Bridgewater

Named in 2 PJM planning documents for 2 projects, on January 7, 2025.

Existingdescribed as
JCPLzone
230 kVkV as printed
2mentions

Also printed as: Bridgewater Switch

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Middlesex 230 kV Switching Station
s3261.1
Not printed $8.85M FirstEnergy, $9.04M PSE&G 12/31/2027 Not printed 2025-01-07
TEAC
Middlesex 230 kV Switching Station
JCPL-2023-062 · s3261.1
Not printed $8.85M 6/1/2026 Not printed 2026-09-08*
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named MIDDLESEX → BRIDGEWATER; GILLETTE; LAKE NELSON; MIDDLESEX 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 37
Middlesex 230 kV Switching Station No role wording
230 kV
2025-01-07 TEAC
Item 06 - JCPL Supplemental Projects p. 4
Middlesex 230 kV Switching Station “At Bridgewater Switch and Lake Nelson Sub:  Replace primary and backup I-1023 line relays with new relays”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.