Newton Falls
Named in 5 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
ATSIzone
138 kV, 138/69 kV, 69 kVkV as printed
7mentions
Also printed as: Newton Falls Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| ATSI Transmission Zone M-3 Process
Milton – Newton Falls 69 kV Line ATSI-2022-027 · s3467.1 |
Not printed | $45.92 M | 12/29/2028 | 44.65 MVA | 2024-10-08 TEAC |
| Newton Falls 138/69 kV Substation ATSI-2022-031 · s3877.1 |
Not printed | $51.52M | 12/21/2028 | 69 MW | 2026-10-06 TEAC |
| ATSI Transmission Zone M-3 Process
Newton Falls 69 kV Breaker ATSI-2023-027 · s3193.1 |
Not printed | $1.0M | 02/02/2024 | Not printed | 2024-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BRIDGE; EVERGREEN; FRANKLIN; IVANHOE; NEWTON FALLS; OHIO STAR FORGE; WHITMAN → BRIDGE; EVERGREEN; FRANKLIN; IVANHOE; NEWTON FALLS; NEWTON FALLS 138; OHIO STAR FORGE; WHITMAN | 2026-10-06 | Not reported |
| Substations named | BRIDGE; EVERGREEN; FRANKLIN; GM LORDSTOWN; HANNA; IVANHOE; NEWTON FALLS; NEWTON FALLS 138; OHIO STAR FORGE; WHITMAN → BRIDGE; EVERGREEN; FRANKLIN; IVANHOE; NEWTON FALLS; OHIO STAR FORGE; WHITMAN | 2025-12-12 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 28 |
Newton Falls 138/69 kV Substation | “Convert Newton Falls Substation 138 kV yard into a six-breaker ring bus” 138/69 kV |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 29 |
Newton Falls 138/69 kV Substation | “Convert Newton Falls Substation 138 kV yard into a six-breaker ring bus” 138 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 35 |
ATSI Transmission Zone M-3 Process Newton Falls 69 kV Breaker | “At Newton Falls Substation
For Garrettsville South 69 kV Line, replace circuit breaker B30.” 69 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 72 |
ATSI Transmission Zone M-3 Process Milton – Newton Falls 69 kV Line | No role wording 69 kV |
| 2025-12-12 | SRRTEP Western Item 13 - ATSI Supplemental Projects p. 8 |
Newton Falls 138/69 kV Substation | “Convert Newton Falls Substation 138 kV yard into a six-breaker ring bus by installing three new 138
kV breakers.” 138 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 37 |
ATSI Transmission Zone M-3 Process Newton Falls 69 kV Breaker | “replace circuit breaker B30.” 69 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 73 |
ATSI Transmission Zone M-3 Process Milton – Newton Falls 69 kV Line | No role wording 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.