Substation Scout

Burma

Named in 6 PJM planning documents for 4 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
APSzone
115 kV, 138 kVkV as printed
6mentions

Also printed as: Burma Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Project
APS-2020-003, PN-2020-004 · s3542.1
Not printed $1.9 10/31/2025 Not printed 2025-10-08
TEAC
Misoperation Relay Projects
APS-2023-075, APS-2023-079 to APS-2023-084, APS-2023-086, APS-2023-087 · s3194.1, s3195.1, s3196.1, s3197.1, s3198.1, s3199.1, s3200.1, s3201.1, s3202.1
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2023-082, APS-2023-083, APS-2023-084 · s3198.1, s3199.1, s3200.1
Not printed Not printed Not printed Not printed 2026-09-08*
SRRTEP Western
Burma - Ridgway 138 kV Line
APS-2026-007
Conceptual $24.55 M 06/22/2029 Not printed 2026-10-16
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALL LUDLUM 4 JCT; ALLENPORT; ARMSTRONG; BRACKEN JCT; BREDINVILLE; BURMA; BUTLER; CABOT; CABREY JCT; CHARLEROI; DUPONT; EASTGATE T; EDGELAWN; FAIRVIEW; GRANT TOWN; LARKMEAD; LOYALHANNA; LUXOR; RIVESVILLE; SALTSBURG; SPRINGDALE; VANDERGRIFT; YOUNGWOOD; YUKON → BREDINVILLE; BUTLER; CABOT; SPRINGDALE 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Western
Item 01 - APS Supplemental Projects Presentation p. 20
Burma - Ridgway 138 kV Line “At Burma Substation: Upgrade substation conductor, and revise relay settings.”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 74
Misoperation Relay Projects “At Burma, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying”
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 7
Misoperation Relay Project “At Burma, replace line trap”
115 kV
2026-06-17 SRRTEP Western
Item 03 - APS Supplemental Projects p. 3
Burma - Ridgway 138 kV Line No role wording
138 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 7
Misoperation Relay Project “At Burma, replace line trap, substation conductor and relays.”
115 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 74
Misoperation Relay Projects “At Burma, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this