Electric Junction
Named in 9 PJM planning documents for 5 projects, from October 18, 2024 to October 6, 2026.
Existingdescribed as
COMEDzone
138 kV, 345 kVkV as printed
9mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| ComEd Transmission Zone: Baseline
Electric Junction to W541 Reconductor b3901.1 |
Not printed | $1.657 M | 6/1/2029 | Not printed | 2024-11-15 SRRTEP Western |
| ComEd Transmission Zone: Baseline Electric Junction to W541 Reconductor | Not printed | $1.657 M | 6/1/2029 | Not printed | 2024-10-18 SRRTEP Western |
| Customer in Aurora ComEd-2024-002 · s3592.1 |
Engineering | $0M | 12/31/26 | 130 MW | 2025-10-08 TEAC |
| Customer in Aurora ComEd-2024-022 |
Engineering | $0M | 12/31/27 | 91 MW | 2025-02-14 SRRTEP Western |
| Plano 345 kV BT 5-6 CB ComEd-2025-022 · s4010 |
Conceptual | $3.9M | 12/31/2026 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | AURORA; ELECTRIC JUNCTION → ELECTRIC JUNCTION | 2024-11-15 | 2025-10-08 |
| Substations named | PLANO → ELECTRIC JUNCTION; PLANO | 2025-10-08 | 2025-11-04 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - ComEd Local Plan Submission of Supplemental Projects for 2026 p. 15 |
Plano 345 kV BT 5-6 CB | No role wording 345 kV |
| 2026-09-30* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2026 RTEP p. 15 |
Plano 345 kV BT 5-6 CB | No role wording 345 kV |
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 25 |
Customer in Aurora | “from Electric Junction substation to the customer site” 138 kV |
| 2025-11-04 | TEAC Item 11 - ComEd Supplemental Projects p. 8 |
Plano 345 kV BT 5-6 CB | No role wording 345 kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 25 |
Customer in Aurora | “lines from Electric Junction substation to the customer site” 138 kV |
| 2025-02-14 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 10 |
Customer in Aurora | No role wording 138 kV |
| 2024-11-15 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 6 |
Customer in Aurora | No role wording |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 59 |
ComEd Transmission Zone: Baseline Electric Junction to W541 Reconductor | “Replace 2" tubular bus, 2-500 KCMIL Cu and 1113 KCMIL
ACSR/AA on bus 2 and line terminal of 138kV L11106 at TSS 111
Electric Junction” 138 kV |
| 2024-10-18 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 53 |
ComEd Transmission Zone: Baseline Electric Junction to W541 Reconductor | “Replace 2" tubular bus, 2-500 KCMIL Cu and 1113 KCMIL
ACSR/AA on bus 2 and line terminal of 138kV L11106 at TSS 111
Electric Junction” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.