Named in 2 PJM planning documents for 1 project, on March 13, 2025.

Existingdescribed as
PSEGzone
69kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Kenilworth Data Center, NJ
PSEG-2024-0007
Conceptual $66.8M 06/01/2029 60 MW 2025-03-13
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 06/01/2029 → 06/2029 2025-03-13 Not reported
In-service date 06/2026 → 06/01/2029 2024-12-12 2025-03-13
Status conceptual (Conceptual) → engineering (Engineering and Planning) 2025-03-13 Not reported
Substations named GALLOPING HILL; ROSELLE; SPRINGFIELD ROAD; STANLEY TERRACE; VAUXHALL → GALLOPING HILL; ROSELLE; STANLEY TERRACE 2025-03-13 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2025 RTEP p. 11
Kenilworth Data Center, NJ “Cut and loop the 69kV (prior approved) line from Roselle to Galloping Hill into the customer’s new substation.”
69kV
2025-03-13 SRRTEP Mid-Atlantic
Item 02 - PSEG Supplemental Projects p. 4
Kenilworth Data Center, NJ “Install cap bank at Roselle, Galloping Hill, and customer substation.”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.