Substation Scout

Warrington

Named in 4 PJM planning documents for 2 projects, from October 8, 2024 to June 2, 2026.

Existingdescribed as
PECOzone
230 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Warrington 230 kV Bus Tie 7-8 Facility Upgrade
PE-2023-011 · s3183.1
Engineering $20k 3/8/2024 Not printed 2024-10-08
TEAC
PECO Transmission Zone
PE-2026-012
Engineering $582k 10/10/2026 Not printed 2026-06-02
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named JARRETT; WARRINGTON; WHITPAIN → WARRINGTON 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PECO local plan submission for 2024 RTEP p. 7
Warrington 230 kV Bus Tie 7-8 Facility Upgrade “Replace existing 1590 ACSR station cable adjacent to breaker 875 within Warrington Bus Tie 7-8 Facility”
230 kV
2026-06-02 TEAC
Item 08 - PECO Supplemental Projects p. 7
PECO Transmission Zone “At Buckingham and Warrington, replacement of 230kV line relays”
230 kV
2026-05-08 TEAC
Item 07 - PECO Supplemental Projects p. 3
PECO Transmission Zone No role wording
2024-10-08 TEAC
Informational Only - PECO Local Plan submission of supplemental project 2024 p. 6
Warrington 230 kV Bus Tie 7-8 Facility Upgrade “Replace existing 1590 ACSR station cable adjacent to breaker 875 within Warrington Bus Tie 7-8 Facility”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this