Substation Scout

Raikes Branch

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
AEPzone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Raikes Branch Delivery Point
AEP-2023-AP024 · s3388.1
Engineering $0 M 10/3/2024 5MW 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 102
Raikes Branch Delivery Point “Remove an existing wood pole structure on the Raikes Branch customer delivery line”
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 102
Raikes Branch Delivery Point “Remove an existing wood pole structure on the Raikes Branch customer delivery line”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this