Swanson station

Named in 3 PJM planning documents for 1 project, from July 18, 2025 to October 8, 2025.

Existingdescribed as
AEPzone
69kVkV as printed
3mentions

Also printed as: Swanson

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Supplemental S2167 Scope Change
AEP-2018-IM002, AEP-2019-IM035, AEP-2019-IM025, AEP-2019-IM046 · S2167
Conceptual $125.8M 3/13/2026 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$101.3M → $125.8M Not reported Not reported
Cost estimate
prior value printed on the same page
$101.3M → $125.8M 2025-07-18 2025-07-18
Cost estimate
prior value printed on the same page
$101.3M → $125.8M 2025-10-08 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2025 RTEP p. 39
AEP Transmission Zone: Supplemental S2167 Scope Change “rebuild Swanson on existing property at the site in the clear”
69kV
2025-10-08 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 39
AEP Transmission Zone: Supplemental S2167 Scope Change “rebuild Swanson on existing property at the site in the clear”
2025-07-18 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 3
AEP Transmission Zone: Supplemental S2167 Scope Change “rebuild Swanson on existing property at the site in the clear”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.