 - ComEd Supplemental Projects p. 3 |
Skokie 345/138 kV Transformer 82 ComEd-2024-021 |
Skokie | Status Engineering Cost Phase 1: $ 9.04 M Phase 2: $ 15.36 M In service Phase 1: 12/31/2026, Phase 2: 12/31/2028 |
| 2025-08-05 | TEAC Item 09 - Reliability Analysis Update p. 5 |
AEP Transmission Zone: Baseline b4000.200 Cancellation b4000.200 |
Broadford | Status Cancellation (Cancelled) Cost $4.5 M In service 6/1/2029 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.