Bulk Mail Facility

Named in 4 PJM planning documents for 1 project, from January 16, 2026 to October 6, 2026.

Existingdescribed as
ATSIzone
138 kVkV as printed
4mentions

Also printed as: Bulk Mail Facility Station

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Bulk Mail Facility 138 kV
ATSI-2026-002 · s3945.1
Not printed $1.69M 12/31/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BULK MAIL FACILITY; FERNWAY TAP; PINE → BULK MAIL FACILITY; FERNWAY; FERNWAY TAP; PINE 2026-01-16 2026-05-15
Substations named BULK MAIL FACILITY; FERNWAY; FERNWAY TAP; PINE → BULK MAIL FACILITY 2026-05-15 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 54
Bulk Mail Facility 138 kV “Replace 138 kV breaker B-4 and three switches at Bulk Mail Facility Station.”
2026-09-23* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2026 RTEP p. 54
Bulk Mail Facility 138 kV “Replace 138 kV breaker B-4 and three switches at Bulk Mail Facility Station.”
2026-05-15 SRRTEP Western
Item 04 - ATSI Supplemental Projects p. 10
Bulk Mail Facility 138 kV “Replace 138 kV breaker B-4 and three switches at Bulk Mail Facility Station.”
138 kV
2026-01-16 SRRTEP Western
Item 04 - ATSI Supplemental Projects p. 4
Bulk Mail Facility 138 kV “The existing Bulk Mail Facility 138 kV breaker B4 is 61 years old”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this