Substation Scout

Sand Hills

Named in 4 PJM planning documents for 1 project, from November 13, 2025 to October 6, 2026.

Not stateddescribed as
PSEGzone
69kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PSE&G Central Territory
PSEG-2025-0006 · s3808
Engineering $25.1M 12/31/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status conceptual (Conceptual) → engineering (Engineering and Planning) 2025-12-11 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2026.xlsx p. 6
PSE&G Central Territory No role wording
69kV
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2026 RTEP p. 6
PSE&G Central Territory No role wording
69kV
2025-12-11 SRRTEP Mid-Atlantic
Item 12 - PSEG Supplemental Projects p. 7
PSE&G Central Territory No role wording
69kV
2025-11-13 SRRTEP Mid-Atlantic
Item 06 - PSEG Supplemental Projects - Version 2 p. 3
PSE&G Central Territory No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.